Planning application
11 Melville Crescent Edinburgh EH3 7LU
Works: Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Minor repairing / refurbishing of front / rear elevations, including cast iron railings / windows / external metal ramp. Installation of new CCTV cameras/new video phone intercom system to front / rear elevations. Installation of 2 No. new louvres at top sections of lower ground floor windows in front elevation. Replacement of lower ground floor window cills / external door in front elevation. Installation of 2 No. new wall mounted EV charging units in rear of buildings stone wall. Replacement of floor standing condensing units to new at rear of building. Installation of new louvre on rear ground floor stone wall and rear first floor stone wall. Installation of new extract fan to existing sash window on first floor kitchen area and third floor kitchen area. Replacement of existing extract fan on third floor cleaner store area. Installation of new anti slip tread to external ramp.
As published by the council, reference 25/05244/FUL
Application record
- Reference
- 25/05244/FUL
- Type
- Planning Permission
- Status
- Awaiting Assessment
- Received
- 2 Oct 2025
- Validated
- 14 Oct 2025
- Ward
- City Centre
- Parish
- West End
- Decision by
- Delegated Decision
- Postcode
- EH3 7LU
Timeline
Dates from the published record
-
2 Oct 2025
Received by City of Edinburgh
-
14 Oct 2025
Validated
Checked as complete and ready for consideration.
-
12 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 9 December 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
City of Edinburgh took a median of 38 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
32 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with City of Edinburgh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
11 Melville Crescent Edinburgh EH3 7LU
89% historically approved · decision due ~9 Dec
Refurbishing / altering interior of building ensuring all changes respect its historic character. Externally carrying out repairs / refurbishment to the elevation including conservation led restoration of architectural features. As part of works, also replacing existing AC condenser units with modern, energy efficient models and installing 2 new electric vehicle (EV) charging points.
Awaiting decision Heritage and listed buildings 79 docs -
-
12 Walker Street New Town Edinburgh EH3 7LP
Attach a small junction box to the rear of the property. Run a fibre cable to the junction box from a nearby pole. Run a cable from the junction box round the side of the house and drill a hole to accommodate the cable for internal connections.
Decided Heritage and listed buildings 6 docs -
BF 17 Walker Street Edinburgh EH3 7NE
89% historically approved · decision due ~14 Jul
Reinstate in natural sandstone the garden wall where access opening has been formed.
Awaiting decision Heritage and listed buildings 4 docs -
Flat 1 37B William Street New Town Edinburgh EH3 7LW
77% historically approved · decision due ~5 Nov
Short term let (sui generis).
Awaiting decision Lawful development 5 docs -
15A Walker Street Edinburgh EH3 7NE
89% historically approved · decision due ~22 Oct
Remove part of an internal wall to create a larger dining/living space and to create a slapping to a rear storage room.
Awaiting decision Heritage and listed buildings 8 docs
Other full applications applications
In City of Edinburgh
-
26/03535/FUL Awaiting decision
33 Briggers Wynd South Queensferry EH30 9DS
Erect garden room ancillary to main dwelling.
-
26/03515/FULSTL Awaiting decision
Flat 1 2 King's Stables Road Edinburgh EH1 2JY
Change of use of residential dwelling to a short-term let (in retrospect).
-
26/03522/FUL Awaiting decision
10 Esplanade Terrace Edinburgh EH15 2ES
Proposed alterations to an existing dwelling including; removal of existing conservatory. proposed singles to the extension to rear of building. replacement of existing garage door and access to from access road.
-
26/03516/FUL Awaiting decision
Flat 1 67 Lochend Drive Edinburgh EH7 6DH
Cut-down existing window to form new door opening and step construction.
-
26/03510/FULSTL Awaiting decision
3F5 168 Albert Street Edinburgh EH7 5NA
Retrospective change of use from residential dwelling to short-term let accommodation for up to 3 guests, with no structural alterations to the property.