Skip to content
PlanIndex Get alerts
Menu

Planning application

Land South Of 127 Rawlinson Lane Heath Charnock

Awaiting decision Chorley 26/00685/FUL Full applications

Works: Demolition Domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of one dwelling following demolition of existing buildings and creation of new access from Rawlinson Lane

As published by the council, reference 26/00685/FUL

Application record

Reference
26/00685/FUL
Category
Full applications
Status
Awaiting decision
Received
3 Aug 2026
Validated
6 Aug 2026
Ward
Chorley South East And Heath Charnock
Parish
Heath Charnock

Timeline

Dates from the published record

  1. 3 Aug 2026

    Received by Chorley

  2. 6 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 11 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 1 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Chorley took a median of 74 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

26 documents on file for this application

  • COAL AUTHORITY COMMENTS Consultee Comment · 19 Aug 2026
  • LCC HIGHWAYS COMMENTS Consultee Comment · 17 Aug 2026
  • UNITED UTILITIES COMMENTS Consultee Comment · 07 Aug 2026
  • ACKNOWLEDGEMENT LETTER Correspondence · 06 Aug 2026
  • NEIGHBOUR LETTER - INITIAL CONSULTATION Correspondence · 06 Aug 2026
  • CONSULTATION LETTER Correspondence · 06 Aug 2026
  • CONSULTATION LETTER Correspondence · 06 Aug 2026
  • CONSULTATION LETTER Correspondence · 06 Aug 2026
  • CONSULTATION LETTER Correspondence · 06 Aug 2026
  • CONSULTATION LETTER Correspondence · 06 Aug 2026
  • CONSULTATION LETTER Correspondence · 06 Aug 2026
  • CONSULTATION LETTER Correspondence · 06 Aug 2026
  • SITE NOTICE - PLANNING APPLICATIONS Correspondence · 06 Aug 2026
  • CIL OFFICERS Consultee Comment · 06 Aug 2026
  • APPLICATION FORM Planning Application (inc initial correspondence) · 03 Aug 2026
  • LOCATION PLAN Site Location Plan · 03 Aug 2026
  • PROPOSED SITE AND FLOORPLAN Site Location Plan · 03 Aug 2026
  • PROPOSED ELEVATIONS Site Elevations, Building Plans etc. · 03 Aug 2026
  • BNG SELF-BUILD EXEMPTION STATEMENT SIGNED Report · 03 Aug 2026
  • PLANNING STATEMENT Report · 03 Aug 2026
  • DESIGN AND ACCESS STATEMENT Report · 03 Aug 2026
  • DRAINAGE STATEMENT Report · 03 Aug 2026
  • ARBORICULTURAL IMPACT ASSESSMENT Report · 03 Aug 2026
  • ARBORICULTURAL METHOD STATEMENT Report · 03 Aug 2026
  • COAL MINING RISK ASSESSMENT Report · 03 Aug 2026
  • PRELIMINARY ECOLOGICAL APPRAISAL Report · 03 Aug 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Chorley for determination, against a statutory target of eight weeks. Over the last year Chorley decided full applications in a median of 114 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Chorley

  • 26/00793/FUL Awaiting decision

    Woodview Bungalow Wood Lane Mawdesley Ormskirk L40 2RL

    Erection of private stable block for two horses and one tack room

    7 Sep 2026 Full applications
  • 26/00778/FUL Awaiting decision

    405 Preston Road Clayton-le-woods Chorley PR6 7JA

    Section 73 application to vary condition no. 2 (the approved plans) of application 24/00272/FULHH (Two storey side/rear extension to northern and western elevation and single storey side extension to southern elevation) to increase the scale of the two storey element and to amend the design of the overall proposal.

    1 Sep 2026 Full applications
  • 26/00776/FUL Awaiting decision

    The Glen Gib Lane Hoghton Preston PR5 0RU

    Section 73 application to vary condition no. 2 (the approved plans) of application 26/00202/FULHH (First floor extension over existing, detached garage) to amend the elevations and increase the roof ridge height

    28 Aug 2026 Full applications
  • 26/00769/FUL Awaiting decision

    1-3 Clifford Street Chorley PR7 1AQ

    Change of use of numbers 1 to 3 Clifford Street across the first and second floors to 2no. one bedroom apartments (Use Class C3) and the replacement of window frames and doors

    28 Aug 2026 Full applications
  • 26/00764/FUL Awaiting decision

    Boardman Heights Farm Bury Lane Withnell Chorley PR6 8SD

    Change of use and conversion of an existing agricultural building to a farm shop

    27 Aug 2026 Full applications