Skip to content
PlanIndex Get alerts
Menu

Planning application

Livery Hall Wax Chandlers Hall Gresham Street London EC2V 7AD

Granted City of London 21/00797/FULL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of plant equipment and associated louvres at roof level.

As published by the council, reference 21/00797/FULL

Application record

Reference
21/00797/FULL
Type
Full Planning Permission
Status
Decided
Decision
Granted As published: Approved
Received
21 Sep 2021
Validated
7 Oct 2021
Decided
13 Jan 2023
Ward
Cheap
Decision by
Delegated Decision
Postcode
EC2V 7AD

Timeline

Dates from the published record

  1. 21 Sep 2021

    Received by City of London

  2. 7 Oct 2021

    Validated

    Checked as complete and ready for consideration.

  3. 13 Jan 2023

    Decision issued: Approved

  4. 10 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Daniel Watney LLP Agent, registered in London

Active · incorporated 2010 · London

134 applications on PlanIndex · across 17 councils · 97% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

City of London granted permission on 13 January 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Goldsmiths Hall Foster Lane London EC2V 6BN

    25/01365/MDC Submitted 6 Oct 2025 50 yards away

    Submission of a scheme for protecting nearby residents and commercial occupiers from noise, dust and other environmental effects pursuant to condition 2 of planning permission 25/00212/FULL dated 13/06/2025.

    Granted Conditions 8 docs
  • Goldsmiths Hall Foster Lane London EC2V 6BN

    25/00351/TCA Submitted 13 Mar 2025 50 yards away

    Pruning works to 2x London Plane Trees, 2x Magnolia trees and replacement of 4no. mixed shrubbery.

    Decided Trees 6 docs
  • Goldsmiths Hall Foster Lane London EC2V 6BN

    25/00213/LBC Submitted 10 Feb 2025 50 yards away

    (i) Alterations to existing entrance on Gresham Street elevation to provide disabled access: (ii) installation of new M&E services and associated plant at ground and roof levels; (iii) installation of new partitions at basement level; and (iv) associated works.

    Withdrawn Heritage and listed buildings 22 docs
  • Goldsmiths Hall Foster Lane London EC2V 6BN

    25/00212/FULL Submitted 10 Feb 2025 50 yards away

    (i) Alterations to existing entrance on Gresham Street elevation to provide disabled access: (ii) installation of new M&E services and associated plant at ground and roof levels; and (iii) associated works.

    Granted Full applications 27 docs
  • 10 Gresham Street London EC2V 7JD

    23/01188/MDC Submitted 1 Nov 2023 50 yards away

    Submission of details of (a) particulars and samples of the materials to be used on all external faces of the building at ground floor level and external ground surfaces; (b) details of planters to the front entrance; and (c) details of hard and soft landscaping pursuant to condition 4 of planning permission 22/01244/FULL dated 29/09/2023.

    Granted Conditions 16 docs
  • Garrard House 31 Gresham Street London EC2V 7QA

    21/00525/PODC Submitted 15 Jun 2021 50 yards away

    Submission of the carbon dioxide emissions assessment of the completed development and calculation of the Carbon Offsetting contribution pursuant to Schedule 3 Paragraph 10 of the Section 106 Agreement dated 01 February 2018 as amended by the Deed of Variation dated 11 December 2018 (Planning Application Reference 17/00585/FULMAJ as amended by 18/00669/FULL).

    Granted 4 docs

In City of London

  • 26/01053/FULL Granted

    49 Cheapside London EC2V 6AT

    Shopfront alteration at Unit 1A to replace existing solid blanking panel with clear glass

    Received 27 Jul, published by the council 20 Sep 2026 Full applications
  • 26/00725/FULL Granted

    66 Shoe Lane London EC4A 3BQ

    (i) Replacement of existing kitchen extract equipment; (ii) installation of three condenser unit and associated works; at roof level inside the existing plant enclosure

    Received 19 May, published by the council 24 Jul 2026 Full applications
  • 26/01154/FULL Granted

    33 Holborn London EC1N 2HT

    Application under Section 73 of the Town & Country Planning Act 1990 (as amended) to vary Condition 3 (noise from new plant) and Condition 16 (Approved Drawings) of Planning Permission 24/00391/FULL dated 10.12.2024 in order to allow the reconfiguration of the approved roof plan, including reduced size and location of the pavilion and roof terrace along with the introduction of lift extension to roof level, increased size and rearrangement of rooftop plant room and other associated changes.

    Received 11 Aug, published by the council 13 Aug 2026 Full applications
  • 26/00488/FULL Granted

    391 Cromwell Tower Barbican London EC2Y 8NB

    Replacement of timber service door with an aluminium framed glazed door at penthouse levels 39 - 40.

    Received 2 Apr, published by the council 24 Jul 2026 Full applications
  • 26/00388/FULL Granted

    37 Fleet Street London EC4Y 1BT

    Minor works including: refurbishment and replacement of existing ground floor external doors to Falcon Court; installation and rationalisation of mechanical and extract infrastructure at roof level including removal of selected roof lights, enlargement of existing brick work, and creating a new maintenance shaft; removal of modern roof-level accretions and replacement with new standing seam copper roofing; screening of plant infrastructure behind demountable panels; introduction of new louvres and brick slip cladding within courtyard elevations to accommodate servicing requirements; and other associated works including temporary enabling works.

    Received 16 Mar, published by the council 24 Jul 2026 Full applications