Skip to content
PlanIndex Get alerts
Menu

Planning application

Land 130 Metres North Of 7 Brighouse Park Rigg Edinburgh

Awaiting decision City of Edinburgh 26/01497/FUL Planning Permission

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposed installation of replacement below ground combined sewage overflow (CSO) system, associated pipework, and ground level changes.

As published by the council, reference 26/01497/FUL

Application record

Reference
26/01497/FUL
Type
Planning Permission
Status
Awaiting Assessment
Received
8 Apr 2026
Validated
16 Apr 2026
Ward
Almond
Parish
Cramond, Barnton + Cammo
Decision by
Local Delegated Decision

Timeline

Dates from the published record

  1. 8 Apr 2026

    Received by City of Edinburgh

  2. 16 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 12 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 11 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of Edinburgh took a median of 38 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with City of Edinburgh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 5 Brighouse Park Gardens Edinburgh EH4 6GY

    23/02797/FUL Submitted 28 Jun 2023 144m away

    Two storey side extension with internal alterations to form an orangery on the north-west and north-east elevation. (AS AMENDED)

    Granted Full applications Extension 19 docs
  • Land 430 Metres North Of 10 Cramond Road North Edinburgh

    26/00874/PRN Submitted 26 Feb 2026 302m away

    Installation of replacement below ground Combined Sewage Overflow (CSO), associated pipework, manholes and 1 new above ground control kiosks. Kiosk will not exceed 2m (H) x 3m (W) x 1m (D) and be coloured holly green.

    Granted Prior approval 5 docs
  • Cramond Tower 4 Kirk Cramond Edinburgh EH4 6HZ

    26/01656/LBC Submitted 20 Apr 2026 303m away

    89% historically approved · decision due ~14 Jul

    Formation of timber bi-folding doors with associated decking for access. Erection of external plant room to the rear elevation and garden room to the west in place of an existing timber shed.

    Awaiting decision Heritage and listed buildings Windows or glazing 26 docs
    Small domestic
  • Cramond Tower 4 Kirk Cramond Edinburgh EH4 6HZ

    26/01655/FUL Submitted 20 Apr 2026 306m away

    83% historically approved · decision due ~15 Jun

    Formation of bi-folding doors to rear elevation with associated decking for access. Erection of external plant room to the rear elevation and garden room to the west in place of an existing timber shed.

    Awaiting decision Full applications Windows or glazing 31 docs
    Small domestic
  • 7 Cramond Glebe Gardens Edinburgh EH4 6NZ

    26/03015/WINPA Submitted 21 Jul 2026 337m away

    97% historically approved · decision due ~15 Sep

    Proposal to replace existing aluminum casement and fixed windows to the front and side with new 'Anthracite Grey' upvc casement, tilt and turn and fixed windows to the front. The existing rear 'White' upvc tilt and turn windows will be replace with new ' Anthracite Grey' tilt and turn windows.

    Awaiting decision Prior approval Windows or glazing 8 docs
  • 02 Cramond Kirk 18 Cramond Glebe Road Edinburgh EH4 6NS

    20/01184/FUL Submitted 9 Mar 2020 345m away

    Remove existing steel single glazed windows and fit new anthracite grey upvc windows with one of the windows to be removed to have the wall below knocked down to form new single door with fanlight.

    Decided Full applications Windows or glazing 7 docs

In City of Edinburgh

  • 26/03535/FUL Awaiting decision

    33 Briggers Wynd South Queensferry EH30 9DS

    Erect garden room ancillary to main dwelling.

    1 Sep 2026 Full applications
  • 26/03515/FULSTL Awaiting decision

    Flat 1 2 King's Stables Road Edinburgh EH1 2JY

    Change of use of residential dwelling to a short-term let (in retrospect).

    31 Aug 2026 Full applications
  • 26/03522/FUL Awaiting decision

    10 Esplanade Terrace Edinburgh EH15 2ES

    Proposed alterations to an existing dwelling including; removal of existing conservatory. proposed singles to the extension to rear of building. replacement of existing garage door and access to from access road.

    31 Aug 2026 Full applications
  • 26/03516/FUL Awaiting decision

    Flat 1 67 Lochend Drive Edinburgh EH7 6DH

    Cut-down existing window to form new door opening and step construction.

    31 Aug 2026 Full applications
  • 26/03510/FULSTL Awaiting decision

    3F5 168 Albert Street Edinburgh EH7 5NA

    Retrospective change of use from residential dwelling to short-term let accommodation for up to 3 guests, with no structural alterations to the property.

    31 Aug 2026 Full applications