Planning application
Conference Centre Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Internal and External works at Levels 4 and 5 of Frobisher Crescent comprising of: (i) the removal and modification of existing services and wall mounted storage heaters and electric heaters; (ii) the installation of LTHW pipework; (iii) the installation of extract ductwork in new bulkheads; (iv) the installation of ASHPs and associated works in plant rooms; (v) the installation of wall mounted radiators; (vi) the installation of paint finished metal louvre grill to plant rooms; (vii) the installation of hardwood timber louvre insets into existing sliding window and openings of plant rooms; and (viii) the installation of internally installed performance louvres in plant rooms.
As published by the council, reference 22/00942/FULL
Application record
- Reference
- 22/00942/FULL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 5 Oct 2022
- Validated
- 5 Oct 2022
- Decided
- 27 Jan 2023
- Ward
- Cripplegate
- Decision by
- Delegated Decision
- Postcode
- EC2Y 8DS
Site history
Applications at this address on the City of London register
This site has had 3 applications since 2022: 2 approved, 0 refused.
-
23/00351/MDC Awaiting decision
Conference Centre Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Submission of details pursuant to conditions (2) external materials and (3) detailed design of planning permission 22/00942/FULL and listed building consent 22/00943/LBC and details of conditions (4a) plant noise and (5) mounting of plant of planning permission 22/00942/FULL.
-
22/00943/LBC Granted
Conference Centre Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Listed Building Consent for internal and external works at Levels 4 and 5 of Frobisher Crescent comprising of: (i) the removal and modification of existing services and wall mounted storage heaters and electric heaters; (ii) the installation of LTHW pipework; (iii) the installation of extract ductwork in new bulkheads; (iv) the installation of ASHPs and associated works in plant rooms; (v) the installation of wall mounted radiators; (vi) the installation of paint finished metal louvre grill to plant rooms; (vii) the installation of hardwood timber louvre insets into existing sliding window and openings of plant rooms; and (viii) the installation of internally installed performance louvres in plant rooms.
Timeline
Dates from the published record
-
5 Oct 2022
Received by City of London
-
27 Jan 2023
Decision issued: Approved
-
10 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
2 later applications on the register refer to this one:
-
23/00672/FULL Awaiting decision
Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
An application under Section 73 of the Town and Country Planning Act 1990 (as amended) to amend Condition 6 (Approved Documents) of planning permission 22/00942/FULL dated 27 January 2023 to allow for the removal of the approved bulkheads and the insertion of timber louvres.
-
23/00351/MDC Awaiting decision
Conference Centre Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Submission of details pursuant to conditions (2) external materials and (3) detailed design of planning permission 22/00942/FULL and listed building consent 22/00943/LBC and details of conditions (4a) plant noise and (5) mounting of plant of planning permission 22/00942/FULL.
Who's behind it
Company information only, from the register and Companies House
Dannatt, Johnson Architects Agent, an architecture practice registered in London
Active · incorporated 2009 · London
38 applications on PlanIndex · across 8 councils · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
39 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
City of London granted permission on 27 January 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Conference Centre Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Listed Building Consent for internal and external works at Levels 4 and 5 of Frobisher Crescent comprising of: (i) the removal and modification of existing services and wall mounted storage heaters and electric heaters; (ii) the installation of LTHW pipework; (iii) the installation of extract ductwork in new bulkheads; (iv) the installation of ASHPs and associated works in plant rooms; (v) the installation of wall mounted radiators; (vi) the installation of paint finished metal louvre grill to plant rooms; (vii) the installation of hardwood timber louvre insets into existing sliding window and openings of plant rooms; and (viii) the installation of internally installed performance louvres in plant rooms.
Granted Heritage and listed buildings Windows or glazing 37 docs -
Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Removal of foot pumps and installation of hand sensors to operate taps in the Level -1.5 toilets.
Granted Heritage and listed buildings 11 docs -
Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Formation of Community Room within Library, with new steel screens and doors and alterations to existing screens.
Granted Heritage and listed buildings 21 docs -
Art Gallery Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Reconfiguration and upgrade of the concert hall backstage areas to include the amalgamation of smaller dressing rooms, changing spaces and support spaces; the reconfiguration of the artist lounge and bar ; rationalisation of showers to provide a wheelchair accessible dressing room with an en-suite WC and shower; fire safety upgrades, update layout of a rehearsal spaces, and provision of fire rated storage space and other associated works throughout.
Granted Heritage and listed buildings 51 docs -
Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
100% historically approved · decision due ~1 Dec
Strengthening works to existing corbels at the Barbican Centre, and associated works.
Awaiting decision Heritage and listed buildings -
Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
99% historically approved · decision due ~1 Dec
Application for planning permission to allow the use of 37 car parking bays of Car Park 2 at Level -1 at the Barbican Centre for new sprinkler tanks and plant and associated external ventilation and ductwork to the GSMD lightwell, and other associated works.
Awaiting decision Full applications 22 docs
Other full applications
In City of London
-
25/01794/FULL Granted
50 Cannon Street London EC4N 6JJ
Refurbishment of existing office building with works including: creation of roof terraces, extension of existing lift shaft, replacement and relocation of existing rooftop plant and associated structures, changes to internal car and cycle parking arrangements, and improvements to the building's facade.
-
26/00865/FULL Granted
9 Newbury Street London EC1A 7HU
Extensions and alterations to the rear and interior of the existing office building (Use Class E) to provide (i) upgraded office space at lower ground and ground floors; (ii) conversion from office to one studio flat and one 1-bed dwelling (Use Class C3) at 1st to 3rd floors; and (iii) provision of a 1-bed dwelling within a newly created two storey roof extension at 4th and 5th floors with a roof terrace at 4th floor.
-
26/01110/FULL Granted
200 Aldersgate Street London EC1A 4HD
Retrospective application for the installation of 2no. condenser units to fifth floor roof.
-
26/01109/FULL Granted
100 Bishopsgate London EC2N 4AA
Installation of artwork along the junction of the landscaped space and the walls of St Ethelburga's Centre of Reconciliation and Peace: Continuum by Halima Cassell.
-
26/01053/FULL Granted
49 Cheapside London EC2V 6AT
Shopfront alteration at Unit 1A to replace existing solid blanking panel with clear glass