Skip to content
PlanIndex Get alerts
Menu

Planning application

92 Restalrig Road Edinburgh EH6 8BH

Awaiting decision City of Edinburgh 26/02757/FUL Planning Permission

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Conversion of dwelling to form two dwellings including external alterations.

As published by the council, reference 26/02757/FUL

Application record

Reference
26/02757/FUL
Type
Planning Permission
Status
Awaiting Assessment
Received
30 Jun 2026
Validated
30 Jun 2026
Ward
Leith
Parish
Leith Links
Decision by
Local Delegated Decision
Postcode
EH6 8BH

Timeline

Dates from the published record

  1. 30 Jun 2026

    Received by City of Edinburgh

  2. 12 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 25 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of Edinburgh took a median of 38 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with City of Edinburgh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 92 Restalrig Road Edinburgh EH6 8BH

    26/02756/LBC Submitted 30 Jun 2026 1m away

    89% historically approved · decision due ~25 Aug

    Internal sudivision alterations and minor external alterations.

    Awaiting decision Heritage and listed buildings 6 docs
  • 87 Restalrig Road Edinburgh EH6 8BQ

    26/01003/LBC Submitted 13 Mar 2026 54m away

    Replace single glazed sash and case windows with slimline double glazed sash and case units.

    Granted Heritage and listed buildings Windows or glazing 9 docs
  • 102 Restalrig Road Edinburgh

    25/04283/FULSTL Submitted 19 Aug 2025 98m away

    83% historically approved · decision due ~3 Nov

    Change of use of existing office building to six number short term holiday let flats with alterations (material amendments to previous permission under ref 24/04888/FULSTL).

    Awaiting decision Full applications New dwelling 8 docs
  • 3 Ryehill Grove Lochend Edinburgh EH6 8ET

    26/00734/CLP Submitted 26 Feb 2026 113m away

    The conversion of an existing unabitable loft space into a habitable loft space (loft conversion) to consist of 2 bedrooms and a bathroom.

    Granted Lawful development Loft or dormer 14 docs
  • 133 Restalrig Road Edinburgh EH7 6HN

    25/06396/ADV Submitted 8 Dec 2025 155m away

    Advertisement of the following types: Hoarding. Replacing existing paper and paste hoarding with digital D48 advert.

    Granted Advertising 11 docs
  • 38 Cornhill Terrace Lochend Edinburgh EH6 8EL

    26/00378/FUL Submitted 2 Feb 2026 178m away

    Alterations to property to create habitable attic space including new rooflight windows and dormer.

    Granted Full applications Loft or dormer Windows or glazing 9 docs

In City of Edinburgh

  • 26/03535/FUL Awaiting decision

    33 Briggers Wynd South Queensferry EH30 9DS

    Erect garden room ancillary to main dwelling.

    1 Sep 2026 Full applications
  • 26/03515/FULSTL Awaiting decision

    Flat 1 2 King's Stables Road Edinburgh EH1 2JY

    Change of use of residential dwelling to a short-term let (in retrospect).

    31 Aug 2026 Full applications
  • 26/03522/FUL Awaiting decision

    10 Esplanade Terrace Edinburgh EH15 2ES

    Proposed alterations to an existing dwelling including; removal of existing conservatory. proposed singles to the extension to rear of building. replacement of existing garage door and access to from access road.

    31 Aug 2026 Full applications
  • 26/03516/FUL Awaiting decision

    Flat 1 67 Lochend Drive Edinburgh EH7 6DH

    Cut-down existing window to form new door opening and step construction.

    31 Aug 2026 Full applications
  • 26/03510/FULSTL Awaiting decision

    3F5 168 Albert Street Edinburgh EH7 5NA

    Retrospective change of use from residential dwelling to short-term let accommodation for up to 3 guests, with no structural alterations to the property.

    31 Aug 2026 Full applications