Skip to content
PlanIndex Get alerts
Menu

Planning application

31 East Clapperfield Edinburgh EH16 6TU

Awaiting decision City of Edinburgh 26/03417/FUL Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erect new single storey solid roof sunroom extension onto rear of property.

As published by the council, reference 26/03417/FUL

Application record

Reference
26/03417/FUL
Type
Planning Permission
Status
Awaiting Assessment
Received
21 Aug 2026
Validated
21 Aug 2026
Ward
Liberton/Gilmerton
Parish
Liberton + District
Decision by
Local Delegated Decision
Postcode
EH16 6TU

Comment by 16 September 2026

The council is taking comments on this application until then. Have your say on City of Edinburgh's portal.

Timeline

Dates from the published record

  1. 21 Aug 2026

    Received by City of Edinburgh

  2. 4 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 16 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of Edinburgh took a median of 38 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with City of Edinburgh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Proposed Telecoms Apparatus North Of 112 Dinmont Drive Inch Edinburgh

    25/05402/PNT Submitted 10 Oct 2025 215m away

    96% historically approved · decision due ~5 Dec

    PNT (Prior Notification for Telecoms) for a Pole.

    Awaiting decision Telecoms 2 docs
  • 33 Orrok Park Liberton Edinburgh EH16 5UW

    25/04964/CLP Submitted 17 Sep 2025 229m away

    77% historically approved · decision due ~13 Nov

    Proposed garage conversion forming study, WC and entrance with master bedroom remodelling.

    Awaiting decision Lawful development 5 docs
  • Liberton Fire Station 19 Kirk Brae Edinburgh EH16 6HH

    25/02427/VAR2 Submitted 26 Aug 2026 266m away

    86% historically approved · decision due ~21 Oct

    Non-material variation application to 25/02427/FUL. Remove existing masonry wall down to the higher ground level and add a new concrete coping to the remaining wall; Install metal posts and security fence panels to the areas NOT adjacent to the existing properties; Masonry directly adjacent to the existing properties is to be made good. Note this may prove impossible and in which case approval from the property owners will be sought to replace those sections with security fencing also; Replace all existing and proposed palisade fencing to the west and north sides with security mesh fencing for consistency.

    Awaiting decision Conditions 3 docs
    Small domestic
  • Liberton Fire Station 19 Kirk Brae Edinburgh EH16 6HH

    25/02427/VARY Submitted 24 Mar 2026 266m away

    Non-material variation application to 25/02427/FUL. Removal all of tree line H1 along with trees 1 + 2 shown on Arboriculture Report (100117006-MMD-XX-XX-RP-ARB-0001 AIA Liberton report A) and replace these with a native fast-growing species mix of Silver Birch, Hazel and Rowan.

    Decided Conditions Trees 5 docs
  • 12 Kirk Brae Liberton Edinburgh EH16 6HH

    26/01476/CLP Submitted 7 Apr 2026 330m away

    Alterations to windows and doors.

    Granted Lawful development Windows or glazing 8 docs
  • Land 40 Metres North Of 1 Kirk Brae Liberton Edinburgh

    25/06643/PNT Submitted 19 Dec 2025 372m away

    Proposed upgrade of existing base station installation.

    Granted Telecoms 9 docs

In City of Edinburgh

  • 26/03535/FUL Awaiting decision

    33 Briggers Wynd South Queensferry EH30 9DS

    Erect garden room ancillary to main dwelling.

    1 Sep 2026 Full applications
  • 26/03515/FULSTL Awaiting decision

    Flat 1 2 King's Stables Road Edinburgh EH1 2JY

    Change of use of residential dwelling to a short-term let (in retrospect).

    31 Aug 2026 Full applications
  • 26/03522/FUL Awaiting decision

    10 Esplanade Terrace Edinburgh EH15 2ES

    Proposed alterations to an existing dwelling including; removal of existing conservatory. proposed singles to the extension to rear of building. replacement of existing garage door and access to from access road.

    31 Aug 2026 Full applications
  • 26/03516/FUL Awaiting decision

    Flat 1 67 Lochend Drive Edinburgh EH7 6DH

    Cut-down existing window to form new door opening and step construction.

    31 Aug 2026 Full applications
  • 26/03510/FULSTL Awaiting decision

    3F5 168 Albert Street Edinburgh EH7 5NA

    Retrospective change of use from residential dwelling to short-term let accommodation for up to 3 guests, with no structural alterations to the property.

    31 Aug 2026 Full applications