Planning application

21 Moorfields London EC2Y 9AE

Awaiting decision City of London 17/01095/FULEIA/DOV Deed of Variation

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Deed of Variation to the Section 106 Agreement dated 4 May 2018 to (i) align and incorporate obligations for the maintenance of the City Walkways, ramps, railings and hostile vehicle mitigation; and (ii) to accommodate the various minor changes to the scheme approved since the granting of planning permission and completion of the 2018 Section 106 agreement.

As published by the council, reference 17/01095/FULEIA/DOV

Application record

Reference
17/01095/FULEIA/DOV
Type
Deed of Variation
Status
Under Consideration
Received
22 Sep 2022
Validated
22 Sep 2022
Ward
Coleman Street
Decision by
Delegated
Postcode
EC2Y 9AE

Site history

Applications at this address on the City of London register

This site has had 7 applications since 2020: 6 approved, 0 refused.

  • 22/00786/MDC Granted

    21 Moorfields London EC2Y 9AE

    Details of a Construction Logistics Plan pursuant to condition 13 of planning permission dated 04/05/2018 (app. no. 17/01095/FULEIA).

    Decided 22 Mar 2024 Conditions
  • 22/00751/MDC Granted

    21 Moorfields London EC2Y 9AE

    Submission of details of a Lifetime Maintenance Plan for the SuDS system in conjunction with the Lead Local Flood Authority pursuant to condition 12 of planning permission dated 04/05/2018 (app. no. 17/01095/FULEIA).

    Decided 28 Oct 2022 Conditions
  • 21/00318/MDC Granted

    21 Moorfields London EC2Y 9AE

    Submission of details of the position and size of the green roof(s), the type of planting and the contribution of the green roof(s) to biodiversity and rainwater attenuation pursuant to condition 27 of planning permission dated 04/05/2018 (app. no. 17/01095/FULEIA).

    Decided 28 Sep 2021 Conditions
  • 21/00324/NMA Granted

    21 Moorfields London EC2Y 9AE

    Non-material amendment under Section 96A of the Town and Country Planning Act 1990 (as amended) to planning permission dated 04/05/2018 (app. no. 17/01095/FULEIA) to amend the wording of Condition 59 to allow for a reduction in the number of cycle parking spaces.

    Decided 27 May 2021 Amendments
  • 20/00978/MDC Granted

    21 Moorfields London EC2Y 9AE

    Submission of details and samples of materials pursuant to condition 19 (a) and (b) (in part) of planning permission dated 04/05/2018 (app. no. 17/01095/FULEIA).

    Decided 25 May 2021 Conditions
  • 20/00977/MDC Granted

    21 Moorfields London EC2Y 9AE

    Submission of details of a Construction Environmental Management Plan pursuant to condition 9 (in part) of planning application dated 04/05/2018 (app. no. 17/01095/FULEIA). REVISED CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN SUBMITTED

    Decided 28 Sep 2021 Conditions

Timeline

Dates from the published record

  1. 22 Sep 2022

    Received by City of London

  2. 10 Oct 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 17 November 2022, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of London took a median of 84 days over the applications it decided in the last year.

What happens while it is decided

This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London decided condition discharge and variation applications in a median of 83 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Tenter House 45 Moorfields London EC2Y 9AE

    23/01103/MDC Submitted 6 Oct 2023 50 yards away

    Submission of a Deconstruction Logistics Plan pursuant to condition 10(b) of planning permission 17/01050/FULMAJ (dated 29/09/2020).

    Granted Conditions 9 docs
  • Tenter House 45 Moorfields London EC2Y 9AE

    24/00310/MDC Submitted 25 Mar 2024 50 yards away

    Submission of detailed design and method statements (in consultation with London Underground) for demolition, all of the foundations, basement and ground floor structures, or for any other structures below ground level, including piling (temporary and permanent) pursuant to condition 12(B) of planning permission 17/01050/FULMAJ dated 29/09/2020.

    Granted Conditions Demolition 21 docs
  • Tenter House 45 Moorfields London EC2Y 9AE

    26/01299/MDC Submitted 18 Sep 2026 50 yards away

    Submission of details of Part A of Stage 2 WSI for an Archaeological Evaluation and Archaeological Evaluation Report pursuant to part of condition 19 of Planning Permission 24/00209/FULMAJ dated 14.10.2025 (as amended 25/01531/NMA).

    Granted
  • Tenter House 45 Moorfields London EC2Y 9AE

    26/00810/MDC Submitted 3 Jun 2026 50 yards away

    Submission of details of Scheme for the Provision of Sewer Vents, Public Health Services Roof Drainage Layout, Public Health Services Roof Drainage Layout, Public Health Services Sanitary Drainage and New Sewer Connection Details and Section Southern Outfall pursuant to condition 8 of Planning permission 24/00209/FULMAJ dated 14.10.2025 (as amended 25/01531/NMA).

    Granted 8 docs
  • Tenter House 45 Moorfields London EC2Y 9AE

    26/00808/MDC Submitted 3 Jun 2026 50 yards away

    Submission of details of a Piling Method Statement pursuant to conditions 73 and 75 of Planning permission 24/00209/FULMAJ dated 14.10.2025 (as amended 25/01531/NMA).

    Granted 7 docs
  • Tenter House 45 Moorfields London EC2Y 9AE

    26/00702/MDC Submitted 14 May 2026 50 yards away

    Submission of details of Preliminary Risk Assessment Report, Geotechnical and Geo-environmental interpretative Report, Phase 1 Desk Study, Detailed UXO Risk Assessment, etc. pursuant to condition 5 (2) (B) of Planning Permission 24/00209/FULMAJ dated 14.10.2025.

    Granted 55 docs

In City of London

  • 26/01219/MDC Granted

    Tower 42 International Financial Centre 25 Old Broad Street London EC2N 1HQ

    Submission of details of the materials to be used on external faces pursuant to discharge of Condition 2(a) of planning permission 24/01203/FULL dated 02.06.2025.

    Received 27 Aug, published by the council 28 Aug 2026 Conditions
  • 26/01308/MDC Awaiting decision

    1 Poultry London EC2R 8EJ

    Submission of Protection of Historic Fabric report and Heritage Fabric Protection Register pursuant to condition 5 of planning permission 25/01714/LBC dated 07.08.2026.

    Received 18 Sep, published by the council 10 Oct 2026 Conditions
  • 26/01244/MDC Awaiting decision

    60 Queen Victoria Street London EC4N 4TZ

    Submission of landscaping details and a Landscape and Ecology Management Plan pursuant to discharge of Condition 5, 17(d), 18(d) and 33 planning permission 23/01422/FULMAJ dated 11.04.2025.

    7 Sep 2026 Conditions
  • 26/01248/MDC Awaiting decision

    20 Giltspur Street London EC1A 9DD

    Submission of Security Management Plan pursuant to Condition 34 of planning permission 22/00867/FULMAJ dated 14.09.2023.

    7 Sep 2026 Conditions
  • 26/01249/MDC Awaiting decision

    6 - 11 Crescent London EC3N 2LY

    Submission of details Access Management Plan pursuant to condition 16 of Planning Permission 24/00776/FULL dated 11.07.2025.

    Received 7 Sep, published by the council 9 Sep 2026 Conditions