Skip to content
PlanIndex Get alerts
Menu

Planning application

5B Fettes Row Edinburgh EH3 6SF

Awaiting decision City of Edinburgh 26/03486/FULSTL Planning Permission STL

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Retrospective change of use from and alterations to former Joiner's store (Class 6) to serviced apartment (sui generis).

As published by the council, reference 26/03486/FULSTL

Application record

Reference
26/03486/FULSTL
Type
Planning Permission STL
Status
Awaiting Assessment
Received
27 Aug 2026
Validated
28 Aug 2026
Ward
City Centre
Parish
New Town + Broughton
Decision by
Local Delegated Decision
Postcode
EH3 6SF

Comment by 25 September 2026

The council is taking comments on this application until then. Have your say on City of Edinburgh's portal.

Timeline

Dates from the published record

  1. 27 Aug 2026

    Received by City of Edinburgh

  2. 28 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 4 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 23 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of Edinburgh took a median of 38 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with City of Edinburgh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 5B Fettes Row Edinburgh EH3 6SF

    26/01353/LBC Submitted 31 Mar 2026 2m away

    Internal and external alterations to form a serviced apartment.

    Withdrawn Heritage and listed buildings 30 docs
  • 5B Fettes Row Edinburgh EH3 6SF

    26/01351/FULSTL Submitted 31 Mar 2026 2m away

    Retrospective change of use from and alterations to former Joiner's store (Class 6) to serviced apartment (sui generis).

    Withdrawn Full applications 37 docs
  • 5B Fettes Row Edinburgh EH3 6SF

    26/03484/LBC Submitted 27 Aug 2026 3m away

    89% historically approved · decision due ~22 Oct

    Retrospective internal and external alterations to form a serviced apartment.

    Awaiting decision Heritage and listed buildings 4 docs
  • 2F 2 Fettes Row Stockbridge Edinburgh EH3 6SF

    25/05334/LBC Submitted 7 Oct 2025 8m away

    89% historically approved · decision due ~2 Dec

    Internal alterations to flat, including relocation of kitchen to front room and provision of ventilation extract to terminate on rear elevation.

    Awaiting decision Heritage and listed buildings 7 docs
  • 2F 2 Fettes Row Stockbridge Edinburgh EH3 6SF

    25/05339/CLP Submitted 8 Oct 2025 24m away

    Installation of ventilation extract terminus on rear elevation of property.

    Granted Lawful development 8 docs
  • 12A Cumberland Street North East Lane Edinburgh

    20/03874/VAR2 Submitted 25 May 2026 28m away

    86% historically approved · decision due ~22 Jul

    Front door and window above relocated. Skew copes along verges omited. Lower ground floor level omited and windows to rear at this level omitted. Garden formed as level space to improve amenity. Stonework to rear formed as squared random rubble as gables.

    Awaiting decision Conditions Windows or glazing 4 docs

In City of Edinburgh

  • 26/03535/FUL Awaiting decision

    33 Briggers Wynd South Queensferry EH30 9DS

    Erect garden room ancillary to main dwelling.

    1 Sep 2026 Full applications
  • 26/03515/FULSTL Awaiting decision

    Flat 1 2 King's Stables Road Edinburgh EH1 2JY

    Change of use of residential dwelling to a short-term let (in retrospect).

    31 Aug 2026 Full applications
  • 26/03522/FUL Awaiting decision

    10 Esplanade Terrace Edinburgh EH15 2ES

    Proposed alterations to an existing dwelling including; removal of existing conservatory. proposed singles to the extension to rear of building. replacement of existing garage door and access to from access road.

    31 Aug 2026 Full applications
  • 26/03516/FUL Awaiting decision

    Flat 1 67 Lochend Drive Edinburgh EH7 6DH

    Cut-down existing window to form new door opening and step construction.

    31 Aug 2026 Full applications
  • 26/03510/FULSTL Awaiting decision

    3F5 168 Albert Street Edinburgh EH7 5NA

    Retrospective change of use from residential dwelling to short-term let accommodation for up to 3 guests, with no structural alterations to the property.

    31 Aug 2026 Full applications