Skip to content
PlanIndex Get alerts
Menu

Planning application

Livery Hall Wax Chandlers Hall Gresham Street London EC2V 7AD

Granted City of London 21/00797/FULL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of plant equipment and associated louvres at roof level.

As published by the council, reference 21/00797/FULL

Application record

Reference
21/00797/FULL
Type
Full Planning Permission
Status
Decided
Decision
Approved
Received
21 Sep 2021
Validated
7 Oct 2021
Decided
13 Jan 2023
Ward
Cheap
Decision by
Delegated Decision
Postcode
EC2V 7AD

Timeline

Dates from the published record

  1. 21 Sep 2021

    Received by City of London

  2. 7 Oct 2021

    Validated

    Checked as complete and ready for consideration.

  3. 13 Jan 2023

    Decision issued: Approved

  4. 10 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in London

89 applications on PlanIndex · across 15 councils · 94% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Goldsmiths Hall Foster Lane London EC2V 6BN

    25/01365/MDC Submitted 6 Oct 2025 25m away

    100% historically approved · decision due ~1 Dec

    Submission of a scheme for protecting nearby residents and commercial occupiers from noise, dust and other environmental effects pursuant to condition 2 of planning permission 25/00212/FULL dated 13/06/2025.

    Awaiting decision Conditions 2 docs
  • Goldsmiths Hall Foster Lane London EC2V 6BN

    25/00351/TCA Submitted 13 Mar 2025 32m away

    99% historically approved · decision due ~8 May

    Pruning works to 2x London Plane Trees, 2x Magnolia trees and replacement of 4no. mixed shrubbery.

    Awaiting decision Trees 2 docs
  • Goldsmiths Hall Foster Lane London EC2V 6BN

    25/00213/LBC Submitted 10 Feb 2025 32m away

    (i) Alterations to existing entrance on Gresham Street elevation to provide disabled access: (ii) installation of new M&E services and associated plant at ground and roof levels; (iii) installation of new partitions at basement level; and (iv) associated works.

    Withdrawn Heritage and listed buildings 22 docs
  • Goldsmiths Hall Foster Lane London EC2V 6BN

    25/00212/FULL Submitted 10 Feb 2025 32m away

    99% historically approved · decision due ~5 May

    (i) Alterations to existing entrance on Gresham Street elevation to provide disabled access: (ii) installation of new M&E services and associated plant at ground and roof levels; and (iii) associated works.

    Awaiting decision Full applications 21 docs
  • Garrard House 31 Gresham Street London EC2V 7QA

    21/00525/PODC Submitted 15 Jun 2021 44m away

    Submission of the carbon dioxide emissions assessment of the completed development and calculation of the Carbon Offsetting contribution pursuant to Schedule 3 Paragraph 10 of the Section 106 Agreement dated 01 February 2018 as amended by the Deed of Variation dated 11 December 2018 (Planning Application Reference 17/00585/FULMAJ as amended by 18/00669/FULL).

    Granted 4 docs
  • Garrard House 31 Gresham Street London EC2V 7QA

    21/00484/MDC Submitted 8 Jun 2021 44m away

    Submission of a post construction BREEAM assessment pursuant to condition 7 of planning permission 18/00669/FULL dated 11 December 2018

    Granted Conditions 7 docs

In City of London

  • 26/00041/FULL Granted

    The Aldgate School St James's Passage London EC3A 5DE

    Refurbishment of existing commercial kitchen and new extract ventilation ductwork

    13 Jan 2026 Full applications
  • 26/00659/FULL Granted

    30 Gresham Street London EC2V 7PG

    Creation of a new entrance on Gresham Street and enhancement of existing main entrance.

    6 May 2026 Full applications
  • 26/00539/FULL Granted

    Basement Pair North 6 King's Bench Walk London EC4Y 7DR

    External installation of a new free-standing condenser and associated services within rear lightwell.

    16 Apr 2026 Full applications
  • 26/01207/FULL Awaiting decision

    25 Gresham Street London EC2V 7HN

    Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.

    25 Aug 2026 Full applications
  • 26/01202/FULL Awaiting decision

    2 Moorgate London EC2R 6AG

    Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.

    21 Aug 2026 Full applications