Skip to content
PlanIndex Get alerts
Menu

Planning application

200 Craigcrook Road Blackhall Edinburgh EH4 7BA

Granted City of Edinburgh 26/01026/FUL Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Second storey side, and single storey rear extension.

As published by the council, reference 26/01026/FUL

Application record

Reference
26/01026/FUL
Type
Planning Permission
Status
Application Granted
Decision
Granted
Received
16 Mar 2026
Validated
2 Apr 2026
Decided
28 Apr 2026
Ward
Inverleith
Parish
Craigleith + Blackhall
Decision by
Local Delegated Decision
Postcode
EH4 7BA

Timeline

Dates from the published record

  1. 16 Mar 2026

    Received by City of Edinburgh

  2. 2 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 28 Apr 2026

    Decision issued: Granted

  4. 14 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 16 Hillpark Crescent Blackhall Edinburgh EH4 7BG

    26/00380/FUL Submitted 2 Feb 2026 152m away

    Alterations to detached dwelling house including: alterations to materials and canopy to front elevation; two storey side extension to replace garage; single storey rear extension; replacement, enlarged garage ( as amended)

    Granted Full applications New dwelling Extension 12 docs
    Small domestic
  • 7 Hillpark Avenue Edinburgh EH4 7AT

    21/05902/FUL Submitted 5 Nov 2021 156m away

    Proposed single storey rear extension. Extended bay window to front lounge. Two new dormers to front and single dormer to rear. Associated internal alterations.

    Refused Full applications Extension Loft or dormer +1 8 docs
    Small domestic
  • 1 Hillpark Road Edinburgh EH4 7AR

    25/05627/CLP Submitted 22 Oct 2025 159m away

    77% historically approved · decision due ~17 Dec

    Proposed alterations to form new external sliding doors and in-fill extension to rear of property.

    Awaiting decision Lawful development Extension 6 docs
  • 3 Marchfield Park Edinburgh EH4 5BW

    20/00194/TPO Submitted 16 Jan 2020 197m away

    4 Sycamores & 1 Horse Chestnut on south boundary. Crown lift to 5m. - Westmost Sycamore inspect cavities at approx 10m on east side. Perform pull tests., South boundary lapsed Beech hedge. Reduce down to approx. 5m. - Remove overhang from over neighbouring house., West boundary lapsed Beech hedge. - Reduce down and tidy up taller sections down to 5m., NW corner Cherry leaning heavily over neighbour. - Reduce back to boundary line.

    Granted Trees 3 docs
  • 3 Marchfield Park Edinburgh EH4 5BW

    18/09324/TPO Submitted 19 Oct 2018 197m away

    94% historically approved · decision due ~14 Dec

    Please see attached detailed tree works specification. - Please see attached detailed tree works specification.

    Awaiting decision Trees
  • 4 Marchfield Park Edinburgh EH4 5BW

    04/00113/FUL Submitted 15 Jan 2004 197m away

    Erect conservatories, add dormer windows

    Granted Full applications Loft or dormer Windows or glazing 3 docs

In City of Edinburgh

  • 26/03535/FUL Awaiting decision

    33 Briggers Wynd South Queensferry EH30 9DS

    Erect garden room ancillary to main dwelling.

    1 Sep 2026 Full applications
  • 26/03515/FULSTL Awaiting decision

    Flat 1 2 King's Stables Road Edinburgh EH1 2JY

    Change of use of residential dwelling to a short-term let (in retrospect).

    31 Aug 2026 Full applications
  • 26/03522/FUL Awaiting decision

    10 Esplanade Terrace Edinburgh EH15 2ES

    Proposed alterations to an existing dwelling including; removal of existing conservatory. proposed singles to the extension to rear of building. replacement of existing garage door and access to from access road.

    31 Aug 2026 Full applications
  • 26/03516/FUL Awaiting decision

    Flat 1 67 Lochend Drive Edinburgh EH7 6DH

    Cut-down existing window to form new door opening and step construction.

    31 Aug 2026 Full applications
  • 26/03510/FULSTL Awaiting decision

    3F5 168 Albert Street Edinburgh EH7 5NA

    Retrospective change of use from residential dwelling to short-term let accommodation for up to 3 guests, with no structural alterations to the property.

    31 Aug 2026 Full applications