Planning application
Proposed Telecoms Apparatus 20 Metres South Of 70 Larkfield Gardens Edinburgh
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
1 x 10m medium wooden pole.
As published by the council, reference 26/01144/PNTELE
Application record
- Reference
- 26/01144/PNTELE
- Type
- Prior Notification
- Status
- Permitted Development
- Decision
- Permitted Development
- Received
- 20 Mar 2026
- Validated
- 23 Mar 2026
- Decided
- 1 Apr 2026
- Ward
- No Ward Number
- Parish
- Trinity
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
20 Mar 2026
Received by City of Edinburgh
-
23 Mar 2026
Validated
Checked as complete and ready for consideration.
-
1 Apr 2026
Decision issued: Permitted Development
-
14 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About prior approval applications
How this application type works
Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.
Nearby applications
Within 500 metres
-
47 Larkfield Gardens Trinity Edinburgh EH5 3QB
94% historically approved · decision due ~30 Dec
T1 Cherry - Reduction.
Awaiting decision Trees 3 docs -
-
44 Larkfield Gardens Edinburgh EH5 3QB
1 Ornamental Cherry Tree Tag No. 1637. 2nd Tag No. 0841 added by Tree Survey August 2010 - Tree Maintenance: Crown Thinning, Removal of Deadwood, Balancing/Trimming of upper Branches.
Granted Trees 3 docs -
Woodland To Front Of Larkfield Gardens Edinburgh
3 Beech (00438) 16m high with trunk diameter of 25-40cms. Includes tree with tag and ones either side - to crown lift over Rhododendrons to give 5m ground clearance. Elm (621) 14m high with trunk diameter of 60cms - to crown lift to give 3m ground clearance. Weeping Ash (0795) 9m high with trunk diameter of 35cms - cut to stump. Weeping Ash (1651) 10m high with trunk diameter of 45cms - cut to stump. Lime (0735) 22m high with trunk diameter of 90cms - to crown lift over pavement to give 3m ground clearance.
Decided Trees 3 docs -
296 Ferry Road Edinburgh EH5 3NP
Alterations to flat to improve kitchen layout and reconfigure door/window arrangement at rear of kitchen.
Granted Full applications Windows or glazing 6 docs -
53 Larkfield Gardens Trinity Edinburgh EH5 3QB
Erect flat roofed single storey extension to rear of property.
Granted Lawful development Extension 6 docsSmall domestic
Other prior approval applications
In City of Edinburgh
-
26/03429/WINPA Granted
28 Mayfield Gardens Edinburgh EH9 2BZ
Replacement of timber sash and case style window for new PVCu double glazed sliding sash window.
-
26/03468/WINPA Awaiting decision
2F1 59 Morningside Road Edinburgh EH10 4AZ
The window frame will not be altered. The timber sash and case will be replaced with a uPVC sash and case.
-
26/03426/WINPA Granted
1F2 110 Comiston Road Edinburgh EH10 5QL
I bought Flat 4 110 Comiston Road on 10th July 2026 and I am notifying you and ask for prior approval that I will reinstate the original wooden sash window design throughout the property and replace the current UPVC windows at the property. The current windows open fully (swing) and are not the original opening method as should be in sash windows. I have a quote from "Edinburgh Sash and Case Company", and have already paid for the initial work of making the windows from scratch. The windows are due to be installed with great care and attention to detail in the middle of September 2026.
-
26/03427/WINPA Awaiting decision
24 Blackford Avenue Edinburgh EH9 2PH
Replacement of aluminium sliding sash and case style windows for new pVCU double glazed sliding sash windows.
-
26/03380/PNTEL Awaiting decision
Leith St Andrews Hall 410 Easter Road Edinburgh EH6 8HT
Proposed shared telecommunications base station comprising the installation of 8no. antennas within bell tower on support poles mounted to new grillage flooring over existing steel beams; installation of 12no. ERS mounted internally to bell tower wall and 24no. ERS on antenna support poles; replacement of existing louvres with Glass Reinforced Plastic Louvres; replacement of timber staircase on third floor of bell tower with access ladder; removal of church bells and timber frame; Installation of 2no. equipment cabinets and 1no. meter cabinet at ground level; and associated landscaping and ancillary development.