Planning application
47 - 50 Mark Lane London EC3R 7QQ
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
EIA Screening Opinion Request in respect of redevelopment proposal at 47-50 Mark Lane.
As published by the council, reference 22/01206/SCOP
Application record
- Reference
- 22/01206/SCOP
- Type
- Scoping/Screening Opinion
- Status
- Decided
- Decision
- Approved
- Received
- 25 Nov 2022
- Validated
- 25 Nov 2022
- Decided
- 28 Feb 2023
- Ward
- Tower
- Decision by
- Delegated Decision
- Postcode
- EC3R 7QQ
Timeline
Dates from the published record
-
25 Nov 2022
Received by City of London
-
28 Feb 2023
Decision issued: Approved
-
10 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
47-50 Mark Lane London EC3R 5AS
Submission of the Utility Connection Requirements pursuant to Schedule 3 Paragraph 10.1 of the S106 Agreement dated 19 September 2023 (Planning Application Reference: 22/01245/FULMAJ) as amended by the Deed of Variation dated 24 March 2025 (Planning Application Reference: 24/01044/FULL).
Granted 5 docs -
47-50 Mark Lane London EC3R 5AS
Submission of details of archaeological evaluation report in accordance with the Written Scheme of Investigation pursuant to condition 10 part a & b of Planning permission 24/01044/FULL dated 25.03.2025.
Granted Conditions 8 docs -
47-50 Mark Lane London EC3R 5AS
Submission of details of Public Impact Strategy pursuant to condition 11 of Planning permission 24/01044/FULL dated 25.03.2025 wording amended via planning permission 25/01737/NMA dated 16.01.2026.
Granted Conditions 6 docs -
47-50 Mark Lane London EC3R 5AS
Submission of enlistment to the Non-Road Mobile Machinery Register pursuant to condition 24 of planning permission 22/01245/FULMAJ dated 20 September 2023, as amended by 24/01044/FULL on 25 March 2024.
Granted Conditions 5 docs -
47-50 Mark Lane London EC3R 5AS
Submission of a site survey and survey of highway and other land at the perimeter of the site indicating the proposed finished floor levels at basement and ground floor levels in relation to the existing Ordnance Datum levels of the adjoining streets and open spaces pursuant to condition 7 of planning permission 24/01044/FULL dated 25/03/2025.
Granted Conditions 10 docs -
47-50 Mark Lane London EC3R 5AS
100% historically approved · decision due ~18 Feb
Submission of an update to the approved Whole Life-Cycle Carbon assessment to reaffirm the proposed strategy or demonstrate improvements pursuant to condition 8 of planning permission 24/01044/FULL dated 25/03/2025.
Awaiting decision Conditions 5 docs
Other outline applications
In City of London
-
25/01422/DPAR Granted
4 Lindsey Street London EC1A 9HP
An application for Prior Approval under Schedule 2, Part 14, Class J of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) for the installation of solar PV panels on the roof of the building.
-
25/00905/PIP Refused
Baltic Street West London EC1Y 0ST
Application for Permission in Principle for the erection a self-build single storey dwelling with detached single storey garage and gardens on the existing paved pedestrian open space with 2no mature trees to be retained.
-
25/01217/DPAR Granted
15 Fetter Lane London EC4A 1BW
Determination under Schedule 2, Part 14, Class J of the Town and Country Planning (General Permitted Development) Order 2015 as to whether prior approval is required for the installation of Photovoltaic Panels on the roof of the building.
-
25/00001/DPAR Granted
Tower Place West Tower Place London EC3R 5BU
Determination under Schedule 2, Part 14, Class J of the Town and Country Planning (General Permitted Development) Order 2015 as to whether prior approval is required for the installation of Photovoltaic Panels on the roof of the building.
-
24/01245/SCOP Granted
1 Silk Street London EC2Y 8AL
The City of London Corporation has received a request for an EIA Scoping Opinion under regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the redevelopment of the site at 1 Silk Street. The proposed development comprises demolition of the existing buildings retaining the basement and erection of a single building comprising ground floor and up to 20 storeys with a maximum height of 95.9m AOD for office (Use Class E(g)) and complementary uses including retail, food and beverage, professional services, indoor sport, health, learning and local community (Use Classes E(a/b/c/d/e) and F1/F2); formation of new public routes and spaces through the site; provision of landscaping within the site and along adjoining streets, including Silk Street; and ancillary uses and plant.