Skip to content
PlanIndex Get alerts
Menu

Planning application

2C Church Hill Edinburgh EH10 4BQ

Awaiting decision City of Edinburgh 25/04426/FUL Planning Permission

Works: New dwelling Extension Demolition Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Demolition off existing dilapidated conservatory and construction of new extension. Sundry internal alterations of existing detached house and replacement of existing window units.

As published by the council, reference 25/04426/FUL

Application record

Reference
25/04426/FUL
Type
Planning Permission
Status
Awaiting Assessment
Received
27 Aug 2025
Validated
28 Aug 2025
Ward
Morningside
Parish
Merchiston
Decision by
Local Delegated Decision
Postcode
EH10 4BQ

Timeline

Dates from the published record

  1. 27 Aug 2025

    Received by City of Edinburgh

  2. 28 Aug 2025

    Validated

    Checked as complete and ready for consideration.

  3. 12 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 23 October 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of Edinburgh took a median of 38 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with City of Edinburgh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 17 Church Hill Place Morningside Edinburgh EH10 4BE

    25/06091/ADV Submitted 19 Nov 2025 44m away

    92% historically approved · decision due ~14 Jan

    Advertisement of the following types : Box Sign, Projecting Sign.

    Awaiting decision Advertising 5 docs
  • 2F1 59 Morningside Road Edinburgh EH10 4AZ

    26/03468/WINPA Submitted 26 Aug 2026 52m away

    97% historically approved · decision due ~26 Oct

    The window frame will not be altered. The timber sash and case will be replaced with a uPVC sash and case.

    Awaiting decision Prior approval Windows or glazing 3 docs
  • Flat 5 4B Church Hill Edinburgh EH10 4BQ

    21/05558/FUL Submitted 20 Oct 2021 55m away

    Change existing timber double glazed windows to new rosewood (dark brown) uPVC double glazed windows.

    Granted Full applications Windows or glazing 6 docs
  • Flat 8 4B Church Hill Edinburgh EH10 4BQ

    23/02441/FUL Submitted 6 Jun 2023 63m away

    Remove existing timber windows and install new dark brown rosewood uPVC windows.

    Granted Full applications Windows or glazing 7 docs
  • 67 Morningside Road Edinburgh EH10 4AZ

    26/0591/TCO Submitted 24 Jul 2026 69m away

    94% historically approved · decision due ~21 Sep

    T1 Spruce crown lift to 5m.

    Awaiting decision Trees 4 docs
  • Flat 3 4B Church Hill Edinburgh EH10 4BQ

    21/05559/FUL Submitted 20 Oct 2021 69m away

    Remove existing timber double windows and door and install new rosewood (dark brown) uPVC windows and door.

    Granted Full applications Windows or glazing 6 docs

In City of Edinburgh

  • 26/03535/FUL Awaiting decision

    33 Briggers Wynd South Queensferry EH30 9DS

    Erect garden room ancillary to main dwelling.

    1 Sep 2026 Full applications
  • 26/03515/FULSTL Awaiting decision

    Flat 1 2 King's Stables Road Edinburgh EH1 2JY

    Change of use of residential dwelling to a short-term let (in retrospect).

    31 Aug 2026 Full applications
  • 26/03522/FUL Awaiting decision

    10 Esplanade Terrace Edinburgh EH15 2ES

    Proposed alterations to an existing dwelling including; removal of existing conservatory. proposed singles to the extension to rear of building. replacement of existing garage door and access to from access road.

    31 Aug 2026 Full applications
  • 26/03516/FUL Awaiting decision

    Flat 1 67 Lochend Drive Edinburgh EH7 6DH

    Cut-down existing window to form new door opening and step construction.

    31 Aug 2026 Full applications
  • 26/03510/FULSTL Awaiting decision

    3F5 168 Albert Street Edinburgh EH7 5NA

    Retrospective change of use from residential dwelling to short-term let accommodation for up to 3 guests, with no structural alterations to the property.

    31 Aug 2026 Full applications