Planning application
4 Bellfield Lane Edinburgh EH15 2BL
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Change of use of residential premises to short-term let accommodation.
As published by the council, reference 26/02475/FULSTL
Application record
- Reference
- 26/02475/FULSTL
- Type
- Planning Permission STL
- Status
- Awaiting Assessment
- Received
- 11 Jun 2026
- Validated
- 11 Jun 2026
- Ward
- Portobello/Craigmillar
- Parish
- Portobello (Inactive)
- Decision by
- Local Delegated Decision
- Postcode
- EH15 2BL
Timeline
Dates from the published record
-
11 Jun 2026
Received by City of Edinburgh
-
12 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 6 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
City of Edinburgh took a median of 38 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with City of Edinburgh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
2 Bellfield Street Edinburgh EH15 2BP
Alterations and refurbishment of existing dwelling, arranged at first and second floor levels. Alter existing first floor bathroom to form new shower room and utility and relocation of kitchen. Create new bathroom at second floor level within existing store and create new internal hallway, leading to bedrooms. Removal of existing deteriorated skylights and installation of new Velux Conservation rooflights. Fit new flat rooflight on existing flat roof to serve the second floor bedroom.
Granted Heritage and listed buildings Loft or dormer 9 docsDomestic -
2 Bellfield Street Edinburgh EH15 2BP
Proposed alterations and refurbishment of existing dwelling house, located at first and second floor levels. Removal of existing skylights and installation of new replacement conservation velux roof lights. Installation of new Velux flat roof roof light on the existing flat roof.
Granted Full applications Loft or dormer 8 docsDomestic -
6 Bellfield Street Portobello East Edinburgh EH15 2BP
94% historically approved · decision due ~1 Sep
Prunus avium - Reduce canopy 1 to 1.5 meters.
Awaiting decision Trees 2 docs -
283 Portobello High Street Portobello West Edinburgh EH15 2AR
94% historically approved · decision due ~11 Dec
Crown reduction roughly 2m or fell. Significant dieback. Ash A7 crown reduction roughly 2m or fell. Significant dieback. Sycamore S4 crown reduction. Roughly 2m. Ash A8 crown reduction roughly 2.5m or fell. Dieback. Eucalyptus E1 crown reduction. Roughly 2m.
Awaiting decision Trees 16 docs -
11 Bellfield Lane Edinburgh EH15 2BL
Large eucalyptus tree adjacent to boundary wall - complete removal by professional service.
Decided Trees 3 docsSmall domestic -
15 Bellfield Lane Edinburgh EH15 2BL
94% historically approved · decision due ~12 Oct
30ft Ash tree felling the 30ft Ash Tree in the back garden of the property.
Awaiting decision Trees 4 docs
Other full applications applications
In City of Edinburgh
-
26/03535/FUL Awaiting decision
33 Briggers Wynd South Queensferry EH30 9DS
Erect garden room ancillary to main dwelling.
-
26/03515/FULSTL Awaiting decision
Flat 1 2 King's Stables Road Edinburgh EH1 2JY
Change of use of residential dwelling to a short-term let (in retrospect).
-
26/03522/FUL Awaiting decision
10 Esplanade Terrace Edinburgh EH15 2ES
Proposed alterations to an existing dwelling including; removal of existing conservatory. proposed singles to the extension to rear of building. replacement of existing garage door and access to from access road.
-
26/03516/FUL Awaiting decision
Flat 1 67 Lochend Drive Edinburgh EH7 6DH
Cut-down existing window to form new door opening and step construction.
-
26/03510/FULSTL Awaiting decision
3F5 168 Albert Street Edinburgh EH7 5NA
Retrospective change of use from residential dwelling to short-term let accommodation for up to 3 guests, with no structural alterations to the property.