Planning application
Robin Brook Centre St Bartholomews Hospital West Smithfield London EC1A 7BE
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Details of the restoration of the historic wall panelling and repairs to original fabric, particulars and samples of the proposed secondary glazing and details of the proposed demountable timber partition pursuant to conditions 3 (a), (b) and (c) of listed building consent 19/01168/LBC dated 14.07.2020
As published by the council, reference 21/00208/LDC
Application record
- Reference
- 21/00208/LDC
- Type
- Submission of details (LBC/CAC)
- Status
- Decided
- Decision
- Approved
- Received
- 19 Mar 2021
- Validated
- 19 Mar 2021
- Decided
- 20 May 2021
- Ward
- Farringdon Without
- Decision by
- Delegated Decision
- Postcode
- EC1A 7BE
Site history
Applications at this address on the City of London register
This site has had 2 applications since 2021: 2 approved, 0 refused.
-
21/00208/MDC Granted
Robin Brook Centre St Bartholomews Hospital West Smithfield London EC1A 7BE
Details of the restoration of the historic wall panelling and repairs to original fabric, particulars and samples of the proposed secondary glazing and details of the proposed demountable timber partition pursuant to conditions 3 (a), (b) and (c) of listed building consent 19/01168/LBC dated 14.07.2020
Timeline
Dates from the published record
-
19 Mar 2021
Received by City of London
-
20 May 2021
Decision issued: Approved
-
10 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in London
29 applications on PlanIndex · across 8 councils · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
20 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
City of London granted permission on 20 May 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About lawful development applications
A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
St Bartholomews Hospital West Smithfield London EC1A 7BE
Installation of 4no. chillers, on big foot system supports, on the roof.
Granted Full applications 11 docs -
Old Pathology Building & Residential Staff Quarters Building St Bartholomew's Hospital West Smithfield London EC1A 7BE
Details of soffits, balustrades and handrails pursuant to Condition 2 (f) of planning permission 16/01311/FULL dated 31.05.2016
Granted Conditions 10 docs -
Old Pathology Building & Residential Staff Quarters Building St Bartholomew's Hospital West Smithfield London EC1A 7BE
Details of fume extract arrangements pursuant to Condition 19 of planning permission 16/01311/FULL dated 31.05.2016
Granted Conditions 8 docs -
Old Pathology Building & Residential Staff Quarters Building St Bartholomew's Hospital West Smithfield London EC1A 7BE
Details of the plant, flues, fire escapes and other excrescences at roof level pursuant to Condition 2(h) of planning permission 16/01311/FULL dated 31.05.2016
Granted Conditions 28 docs -
King George V Block St Bartholomew's Hospital West Smithfield London EC1A 7BE
Upgrade to the existing telecommunications equipment comprising: (i) replacement of three antennas with six antennas; (ii) replacement of one 300mm dish; (iii) replacement of one cabinet with two cabinets; (iv) replacement of three Remote Amplifiers (RHA) with nine Remote Radio Units (RRU); and (vi) ancillary development thereto.
Withdrawn Full applications 21 docs -
Old Pathology Building & Residential Staff Quarters Building St Bartholomew's Hospital West Smithfield London EC1A 7BE
Details of the treatment of the new roof including dormers and plant enclosures pursuant to Condition 2i) of planning permission 16/01311/FULL dated 11.06.2018.
Granted Conditions Loft or dormer Roofing 16 docs
Other lawful development applications
In City of London
-
26/01240/LDC Awaiting decision
North Wing St Bartholomews Hospital West Smithfield London EC1A 7BE
Submission of details of masonry and joinery repairs pursuant to condition 3 of Listed Building Consent 25/00756/LBC (dated 19.08.2025).
-
26/00673/LDC Granted
1-5 London Wall Buildings London Wall London EC2M 5PG
Submission of details of the repair and restoration of the external basement areas on Finsbury Circus and Circus Place pursuant to condition 4(r) of Listed Building Consent 25/00628/LBC dated 23.07.2025.
-
26/00674/LDC Granted
1-5 London Wall Buildings London Wall London EC2M 5PG
Submission of details of the reinstated war memorial plaque pursuant to condition 4(q) of Listed Building Consent 25/00628/LBC dated 23.07.2025.
-
26/01206/LDC Awaiting decision
13 Bishopsgate London EC2N 3BA
Submission of masonry report and drawings pursuant to discharge of condition 3(b), 5 & 6 of planning permission 24/00812/LBC dated 04.12.2024.
-
26/01205/LDC Awaiting decision
Finsbury House 23 Finsbury Circus London EC2M 7EA
Submission of Lighting Strategy and Technical Lighting Reports, Lighting and Luminaire Schedules, technical datasheets and lighting drawings pursuant to condition 3 (Part g) of Listed Building Consent 26/00126/LBC dated 08.06.2026.