Planning application
100 Bishopsgate London EC2N 4JL
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Submission of noise report associated with new plant pursuant to condition 15 (in part) of planning permision dated 30th March 2012 (12/00129/FULL).
As published by the council, reference 21/00473/MDC
Application record
- Reference
- 21/00473/MDC
- Type
- Submission of details (Planning)
- Status
- Decided
- Decision
- Approved
- Received
- 7 Jun 2021
- Validated
- 7 Jun 2021
- Decided
- 6 Jul 2021
- Ward
- Bishopsgate
- Decision by
- Delegated Decision
- Postcode
- EC2N 4JL
Timeline
Dates from the published record
-
7 Jun 2021
Received by City of London
-
6 Jul 2021
Decision issued: Approved
-
10 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file
1,203 applications on PlanIndex · across 153 councils · 94% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
99 Bishopsgate London EC2M 3XD
Temporary installation of two artworks for a period of up to 24 months, to be taken down on or before 29 May 2023: Silent Agitator by Ruth Ewan and Keeping Time by Isabella Martin.
Granted Full applications 13 docs -
Central Public Realm Area 100 Bishopsgate London EC2N 4JL
Temporary installation of a sculpture for a period of up to 24 months, as part of the 10th edition of Sculpture in the City, to be taken down on or before 29 May 2023: Rough Neck Business by Mike Ballard.
Granted Full applications 10 docs -
61 St Mary Axe, 80-86 Bishopsgate, 88-90 Bishopsgate, 12-20 Camomile Street, 15-16 St Helen's Place And 33-35 St Mary Axe (North Elevation Only), London EC3
100% historically approved · decision due ~5 Sep
Submission of details of an Interim Travel Plan pursuant to condition 20 of planning permission 12/00129/FULL dated 30.03.2012.
Awaiting decision Conditions 3 docs -
100 Bishopsgate London EC2N 4AA
99% historically approved · decision due ~28 Sep
Installation of artwork along the junction of the landscaped space and the walls of St Ethelburga's Centre of Reconciliation and Peace.
Awaiting decision Full applications 6 docs -
St Ethelburga's Centre For Reconciliation And Peace 78 Bishopsgate London EC2N 4AG
100% historically approved · decision due ~28 Sep
Installation of secondary glazing.
Awaiting decision Heritage and listed buildings Windows or glazing 19 docs -
100 Bishopsgate London EC2N 4AA
Submission of an Annual Monitoring Report pursuant to condition 20 of planning permission 12/00129/FULL dated 30/03/2012.
Granted Conditions 6 docs
Other conditions applications
In City of London
-
26/00710/MDC Granted
1 Exchange Square London EC2A 2JN
Submission of ventilation details and fume extract arrangements pursuant to discharge of condition 17 of planning permission 21/00930/FULMAJ dated 14.06.2023.
-
25/01327/MDC Granted
1 New Change London EC4M 9AF
Submission of an Inclusive Access Management Plan prior to the first occupation of the development for (a) the library use (F1 use); pursuant to condition 9a of planning permission 24/00481/FULL dated 06/12/2024.
-
26/00933/MDC Granted
122 Minories And 14 Crosswall London EC3N 1NT
Submission of Circlular Economy Post Completion Report and Circular Economy Statements pursuant to discharge of Condition 23 of planning permission 22/00035/FULMAJ dated 09.08.2022.
-
26/00667/MDC Granted
9A - 9B Crutched Friars London EC3N 2AU
Submission of details of Construction Management Plan pursuant to condition 4 of Planning Permission 23/00895/FULL dated 10.05.2024.
-
25/01673/MDC Granted
54 King William Street London EC4R 9AD
Submission of details of plant noise and installation pursuant to condition 2 (part B) of planning permission 24/00504/FULL dated 03/04/2025.