Skip to content
PlanIndex Get alerts
Menu

Planning application

Central Public Realm Area 100 Bishopsgate London EC2N 4JL

Granted City of London 21/00247/FULLR3 Full - Corporation's Own Application R3

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Temporary installation of a sculpture for a period of up to 24 months, as part of the 10th edition of Sculpture in the City, to be taken down on or before 29 May 2023: Rough Neck Business by Mike Ballard.

As published by the council, reference 21/00247/FULLR3

Application record

Reference
21/00247/FULLR3
Type
Full - Corporation's Own Application R3
Status
Decided
Decision
Approved
Received
31 Mar 2021
Validated
31 Mar 2021
Decided
25 May 2021
Ward
Bishopsgate
Decision by
Delegated Decision
Postcode
EC2N 4JL

Timeline

Dates from the published record

  1. 31 Mar 2021

    Received by City of London

  2. 25 May 2021

    Decision issued: Approved

  3. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In City of London

  • 26/00041/FULL Granted

    The Aldgate School St James's Passage London EC3A 5DE

    Refurbishment of existing commercial kitchen and new extract ventilation ductwork

    13 Jan 2026 Full applications
  • 26/00659/FULL Granted

    30 Gresham Street London EC2V 7PG

    Creation of a new entrance on Gresham Street and enhancement of existing main entrance.

    6 May 2026 Full applications
  • 26/00539/FULL Granted

    Basement Pair North 6 King's Bench Walk London EC4Y 7DR

    External installation of a new free-standing condenser and associated services within rear lightwell.

    16 Apr 2026 Full applications
  • 26/01207/FULL Awaiting decision

    25 Gresham Street London EC2V 7HN

    Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.

    25 Aug 2026 Full applications
  • 26/01202/FULL Awaiting decision

    2 Moorgate London EC2R 6AG

    Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.

    21 Aug 2026 Full applications