Skip to content
PlanIndex Get alerts
Menu

Planning application

5 Baberton Mains Wynd Edinburgh EH14 3EE

Awaiting decision City of Edinburgh 25/04593/FUL Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erect single storey pitched roof extensions to side and rear of dwellinghouse.

As published by the council, reference 25/04593/FUL

Application record

Reference
25/04593/FUL
Type
Planning Permission
Status
Awaiting Assessment
Received
4 Sep 2025
Validated
4 Sep 2025
Ward
Pentland Hills
Parish
Juniper Green + Baberton Mains
Decision by
Local Delegated Decision
Postcode
EH14 3EE

Timeline

Dates from the published record

  1. 4 Sep 2025

    Received by City of Edinburgh

  2. 12 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 30 October 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of Edinburgh took a median of 38 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with City of Edinburgh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 165 Baberton Mains Drive Edinburgh EH14 3EF

    19/05045/FUL Submitted 22 Oct 2019 67m away

    Construction of 1 and 2 storey extensions and internal alterations, (as amended).

    Granted Full applications Extension 6 docs
  • Flat 1 50 Baberton Avenue Baberton Park Juniper Green EH14 5DU

    26/0568/TCO Submitted 16 Jul 2026 148m away

    94% historically approved · decision due ~11 Sep

    Trees 584,585,586,587,588,589,590, 581,580,575,572,571 and 583 - Crown Reduction.

    Awaiting decision Trees 7 docs
  • 35 Baberton Mains Avenue Baberton Mains Edinburgh EH14 3EQ

    26/02808/FUL Submitted 3 Jul 2026 168m away

    83% historically approved · decision due ~28 Aug

    Reconstruction of semi detached house which was demolished because of damage sustained from explosion of neighbouring property.

    Awaiting decision Full applications New dwelling Demolition 7 docs
  • 37 Baberton Mains Avenue Edinburgh EH14 3EQ

    26/02417/FUL Submitted 8 Jun 2026 169m away

    83% historically approved · decision due ~3 Aug

    New build semi-detached to replace existing demolished semi-detached house due to explosion damage.

    Awaiting decision Full applications New dwelling Demolition 7 docs
  • Flat 1 50 Baberton Avenue Juniper Green EH14 5DU

    26/0394/TCO Submitted 27 May 2026 181m away

    94% historically approved · decision due ~23 Jul

    12ft Unidentified Tree - Fell the 12ft unidentified tree, cutting as low to ground level as possible and inserting eco plugs., 40ft Common Lime Tree - Remove the basal epicormic growth on the Lime tree, up to a height of approximately 20 - 25 feet, 20ft Silver Birch - Remove the Ivy from the Silver Birch tree, cutting as low to ground level as possible

    Awaiting decision Trees 5 docs
  • 6 Juniper Park Road Juniper Green EH14 5DX

    26/0440/TCO Submitted 11 Jun 2026 188m away

    94% historically approved · decision due ~6 Aug

    Birch tree, lime tree cut back birch tree by 1.5m and reduce the crown of lime tree by 1.5 to 2m.

    Awaiting decision Trees 4 docs

In City of Edinburgh

  • 26/03535/FUL Awaiting decision

    33 Briggers Wynd South Queensferry EH30 9DS

    Erect garden room ancillary to main dwelling.

    1 Sep 2026 Full applications
  • 26/03515/FULSTL Awaiting decision

    Flat 1 2 King's Stables Road Edinburgh EH1 2JY

    Change of use of residential dwelling to a short-term let (in retrospect).

    31 Aug 2026 Full applications
  • 26/03522/FUL Awaiting decision

    10 Esplanade Terrace Edinburgh EH15 2ES

    Proposed alterations to an existing dwelling including; removal of existing conservatory. proposed singles to the extension to rear of building. replacement of existing garage door and access to from access road.

    31 Aug 2026 Full applications
  • 26/03516/FUL Awaiting decision

    Flat 1 67 Lochend Drive Edinburgh EH7 6DH

    Cut-down existing window to form new door opening and step construction.

    31 Aug 2026 Full applications
  • 26/03510/FULSTL Awaiting decision

    3F5 168 Albert Street Edinburgh EH7 5NA

    Retrospective change of use from residential dwelling to short-term let accommodation for up to 3 guests, with no structural alterations to the property.

    31 Aug 2026 Full applications