Skip to content
PlanIndex Get alerts
Menu

Planning application

Proposed Telecoms Apparatus 6 Metres North Of 2 Bath Road Edinburgh

Granted City of Edinburgh 21/04642/PA Prior Approval

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed 15m high phase 8 street pole on new root foundation and ancillary cabinets.

As published by the council, reference 21/04642/PA

Application record

Reference
21/04642/PA
Type
Prior Approval
Status
Application Approved
Decision
Approved
Received
3 Sep 2021
Validated
3 Sep 2021
Decided
9 Dec 2021
Ward
Leith
Parish
Leith Harbour And Newhaven
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 3 Sep 2021

    Received by City of Edinburgh

  2. 9 Dec 2021

    Decision issued: Approved

  3. 18 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About prior approval applications

How this application type works

Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.

More on prior approval applications in our guide

Nearby applications

Within 500 metres

  • 2 Bath Road Edinburgh EH6 7JT

    26/01831/FUL Submitted 29 Apr 2026 10m away

    83% historically approved · decision due ~7 Jul

    New build development comprising 3 No. residential flats and ground floor extension to public house.

    Awaiting decision Full applications New dwelling Extension 27 docs
  • 11 Salamander Street Edinburgh EH6 7HZ

    25/06318/FULSTL Submitted 2 Dec 2025 25m away

    Retrospective change of use from class 4 (business) to sui generis for short term let property.

    Refused Full applications 11 docs
  • 1 Bath Road South Leith Edinburgh EH6 7BB

    20/01313/VAR5 Submitted 30 Jan 2026 57m away

    86% historically approved · decision due ~6 Apr

    Non-Material Variation - Changes to the parking layout between the two flat blocks.

    Awaiting decision Conditions 3 docs
    Several homes
  • Land 50 Metres North Of 2 Bath Road Edinburgh

    25/04894/FUL Submitted 15 Sep 2025 68m away

    Proposed development of motor vehicle hire facility (Sui Generis) including erection of office, valet bay, plant room and associated infrastructure, external lighting, boundary treatments, parking, new vehicular access and relocation of existing bollards.

    Granted Full applications 15 docs
  • 52 - 66 Salamander Street South Leith Edinburgh EH6 7LA

    25/05968/PAN Submitted 11 Nov 2025 84m away

    86% historically approved · decision due ~6 Jan

    Proposed mixed use development comprising, residential (build to rent), purpose built student accommodation, retail/commercial space and associated works.

    Awaiting decision 3 docs
  • Land 53 Metres East Of 55 Tower Street Edinburgh

    24/01798/VARY Submitted 10 Mar 2026 96m away

    Non-material variation application to 24/01798/FUL. Changes to flat type 7A and 7B in stair 6. Corresponding amendments to the elevations alongside updates to the windows and render as described on the elevation drawings.

    Decided Conditions Windows or glazing 11 docs

In City of Edinburgh

  • 26/03429/WINPA Granted

    28 Mayfield Gardens Edinburgh EH9 2BZ

    Replacement of timber sash and case style window for new PVCu double glazed sliding sash window.

    21 Aug 2026 Prior approval
  • 26/03468/WINPA Awaiting decision

    2F1 59 Morningside Road Edinburgh EH10 4AZ

    The window frame will not be altered. The timber sash and case will be replaced with a uPVC sash and case.

    26 Aug 2026 Prior approval
  • 26/03426/WINPA Granted

    1F2 110 Comiston Road Edinburgh EH10 5QL

    I bought Flat 4 110 Comiston Road on 10th July 2026 and I am notifying you and ask for prior approval that I will reinstate the original wooden sash window design throughout the property and replace the current UPVC windows at the property. The current windows open fully (swing) and are not the original opening method as should be in sash windows. I have a quote from "Edinburgh Sash and Case Company", and have already paid for the initial work of making the windows from scratch. The windows are due to be installed with great care and attention to detail in the middle of September 2026.

    21 Aug 2026 Prior approval
  • 26/03427/WINPA Awaiting decision

    24 Blackford Avenue Edinburgh EH9 2PH

    Replacement of aluminium sliding sash and case style windows for new pVCU double glazed sliding sash windows.

    21 Aug 2026 Prior approval
  • 26/03380/PNTEL Awaiting decision

    Leith St Andrews Hall 410 Easter Road Edinburgh EH6 8HT

    Proposed shared telecommunications base station comprising the installation of 8no. antennas within bell tower on support poles mounted to new grillage flooring over existing steel beams; installation of 12no. ERS mounted internally to bell tower wall and 24no. ERS on antenna support poles; replacement of existing louvres with Glass Reinforced Plastic Louvres; replacement of timber staircase on third floor of bell tower with access ladder; removal of church bells and timber frame; Installation of 2no. equipment cabinets and 1no. meter cabinet at ground level; and associated landscaping and ancillary development.

    19 Aug 2026 Prior approval