Skip to content
PlanIndex Get alerts
Menu

Planning application

60 Constitution Street South Leith Edinburgh EH6 6RR

Awaiting decision City of Edinburgh 25/05444/FUL Planning Permission

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Change of Use from Offices to Residential with alterations to basement in main office building (No. 60) to form new 1 bedroom dwelling. Alterations to 2 storey outshoot office building (60A) in courtyard to form new 2 bedroom dwelling.

As published by the council, reference 25/05444/FUL

Application record

Reference
25/05444/FUL
Type
Planning Permission
Status
Awaiting Assessment
Received
13 Oct 2025
Validated
17 Oct 2025
Ward
Leith
Parish
Leith Harbour + Newhaven
Decision by
Delegated Decision
Postcode
EH6 6RR

Timeline

Dates from the published record

  1. 13 Oct 2025

    Received by City of Edinburgh

  2. 17 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 12 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 12 December 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of Edinburgh took a median of 38 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with City of Edinburgh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 60 Constitution Street South Leith Edinburgh EH6 6RR

    26/00238/LBC Submitted 21 Jan 2026 1m away

    Alterations internally to basement of main building (No. 60) to form new dwelling. Alterations to outshoot (No. 60A) in courtyard to form new dwelling. External alterations at rear of building within courtyard.

    Granted Heritage and listed buildings New dwelling 9 docs
    Domestic
  • 60 Constitution Street Edinburgh EH6 6RR

    25/05445/LBC Submitted 13 Oct 2025 1m away

    89% historically approved · decision due ~23 Dec

    Alterations internally to basement of main building (no. 60) to form new dwelling. Alterations to outshoot (No. 60A) in courtyard to form new dwelling. External alterations at rear of building within courtyard.

    Awaiting decision Heritage and listed buildings New dwelling 9 docs
    Domestic
  • 60 Constitution Street Edinburgh EH6 6RR

    26/01724/FULSTL Submitted 22 Apr 2026 5m away

    83% historically approved · decision due ~19 Jun

    Change of use for part of the basement and an outshoot of an existing office building to form 1 No. studio apartment and 1 No. 2 bed apartment for short term let purposes.

    Awaiting decision Full applications 8 docs
  • 60 Constitution Street South Leith Edinburgh EH6 6RR

    26/00233/FUL Submitted 21 Jan 2026 6m away

    83% historically approved · decision due ~19 Mar

    Change of use from offices to residential with alterations to basement in main office building (No. 60) to form a new studio flat. Alterations to 2 storey outshoot office building (No. 60A) in courtyard to form new 2 bedroom dwelling.

    Awaiting decision Full applications 11 docs
    Domestic
  • 13 - 14 Maritime Lane Edinburgh EH6 6RZ

    26/02019/FUL Submitted 11 May 2026 21m away

    83% historically approved · decision due ~15 Jul

    Change of use from temporary storage to private recording studio class 4 with extension.

    Awaiting decision Full applications Extension 12 docs
  • 1F2 68 Constitution Street Edinburgh EH6 6RR

    26/03418/LBC Submitted 21 Aug 2026 26m away

    89% historically approved · decision due ~20 Oct

    Repair and reinstatement works.

    Awaiting decision Heritage and listed buildings 6 docs

In City of Edinburgh

  • 26/03535/FUL Awaiting decision

    33 Briggers Wynd South Queensferry EH30 9DS

    Erect garden room ancillary to main dwelling.

    1 Sep 2026 Full applications
  • 26/03515/FULSTL Awaiting decision

    Flat 1 2 King's Stables Road Edinburgh EH1 2JY

    Change of use of residential dwelling to a short-term let (in retrospect).

    31 Aug 2026 Full applications
  • 26/03522/FUL Awaiting decision

    10 Esplanade Terrace Edinburgh EH15 2ES

    Proposed alterations to an existing dwelling including; removal of existing conservatory. proposed singles to the extension to rear of building. replacement of existing garage door and access to from access road.

    31 Aug 2026 Full applications
  • 26/03516/FUL Awaiting decision

    Flat 1 67 Lochend Drive Edinburgh EH7 6DH

    Cut-down existing window to form new door opening and step construction.

    31 Aug 2026 Full applications
  • 26/03510/FULSTL Awaiting decision

    3F5 168 Albert Street Edinburgh EH7 5NA

    Retrospective change of use from residential dwelling to short-term let accommodation for up to 3 guests, with no structural alterations to the property.

    31 Aug 2026 Full applications