Skip to content
PlanIndex Get alerts
Menu

Planning application

Pilrig St Paul's Church 1A Pilrig Street Pilrig Edinburgh EH6 5AH

Awaiting decision City of Edinburgh 26/00703/LBC Listed Building Consent

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Removal of 3 No. existing antennas and ancillary apparatus and replacement with 4 No. new antennas fixed to existing supporting steelwork behind the GRP windows.

As published by the council, reference 26/00703/LBC

Application record

Reference
26/00703/LBC
Type
Listed Building Consent
Status
Awaiting Assessment
Received
24 Feb 2026
Validated
24 Feb 2026
Ward
Leith Walk
Parish
Leith Central
Decision by
Delegated Decision
Postcode
EH6 5AH

Timeline

Dates from the published record

  1. 24 Feb 2026

    Received by City of Edinburgh

  2. 14 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 21 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of Edinburgh took a median of 38 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with City of Edinburgh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About heritage and listed buildings applications

How this application type works

Heritage applications concern listed buildings and conservation areas. Listed building consent is needed for works, inside or out, that affect the special interest of a listed building, and carrying out such works without consent is a criminal offence. The council weighs harm to the heritage asset against any public benefit of the proposal.

More on heritage and listed buildings applications in our guide

Nearby applications

Within 500 metres

  • Pilrig St Paul's Church 1A Pilrig Street Pilrig Edinburgh EH6 5AH

    26/00709/PNT Submitted 24 Feb 2026 0m away

    96% historically approved · decision due ~21 Apr

    Removal of 3 No. existing antennas and ancillary apparatus and replacement with 4 No. new antennas fixed to existing supporting steelwork behind the GRP windows, an upgrade of equipment within the church tower and ancillary development thereto.

    Awaiting decision Telecoms Windows or glazing 14 docs
  • 1 Pilrig Street Pilrig Edinburgh EH6 5AH

    25/05709/LBC Submitted 28 Oct 2025 14m away

    89% historically approved · decision due ~30 Dec

    We seek to move powered appliances and plumbing from the current kitchen area into the adjacent room. All works would be reversible.

    Awaiting decision Heritage and listed buildings 8 docs
  • 11A Pilrig Street Edinburgh EH6 5AN

    26/01553/LBC Submitted 13 Apr 2026 49m away

    Replacement of deteriorated (non-original) sash windows as slimline, timber, double glazed sashes on a like-for-like basis.

    Granted Heritage and listed buildings Windows or glazing 8 docs
  • 26 Pilrig Street Pilrig Edinburgh EH6 5AJ

    26/00255/FUL Submitted 22 Jan 2026 52m away

    Change of use to form residential town house on upper floors with a separate residential flat on the lower ground floor level.

    Withdrawn Full applications 10 docs
  • 26 Pilrig Street Pilrig Edinburgh EH6 5AJ

    26/01331/LBC Submitted 30 Mar 2026 52m away

    Internal alterations removal of walls / floor over stair.

    Granted Heritage and listed buildings 9 docs
  • 26 Pilrig Street Edinburgh EH6 5AJ

    25/05111/LBC Submitted 25 Sep 2025 52m away

    Proposed minor internal alterations to lower ground, ground and first floors in retrospect.

    Granted Heritage and listed buildings 9 docs

In City of Edinburgh

  • 26/03530/LBC Awaiting decision

    3F 87 Constitution Street Edinburgh EH6 7AE

    Replace the existing single glazed sash and case windows with double glazed upgrades. Full restoration of the original case, manufacture and install like-for-like sashes with Heritage 'Slimlite' double glazing. Careful attention will be given when manufacturing new like for like sashes. All window moulds, dimensions and features of the original sashes will be retained and replicated on the new sashes.

    1 Sep 2026 Heritage and listed buildings
  • 26/03514/LBC Awaiting decision

    8A Warrender Park Crescent Edinburgh EH9 1DX

    Formation of one new window opening in the rear elevation of the kitchen, comprising a white-painted double-glazed timber sash-and-case window with natural sandstone lintel, rybats and cill to match the existing stonework.

    31 Aug 2026 Heritage and listed buildings
  • 26/03529/LBC Awaiting decision

    1 Eyre Crescent Edinburgh EH3 5ET

    Existing timber sash and case windows to be removed and replaced with new timber double glazed sash and case windows, all proportions to remain the same to match the existing.

    31 Aug 2026 Heritage and listed buildings
  • 26/03508/LBC Awaiting decision

    2F 45 Bread Street Edinburgh EH3 9AH

    Strip wallpaper; replaster and repaint internal walls and ceilings; repaint/replace internal doors and door handles; replace carpet with new carpet/laminate; install ceiling rose in living room; replace flat front door lock; replace wall sockets, light switches, and light fixtures; strip and repaint the existing internal window shutters.

    31 Aug 2026 Heritage and listed buildings
  • 26/03500/LBC Awaiting decision

    6 St Margaret's Road Edinburgh EH9 1AZ

    Formation of en-suite shower room and fitted wardrobe within bedroom of ground floor flat. En-suite and wardrobe taken part height only, allowing cornice to remain unaltered. Fit black cast iron extract termination grille at low level on external wall.

    28 Aug 2026 Heritage and listed buildings