Planning application
Malmaison Hotel 1 - 4 Tower Place Edinburgh EH6 7BZ
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Internal alterations.
As published by the council, reference 26/03208/LBC
Application record
- Reference
- 26/03208/LBC
- Type
- Listed Building Consent
- Status
- Awaiting Assessment
- Received
- 5 Aug 2026
- Validated
- 5 Aug 2026
- Ward
- Leith
- Parish
- Leith Harbour + Newhaven
- Decision by
- Delegated Decision
- Postcode
- EH6 7BZ
Timeline
Dates from the published record
-
5 Aug 2026
Received by City of Edinburgh
-
18 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 30 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
City of Edinburgh took a median of 43 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Dakota House Of Design Agent, a design practice registered in Newcastle Upon Tyne
Dissolved · incorporated 2008 · Newcastle Upon Tyne
12 applications on PlanIndex · across 6 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordMal HDV Property Holdings Ltd | Malmaison Edinburgh. Applicant
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
66 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with City of Edinburgh for determination, against a statutory target of eight weeks. Over the last year City of Edinburgh decided heritage and listed building applications in a median of 51 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land 30 Metres West Of 7 Tower Street Edinburgh
83% historically approved · decision due ~19 Aug
The proposal is to subdivide and redevelop existing hotel carpark with the construction of 18 number 1, 2 and 3 bed apartments contained within a single 5 storey block, including ancillary spaces, bin storage, landscaping and parking provision.
Awaiting decision Full applications New dwelling 24 docs -
Land 30 Metres West Of 7 Tower Street Edinburgh
The proposal is for the redevelopment of the existing surface car park and the construction of 18 number 1, 2 and 3 bed apartments contained within a single 5 storey block, including ancillary spaces, bin storage, landscaping and parking provision (as amended).
Withdrawn Full applications New dwelling 22 docs -
5 - 6 Shore North Leith Edinburgh EH6 6QS
83% historically approved · decision due ~8 Apr
Change of use from an engineering works, class 5, to a mixed-use of class 1, class 3, class 4, and class 11 to provide a mix of retail, office, food and drink, exhibitions, workshops, private-hire events, and industrial workshop.
Awaiting decision Full applications 13 docs -
5 - 6 Shore North Leith Edinburgh EH6 6QS
95% historically approved · decision due ~26 Aug
Replacement windows; the installation of an internal lift; installation of plant and flues at roof level; alterations to doors and openings; installation of new toilets; installation of kitchen and serving areas.
Awaiting decision Heritage and listed buildings Windows or glazing 16 docs -
Barge 1502U Shore Edinburgh EH6 6QW
83% historically approved · decision due ~21 Sep
Change of use of barge 1502 from office to Bar Restaurant including a new cantilevered decking for alfresco dining and new seating area on the quayside.
Awaiting decision Full applications 8 docs -
Maritime House 8 Shore North Leith Edinburgh EH6 6QN
83% historically approved · decision due ~4 Nov
Add heat pump to office premises on rear external elevation in car park area.
Awaiting decision Full applications 5 docs
Other heritage and listed building applications
In City of Edinburgh
-
26/04014/LBC Awaiting decision
3F1 320 Leith Walk Edinburgh EH6 5BU
Increase opening between kitchen and cupboard, and to create opening between cupboard and living room.
-
26/03855/LBC Granted
21 Ravelston Garden Ravelston Edinburgh EH4 3LE
Internal alterations to property, including formation of shower room, removal of masonry store in Kitchen, installation of w.c with toilet and all associated works.
-
26/03988/LBC Awaiting decision
BF, GF1, GF2, GF3 13 Great King Street New Town Edinburgh EH3 6QW
Internal reconfiguration, extension to rear and removal of a small section of boundary wall.
-
26/03989/LBC Awaiting decision
BF 18 Coates Crescent New Town Edinburgh EH3 7AF
Proposed alteration of existing window to create new doorway.
-
26/03967/LBC Awaiting decision
Camilla House 19 Grange Terrace Grange Edinburgh EH9 2LF
Erect a partition between the opening between lounge and dining room and erect a privacy partiton.