Planning application
Edinburgh Castle 362 Castlehill Edinburgh EH1 2NG
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
NANCY - test for SCOping type application
As published by the council, reference 16/05994/SCO
Application record
- Reference
- 16/05994/SCO
- Type
- EIA Scoping
- Status
- Awaiting Assessment
- Received
- 7 Dec 2016
- Validated
- 7 Dec 2016
- Ward
- No Ward Number
- Parish
- Old Town
- Postcode
- EH1 2NG
Site history
Applications at this address on the City of Edinburgh register
This site has had 6 applications since 2011.
-
26/00139/FUL Withdrawn
Edinburgh Castle 362 Castlehill Edinburgh EH1 2NG
Replacement of existing performer accommodation units with like-for-like units of the same size and number to align with retained temporary steelwork, including change of external finish from sage green to navy blue (RAL 5003 'Sargasso Blue') to match existing accommodation beneath the grandstand.
-
21/05782/FUL Decided
Edinburgh Castle 362 Castlehill Edinburgh EH1 2NG
Solar Photovoltaic (PV) panels are proposed to be installed on the flat roof area of the Scottish National War Memorial.
-
16/02291/PPP Withdrawn
Edinburgh Castle 362 Castlehill Edinburgh EH1 2NG
To erect a 3x3m hot food tent within the walls of Edinburgh Castle. This structure has been in situ for previous 3 years with the permission of Historic Environment Scotland. We are the sole contract caterers within this site. Planning permission now required as HES are no longer under crown endemnity and structure will be in place longer than 28 days.
-
11/03564/ADV Withdrawn
Edinburgh Castle 362 Castlehill Edinburgh EH1 2NG
Paralympic logo comprising 3 aluminium agitos and supporting steel structure
-
11/03565/ADV Withdrawn
Edinburgh Castle 362 Castlehill Edinburgh EH1 2NG
Olympic logo comprising 5 aluminium rings and supporting steel structure
Timeline
Dates from the published record
-
7 Dec 2016
Received by City of Edinburgh
-
6 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 1 February 2017, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
City of Edinburgh took a median of 38 days over the applications it decided in the last year.
What happens while it is decided
This application is with City of Edinburgh for determination, against a statutory target of eight weeks. Over the last year City of Edinburgh's median decision took 38 days. More in our guide to how long planning decisions take.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Edinburgh Castle 362 Castlehill Edinburgh EH1 2NG
To erect a 3x3m hot food tent within the walls of Edinburgh Castle. This structure has been in situ for previous 3 years with the permission of Historic Environment Scotland. We are the sole contract caterers within this site. Planning permission now required as HES are no longer under crown endemnity and structure will be in place longer than 28 days.
Withdrawn Outline -
Edinburgh Castle 362 Castlehill Edinburgh EH1 2NG
Paralympic logo comprising 3 aluminium agitos and supporting steel structure
Withdrawn Advertising 17 docs -
Edinburgh Castle 362 Castlehill Edinburgh EH1 2NG
Olympic logo comprising 5 aluminium rings and supporting steel structure
Withdrawn Advertising 17 docs -
West Princes Street Gardens Princes Street Edinburgh
Demolition of the existing Ross Theatre and removal of associated terraced viewing area and their replacement with a new event pavilion building and amphitheatre. Creation of a Welcome Centre comprising: café (Class 3), event spaces and associated facilities. Creation of a new Family Area comprising an upgraded play area, event space, café (Class 3) and toilets. Introduction of a new footpath network, landscape works and replacement and enhancement of the existing pedestrian and service bridges. A new access road from Kings Stables Road to service West Princes Street Gardens and all associated development.
Granted Demolition 4 docs -
Edinburgh Castle 362 Castlehill Edinburgh EH1 2NG
Solar Photovoltaic (PV) panels are proposed to be installed on the flat roof area of the Scottish National War Memorial.
Decided Full applications 15 docs -
Land 12M East Of Ross Fountain Princes Street Edinburgh
Erect a statue to The Royal Regiment of Scotland.
Granted Full applications 20 docs
Other outline applications
In City of Edinburgh
-
26/02789/SCR Awaiting decision
11 Portgower Place Edinburgh
EIA Screening Opinion record.
-
26/00056/SCR Awaiting decision
Land 90 Metres East Of 1A Riverside Cramond Edinburgh
EIA screening request.
-
26/02961/SCR Awaiting decision
Fairmilehead Water Treatment Works 55 Buckstone Terrace Buckstone Edinburgh EH10 6XH
EIA Screening request.
-
26/02900/PPP Awaiting decision
Fairmilehead Water Treatment Works 55 Buckstone Terrace Buckstone Edinburgh EH10 6XH
Planning permission in principle for demolition of all existing buildings and the erection of a residential (Class 9/Sui-Generis) development and other associated works and infrastructure including car parking, servicing, access arrangements and landscaping.
-
26/02715/SCO Awaiting decision
Land South 240 Metres South East Of 9 Little France Road Edinburgh
EIA scoping request - proposed life science and ancillary retail / leisure / food & drink uses, mixed commercial and residential development, hotel, purpose built student accommodation and associated access, landscaping and infrastructure works (abridged).