Planning application
Land South Of 127 Rawlinson Lane Heath Charnock
Works: Demolition Domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of one dwelling following demolition of existing buildings and creation of new access from Rawlinson Lane
As published by the council, reference 26/00685/FUL
Application record
- Reference
- 26/00685/FUL
- Category
- Full applications
- Status
- Awaiting decision
- Received
- 3 Aug 2026
- Validated
- 6 Aug 2026
- Ward
- Chorley South East And Heath Charnock
- Parish
- Heath Charnock
Timeline
Dates from the published record
-
3 Aug 2026
Received by Chorley
-
6 Aug 2026
Validated
Checked as complete and ready for consideration.
-
11 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 1 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Chorley took a median of 74 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
26 documents on file for this application
- COAL AUTHORITY COMMENTS
- LCC HIGHWAYS COMMENTS
- UNITED UTILITIES COMMENTS
- ACKNOWLEDGEMENT LETTER
- NEIGHBOUR LETTER - INITIAL CONSULTATION
- CONSULTATION LETTER
- CONSULTATION LETTER
- CONSULTATION LETTER
- CONSULTATION LETTER
- CONSULTATION LETTER
- CONSULTATION LETTER
- CONSULTATION LETTER
- SITE NOTICE - PLANNING APPLICATIONS
- CIL OFFICERS
- APPLICATION FORM
- LOCATION PLAN
- PROPOSED SITE AND FLOORPLAN
- PROPOSED ELEVATIONS
- BNG SELF-BUILD EXEMPTION STATEMENT SIGNED
- PLANNING STATEMENT
- DESIGN AND ACCESS STATEMENT
- DRAINAGE STATEMENT
- ARBORICULTURAL IMPACT ASSESSMENT
- ARBORICULTURAL METHOD STATEMENT
- COAL MINING RISK ASSESSMENT
- PRELIMINARY ECOLOGICAL APPRAISAL
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Chorley for determination, against a statutory target of eight weeks. Over the last year Chorley decided full applications in a median of 114 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Chorley
-
26/00793/FUL Awaiting decision
Woodview Bungalow Wood Lane Mawdesley Ormskirk L40 2RL
Erection of private stable block for two horses and one tack room
-
26/00778/FUL Awaiting decision
405 Preston Road Clayton-le-woods Chorley PR6 7JA
Section 73 application to vary condition no. 2 (the approved plans) of application 24/00272/FULHH (Two storey side/rear extension to northern and western elevation and single storey side extension to southern elevation) to increase the scale of the two storey element and to amend the design of the overall proposal.
-
26/00776/FUL Awaiting decision
The Glen Gib Lane Hoghton Preston PR5 0RU
Section 73 application to vary condition no. 2 (the approved plans) of application 26/00202/FULHH (First floor extension over existing, detached garage) to amend the elevations and increase the roof ridge height
-
26/00769/FUL Awaiting decision
1-3 Clifford Street Chorley PR7 1AQ
Change of use of numbers 1 to 3 Clifford Street across the first and second floors to 2no. one bedroom apartments (Use Class C3) and the replacement of window frames and doors
-
26/00764/FUL Awaiting decision
Boardman Heights Farm Bury Lane Withnell Chorley PR6 8SD
Change of use and conversion of an existing agricultural building to a farm shop