Planning application
Conference Centre Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Internal and External works at Levels 4 and 5 of Frobisher Crescent comprising of: (i) the removal and modification of existing services and wall mounted storage heaters and electric heaters; (ii) the installation of LTHW pipework; (iii) the installation of extract ductwork in new bulkheads; (iv) the installation of ASHPs and associated works in plant rooms; (v) the installation of wall mounted radiators; (vi) the installation of paint finished metal louvre grill to plant rooms; (vii) the installation of hardwood timber louvre insets into existing sliding window and openings of plant rooms; and (viii) the installation of internally installed performance louvres in plant rooms.
As published by the council, reference 22/00942/FULL
Application record
- Reference
- 22/00942/FULL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Approved
- Received
- 5 Oct 2022
- Validated
- 5 Oct 2022
- Decided
- 27 Jan 2023
- Ward
- Cripplegate
- Decision by
- Delegated Decision
- Postcode
- EC2Y 8DS
Site history
Applications at this address on the City of London register
This site has had 3 applications since 2022: 2 approved, 0 refused.
-
23/00351/MDC Awaiting decision
Conference Centre Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Submission of details pursuant to conditions (2) external materials and (3) detailed design of planning permission 22/00942/FULL and listed building consent 22/00943/LBC and details of conditions (4a) plant noise and (5) mounting of plant of planning permission 22/00942/FULL.
-
22/00943/LBC Granted
Conference Centre Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Listed Building Consent for internal and external works at Levels 4 and 5 of Frobisher Crescent comprising of: (i) the removal and modification of existing services and wall mounted storage heaters and electric heaters; (ii) the installation of LTHW pipework; (iii) the installation of extract ductwork in new bulkheads; (iv) the installation of ASHPs and associated works in plant rooms; (v) the installation of wall mounted radiators; (vi) the installation of paint finished metal louvre grill to plant rooms; (vii) the installation of hardwood timber louvre insets into existing sliding window and openings of plant rooms; and (viii) the installation of internally installed performance louvres in plant rooms.
Timeline
Dates from the published record
-
5 Oct 2022
Received by City of London
-
27 Jan 2023
Decision issued: Approved
-
10 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
23/00351/MDC Awaiting decision
Conference Centre Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Submission of details pursuant to conditions (2) external materials and (3) detailed design of planning permission 22/00942/FULL and listed building consent 22/00943/LBC and details of conditions (4a) plant noise and (5) mounting of plant of planning permission 22/00942/FULL.
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in London
16 applications on PlanIndex · across 6 councils · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
39 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
City of London granted permission on 27 January 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Conference Centre Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Listed Building Consent for internal and external works at Levels 4 and 5 of Frobisher Crescent comprising of: (i) the removal and modification of existing services and wall mounted storage heaters and electric heaters; (ii) the installation of LTHW pipework; (iii) the installation of extract ductwork in new bulkheads; (iv) the installation of ASHPs and associated works in plant rooms; (v) the installation of wall mounted radiators; (vi) the installation of paint finished metal louvre grill to plant rooms; (vii) the installation of hardwood timber louvre insets into existing sliding window and openings of plant rooms; and (viii) the installation of internally installed performance louvres in plant rooms.
Granted Heritage and listed buildings Windows or glazing 37 docs -
Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
100% historically approved · decision due ~2 Oct
Upgrade of existing and installation of additional evacuation signage and downlights within the Concert Hall, and associated works.
Awaiting decision Heritage and listed buildings 40 docs -
Art Gallery Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Reconfiguration and upgrade of the concert hall backstage areas to include the amalgamation of smaller dressing rooms, changing spaces and support spaces; the reconfiguration of the artist lounge and bar ; rationalisation of showers to provide a wheelchair accessible dressing room with an en-suite WC and shower; fire safety upgrades, update layout of a rehearsal spaces, and provision of fire rated storage space and other associated works throughout.
Granted Heritage and listed buildings 51 docs -
Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Application under Section 19 of the Planning (Listed Buildings and Conservation Areas) Act 1990 to vary Condition 3 of Listed Building Consent 22/00895/LBC dated 2nd December 2022 to refer to a revised list of drawings amended to reflect design alterations and to discharge Condition 4 relating to detailed design elements of the proposal.
Granted Heritage and listed buildings 46 docs -
Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Replacement of existing house lighting fixtures within the Theatre with new LED fixtures. Introduction of new fittings to supplement existing lighting in the front rows of the circle, upper circle and gallery.
Granted Heritage and listed buildings 11 docs -
Art Gallery Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
The enlargement of the existing service access panel within the male cubical at level 00, 01 and 02 of the catering block WCs. Temporary installation of an access panel for a maximum of five years following which a permeant terrazzo panel will be installed.
Granted Heritage and listed buildings 12 docs
Other full applications
In City of London
-
26/00041/FULL Granted
The Aldgate School St James's Passage London EC3A 5DE
Refurbishment of existing commercial kitchen and new extract ventilation ductwork
-
26/00659/FULL Granted
30 Gresham Street London EC2V 7PG
Creation of a new entrance on Gresham Street and enhancement of existing main entrance.
-
26/00539/FULL Granted
Basement Pair North 6 King's Bench Walk London EC4Y 7DR
External installation of a new free-standing condenser and associated services within rear lightwell.
-
26/01207/FULL Awaiting decision
25 Gresham Street London EC2V 7HN
Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.
-
26/01202/FULL Awaiting decision
2 Moorgate London EC2R 6AG
Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.