Skip to content
PlanIndex Get alerts
Menu

Planning application

26 Teviotdale Place Edinburgh EH3 5HY

Awaiting decision City of Edinburgh 26/03220/LBC Listed Building Consent

Works: Loft or dormer Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Replace two windows to side of dormer, the frame will be timber to replace the current old, rotten timber and the glazing will be double with a 4mm space between each of the 2 4mm float glass panes.

As published by the council, reference 26/03220/LBC

Application record

Reference
26/03220/LBC
Type
Listed Building Consent
Status
Awaiting Assessment
Received
5 Aug 2026
Validated
11 Aug 2026
Ward
Inverleith
Parish
Stockbridge + Inverleith
Decision by
Delegated Decision
Postcode
EH3 5HY

Comment by 11 September 2026

The council is taking comments on this application until then. Have your say on City of Edinburgh's portal.

Timeline

Dates from the published record

  1. 5 Aug 2026

    Received by City of Edinburgh

  2. 11 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 18 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 6 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of Edinburgh took a median of 38 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with City of Edinburgh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About heritage and listed buildings applications

How this application type works

Heritage applications concern listed buildings and conservation areas. Listed building consent is needed for works, inside or out, that affect the special interest of a listed building, and carrying out such works without consent is a criminal offence. The council weighs harm to the heritage asset against any public benefit of the proposal.

More on heritage and listed buildings applications in our guide

Nearby applications

Within 500 metres

  • 6 Teviotdale Place Edinburgh EH3 5HY

    25/04629/TCO Submitted 5 Sep 2025 5m away

    94% historically approved · decision due ~12 Nov

    Fruiting cherry tree - Reduce crown by approx 1/3 - tree height currently approx 6 metres

    Awaiting decision Trees 2 docs
  • 28 Dunrobin Place Stockbridge Edinburgh EH3 5HZ

    25/04545/LBC Submitted 3 Sep 2025 35m away

    89% historically approved · decision due ~29 Oct

    Replace the existing single glazed sash and case windows with double glazed upgrades. Full restoration of the original case, manufacture and install like-for-like sashes with Heritage 'Slimlite' double glazing.

    Awaiting decision Heritage and listed buildings Windows or glazing 27 docs
  • 27 Kemp Place Stockbridge Edinburgh EH3 5HU

    26/00369/LBC Submitted 30 Jan 2026 56m away

    Replacement of 4 No. existing single-glazed timber window sashes with new slim heritage double-glazed timber sashes.

    Granted Heritage and listed buildings Windows or glazing 10 docs
  • 25 Balmoral Place Stockbridge Edinburgh EH3 5JA

    26/01342/LBC Submitted 30 Mar 2026 58m away

    Replacement timber double glazed windows.

    Decided Heritage and listed buildings Windows or glazing 5 docs
  • 4 Balmoral Place Edinburgh EH3 5JA

    19/05061/LBC Submitted 22 Oct 2019 60m away

    Alteration and refurbishment of GF Stockbridge Colonies flat.

    Granted Heritage and listed buildings 10 docs
  • 7 Kemp Place Stockbridge Edinburgh EH3 5HU

    26/00090/CLESTL Submitted 9 Jan 2026 61m away

    Short term let.

    Granted Lawful development 13 docs

In City of Edinburgh

  • 26/03530/LBC Awaiting decision

    3F 87 Constitution Street Edinburgh EH6 7AE

    Replace the existing single glazed sash and case windows with double glazed upgrades. Full restoration of the original case, manufacture and install like-for-like sashes with Heritage 'Slimlite' double glazing. Careful attention will be given when manufacturing new like for like sashes. All window moulds, dimensions and features of the original sashes will be retained and replicated on the new sashes.

    1 Sep 2026 Heritage and listed buildings
  • 26/03514/LBC Awaiting decision

    8A Warrender Park Crescent Edinburgh EH9 1DX

    Formation of one new window opening in the rear elevation of the kitchen, comprising a white-painted double-glazed timber sash-and-case window with natural sandstone lintel, rybats and cill to match the existing stonework.

    31 Aug 2026 Heritage and listed buildings
  • 26/03529/LBC Awaiting decision

    1 Eyre Crescent Edinburgh EH3 5ET

    Existing timber sash and case windows to be removed and replaced with new timber double glazed sash and case windows, all proportions to remain the same to match the existing.

    31 Aug 2026 Heritage and listed buildings
  • 26/03508/LBC Awaiting decision

    2F 45 Bread Street Edinburgh EH3 9AH

    Strip wallpaper; replaster and repaint internal walls and ceilings; repaint/replace internal doors and door handles; replace carpet with new carpet/laminate; install ceiling rose in living room; replace flat front door lock; replace wall sockets, light switches, and light fixtures; strip and repaint the existing internal window shutters.

    31 Aug 2026 Heritage and listed buildings
  • 26/03500/LBC Awaiting decision

    6 St Margaret's Road Edinburgh EH9 1AZ

    Formation of en-suite shower room and fitted wardrobe within bedroom of ground floor flat. En-suite and wardrobe taken part height only, allowing cornice to remain unaltered. Fit black cast iron extract termination grille at low level on external wall.

    28 Aug 2026 Heritage and listed buildings