Skip to content
PlanIndex Get alerts
Menu

Planning application

7 Dalmeny Street Leith Edinburgh EH6 8PF

Awaiting decision City of Edinburgh 25/05499/FULSTL Planning Permission STL

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Resubmission of application for change of use from residential flat to STL (sui generis).

As published by the council, reference 25/05499/FULSTL

Application record

Reference
25/05499/FULSTL
Type
Planning Permission STL
Status
Awaiting Assessment
Received
16 Oct 2025
Validated
16 Oct 2025
Ward
Leith Walk
Parish
Leith Central
Decision by
Local Delegated Decision
Postcode
EH6 8PF

Timeline

Dates from the published record

  1. 16 Oct 2025

    Received by City of Edinburgh

  2. 12 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 11 December 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of Edinburgh took a median of 38 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with City of Edinburgh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 287 Leith Walk Edinburgh EH6 8PD

    26/00123/FUL Submitted 13 Jan 2026 14m away

    Change of use from class 1A to Class 3, alterations to shop front (as amended).

    Granted Full applications Windows or glazing 19 docs
  • 6A Dalmeny Street Edinburgh EH6 8RA

    26/02261/FULSTL Submitted 26 May 2026 35m away

    83% historically approved · decision due ~23 Jul

    Change of use from a residential flat to short term let.

    Awaiting decision Full applications 6 docs
  • 6 Jameson Place Edinburgh EH6 8PB

    23/03468/TCO Submitted 3 Aug 2023 47m away

    T1 early mature Sycamore - remove two low stubs & 1 branch (lowest) that extends over garden ground. T2 young Sycamore - to be completely removed with stump cut low and treated.

    Decided Trees 6 docs
  • 3F1 1 Balfour Street Edinburgh EH6 5BY

    36/00001/FUL Submitted 3 May 2017 59m away

    83% historically approved · decision due ~28 Jun

    tewst

    Awaiting decision Full applications
  • 1F1 21 Dalmeny Street Leith Edinburgh EH6 8PG

    26/0255/TCO Submitted 9 Apr 2026 60m away

    T1 Elm sectional fell to ground level.

    Decided Trees 3 docs
  • 3F2 313 Leith Walk Edinburgh EH6 8SA

    25/06150/WINPA Submitted 21 Nov 2025 63m away

    97% historically approved · decision due ~19 Jan

    The proposal includes UPVC windows for both the front and rear elevations. The front elevation windows are to be 1 over 1, divided in the middle, with a fixed bottom panel and a tilt-and-turn upper panel. The proposed rear window will be similar, but with the bottom fixed panel up to 1100mm above the floor, instead of being divided in the middle height.

    Awaiting decision Prior approval Windows or glazing 7 docs

In City of Edinburgh

  • 26/03535/FUL Awaiting decision

    33 Briggers Wynd South Queensferry EH30 9DS

    Erect garden room ancillary to main dwelling.

    1 Sep 2026 Full applications
  • 26/03515/FULSTL Awaiting decision

    Flat 1 2 King's Stables Road Edinburgh EH1 2JY

    Change of use of residential dwelling to a short-term let (in retrospect).

    31 Aug 2026 Full applications
  • 26/03522/FUL Awaiting decision

    10 Esplanade Terrace Edinburgh EH15 2ES

    Proposed alterations to an existing dwelling including; removal of existing conservatory. proposed singles to the extension to rear of building. replacement of existing garage door and access to from access road.

    31 Aug 2026 Full applications
  • 26/03516/FUL Awaiting decision

    Flat 1 67 Lochend Drive Edinburgh EH7 6DH

    Cut-down existing window to form new door opening and step construction.

    31 Aug 2026 Full applications
  • 26/03510/FULSTL Awaiting decision

    3F5 168 Albert Street Edinburgh EH7 5NA

    Retrospective change of use from residential dwelling to short-term let accommodation for up to 3 guests, with no structural alterations to the property.

    31 Aug 2026 Full applications