Skip to content
PlanIndex Get alerts
Menu

Planning application

50 Mayfield Road Mayfield Edinburgh EH9 2NH

Awaiting decision City of Edinburgh 26/02817/FUL Planning Permission

Works: Extension Loft or dormer Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Conservatory to be removed and replaced with single storey rear extension. New rooflights and glazed cupola reinstatement, internal alterations and ASHP installed.

As published by the council, reference 26/02817/FUL

Application record

Reference
26/02817/FUL
Type
Planning Permission
Status
Awaiting Assessment
Received
6 Jul 2026
Validated
15 Jul 2026
Ward
Southside/Newington
Parish
Grange + Prestonfield
Decision by
Local Delegated Decision
Postcode
EH9 2NH

Timeline

Dates from the published record

  1. 6 Jul 2026

    Received by City of Edinburgh

  2. 15 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 6 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 9 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of Edinburgh took a median of 38 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with City of Edinburgh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 50 Mayfield Road Edinburgh EH9 2NH

    21/05102/LBC Submitted 29 Sep 2021 10m away

    The proposed use is as a Class 9 House - a dwellinghouse for only one family.

    Decided Heritage and listed buildings 9 docs
    Several homes
  • 2 Relugas Road Grange Edinburgh EH9 2NE

    25/04980/TCO Submitted 18 Sep 2025 23m away

    94% historically approved · decision due ~14 Nov

    Multi stemmed Ash tree in garage area. Crown lift to 2.5m. Ensure 1m clearance from buildings reduce crown height & crown spread by 30% (7m down to 4.5m & 4m radial spread in, to 2.5m).

    Awaiting decision Trees 8 docs
  • 1A Relugas Road Grange Edinburgh EH9 2NE

    26/0530/TCO Submitted 7 Jul 2026 50m away

    94% historically approved · decision due ~1 Sep

    Aesculus hippocastanum in Front garden next to driveway - Pollarding of tree down to previous pollard points, Tilia × europaea at side of house - Crown reduce tree by overall of 1.5 meter and crown thin by 5 percent, Tilia × europaea at side of house - Crown reduce tree by overall of 1.5 meter and crown thin by 5 percent

    Awaiting decision Trees 5 docs
  • 116 Findhorn Place Grange Edinburgh EH9 2PB

    26/00360/FUL Submitted 30 Jan 2026 50m away

    Attic conversion including new dormer windows to front and rear elevations.

    Granted Full applications Loft or dormer Windows or glazing 10 docs
  • 53A Mayfield Road Edinburgh EH9 2NQ

    20/03701/TCO Submitted 3 Sep 2020 56m away

    T1 Ash - T1: Fell to ground level of diseased ash to make safe. Tree is suffering from ash die back.

    Decided Trees 5 docs
  • 122 Findhorn Place Edinburgh EH9 2PB

    25/06684/FUL Submitted 23 Dec 2025 59m away

    83% historically approved · decision due ~17 Feb

    Alterations to single storey rear outshoot including new glazed sliding doors and new glazing, and replacement of existing rear kitchen window with door. New raised terrace to provide level access to garden.

    Awaiting decision Full applications Windows or glazing 9 docs
    Small domestic

In City of Edinburgh

  • 26/03535/FUL Awaiting decision

    33 Briggers Wynd South Queensferry EH30 9DS

    Erect garden room ancillary to main dwelling.

    1 Sep 2026 Full applications
  • 26/03515/FULSTL Awaiting decision

    Flat 1 2 King's Stables Road Edinburgh EH1 2JY

    Change of use of residential dwelling to a short-term let (in retrospect).

    31 Aug 2026 Full applications
  • 26/03522/FUL Awaiting decision

    10 Esplanade Terrace Edinburgh EH15 2ES

    Proposed alterations to an existing dwelling including; removal of existing conservatory. proposed singles to the extension to rear of building. replacement of existing garage door and access to from access road.

    31 Aug 2026 Full applications
  • 26/03516/FUL Awaiting decision

    Flat 1 67 Lochend Drive Edinburgh EH7 6DH

    Cut-down existing window to form new door opening and step construction.

    31 Aug 2026 Full applications
  • 26/03510/FULSTL Awaiting decision

    3F5 168 Albert Street Edinburgh EH7 5NA

    Retrospective change of use from residential dwelling to short-term let accommodation for up to 3 guests, with no structural alterations to the property.

    31 Aug 2026 Full applications