Planning application
28 Main Street Kirkliston EH29 9AA
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Change of use from Class 3 (Café) to Sui Generis (Hot food takeaway).
As published by the council, reference 26/02181/FUL
Application record
- Reference
- 26/02181/FUL
- Type
- Planning Permission
- Status
- Awaiting Assessment
- Received
- 20 May 2026
- Validated
- 11 Jun 2026
- Ward
- Almond
- Parish
- Kirkliston
- Decision by
- Local Delegated Decision
- Postcode
- EH29 9AA
Timeline
Dates from the published record
-
20 May 2026
Received by City of Edinburgh
-
11 Jun 2026
Validated
Checked as complete and ready for consideration.
-
6 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 6 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
City of Edinburgh took a median of 38 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with City of Edinburgh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
53 Newmains Road Newmains Kirkliston EH29 9AW
Proposed rear extension.
Granted Full applications Extension 9 docs -
51 Newmains Road Newmains Kirkliston EH29 9AW
83% historically approved · decision due ~2 Jun
Proposed erection of front porch , garage and decking to rear garden.
Awaiting decision Full applications Extension 9 docsSmall domestic -
Newliston Arms 78 - 82 Main Street Kirkliston EH29 9AB
94% historically approved · decision due ~3 Nov
Dangerous Eucalyptus tree, this tree needs to be trimmed back ASAP & potentially removed.
Awaiting decision Trees 5 docs -
2 Station Road Kirkliston
Existing mature Maple Tree - Removal of tree for the installation of new water and sewer connection pipes
Decided Trees 4 docs -
Holy Cottage 39 Main Street Kirkliston EH29 9AF
Alterations to existing dwellinghouse.
Granted Full applications 10 docsDomestic -
43 Allan Park Kirkliston EH29 9BP
Single-storey extension to rear of existing dwelling.
Granted Lawful development Extension 8 docsSmall domestic
Other full applications applications
In City of Edinburgh
-
26/03535/FUL Awaiting decision
33 Briggers Wynd South Queensferry EH30 9DS
Erect garden room ancillary to main dwelling.
-
26/03515/FULSTL Awaiting decision
Flat 1 2 King's Stables Road Edinburgh EH1 2JY
Change of use of residential dwelling to a short-term let (in retrospect).
-
26/03522/FUL Awaiting decision
10 Esplanade Terrace Edinburgh EH15 2ES
Proposed alterations to an existing dwelling including; removal of existing conservatory. proposed singles to the extension to rear of building. replacement of existing garage door and access to from access road.
-
26/03516/FUL Awaiting decision
Flat 1 67 Lochend Drive Edinburgh EH7 6DH
Cut-down existing window to form new door opening and step construction.
-
26/03510/FULSTL Awaiting decision
3F5 168 Albert Street Edinburgh EH7 5NA
Retrospective change of use from residential dwelling to short-term let accommodation for up to 3 guests, with no structural alterations to the property.