Skip to content
PlanIndex Get alerts
Menu

Planning application

22 Carlyle Place Abbeyhill Edinburgh EH7 5SR

Awaiting decision City of Edinburgh 26/00456/WINPA Prior Approval Windows

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposal to replace existing whiter aluminium sash and case windows with new white upvc sash and case windows.

As published by the council, reference 26/00456/WINPA

Application record

Reference
26/00456/WINPA
Type
Prior Approval Windows
Status
Awaiting Assessment
Received
6 Feb 2026
Validated
11 Feb 2026
Ward
Leith Walk
Parish
Leith Central
Decision by
Delegated Decision
Postcode
EH7 5SR

Timeline

Dates from the published record

  1. 6 Feb 2026

    Received by City of Edinburgh

  2. 11 Feb 2026

    Validated

    Checked as complete and ready for consideration.

  3. 12 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 8 April 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of Edinburgh took a median of 38 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with City of Edinburgh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About prior approval applications

How this application type works

Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.

More on prior approval applications in our guide

Nearby applications

Within 500 metres

  • 29 Waverley Place Abbeyhill Edinburgh EH7 5SA

    26/00474/FUL Submitted 10 Feb 2026 31m away

    83% historically approved · decision due ~7 Apr

    Extended adjacent dormers on 29 & 30 Waverley Place.

    Awaiting decision Full applications Loft or dormer 7 docs
  • 25 Regent Place Edinburgh EH7 5BG

    19/02633/TCO Submitted 3 Jun 2019 61m away

    Cherry Tree causing structural damage to footpath and boundary wall. Roots are protruding building - full removal of cherry tree including stump grinding.

    Decided Trees 2 docs
    Small domestic
  • 29 Regent Place Edinburgh EH7 5BG

    07/00429/FUL Submitted 5 Feb 2007 61m away

    Install rooflight to east facing roof

    Granted Full applications Loft or dormer 5 docs
  • 31 Regent Place Edinburgh EH7 5BG

    26/01789/FUL Submitted 27 Apr 2026 63m away

    83% historically approved · decision due ~22 Jun

    Install new roof window.

    Awaiting decision Full applications Roofing Windows or glazing 5 docs
  • 23 Regent Place Edinburgh EH7 5BG

    26/0437/TCO Submitted 10 Jun 2026 83m away

    94% historically approved · decision due ~6 Aug

    Ornamental Cherry tree pruning, needs doing every two years or tree overgrows signage etc.

    Awaiting decision Trees 4 docs
  • 23 Regent Place Edinburgh EH7 5BG

    26/0378/TCO Submitted 19 May 2026 86m away

    94% historically approved · decision due ~20 Jul

    Medium size cherry tree in front garden 1 foot reduction.

    Awaiting decision Trees 3 docs

In City of Edinburgh

  • 26/03429/WINPA Granted

    28 Mayfield Gardens Edinburgh EH9 2BZ

    Replacement of timber sash and case style window for new PVCu double glazed sliding sash window.

    21 Aug 2026 Prior approval
  • 26/03468/WINPA Awaiting decision

    2F1 59 Morningside Road Edinburgh EH10 4AZ

    The window frame will not be altered. The timber sash and case will be replaced with a uPVC sash and case.

    26 Aug 2026 Prior approval
  • 26/03426/WINPA Granted

    1F2 110 Comiston Road Edinburgh EH10 5QL

    I bought Flat 4 110 Comiston Road on 10th July 2026 and I am notifying you and ask for prior approval that I will reinstate the original wooden sash window design throughout the property and replace the current UPVC windows at the property. The current windows open fully (swing) and are not the original opening method as should be in sash windows. I have a quote from "Edinburgh Sash and Case Company", and have already paid for the initial work of making the windows from scratch. The windows are due to be installed with great care and attention to detail in the middle of September 2026.

    21 Aug 2026 Prior approval
  • 26/03427/WINPA Awaiting decision

    24 Blackford Avenue Edinburgh EH9 2PH

    Replacement of aluminium sliding sash and case style windows for new pVCU double glazed sliding sash windows.

    21 Aug 2026 Prior approval
  • 26/03380/PNTEL Awaiting decision

    Leith St Andrews Hall 410 Easter Road Edinburgh EH6 8HT

    Proposed shared telecommunications base station comprising the installation of 8no. antennas within bell tower on support poles mounted to new grillage flooring over existing steel beams; installation of 12no. ERS mounted internally to bell tower wall and 24no. ERS on antenna support poles; replacement of existing louvres with Glass Reinforced Plastic Louvres; replacement of timber staircase on third floor of bell tower with access ladder; removal of church bells and timber frame; Installation of 2no. equipment cabinets and 1no. meter cabinet at ground level; and associated landscaping and ancillary development.

    19 Aug 2026 Prior approval