Planning application

Land Located South Of Bank Bridge Tarleton

Awaiting decision Chorley 25/01256/FULMAJ Major Full Planning

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Construction of power generation facilities comprising a single wind turbine (4.2MW), solar photovoltaic array (12MW), and battery energy storage system (BESS) (5MWH) providing a combined renewable energy resource of 21.2 MW, with associated transmission Infrastructure including energy supply / cable routes to Bretherton village and Plocks Farm and erection of a battery storage building in Bretherton village

As published by the council, reference 25/01256/FULMAJ

Application record

Reference
25/01256/FULMAJ
Type
Major Full Planning
Status
Awaiting decision
Received
24 Dec 2025
Validated
14 Jan 2026
Ward
Croston, Mawdesley And Euxton South
Parish
Bretherton

Timeline

Dates from the published record

  1. 24 Dec 2025

    Received by Chorley

  2. 14 Jan 2026

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 15 April 2026, 13 weeks from validation under the statutory target. Extensions of time are common and are agreed case by case.

    Chorley took a median of 62 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Application: 25/00372/SCE (Other decision)

Who's behind it

Company information only, from the register and Companies House

BCA Landscape Agent, registered in Liverpool

Active · incorporated 2017 · Liverpool

7 applications on PlanIndex · across 2 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

200 documents on file for this application

  • CONSULTATION LETTER Correspondence · 04 Sep 2026
  • 25_01256_FULMAJ HIGHWAYS_TN03 (RESPONSE TO LCC HIGHWAYS) 2026.09.03 ISSUE Report · 03 Sep 2026
  • 25_01256_FULMAJ HIGHWAYS_TN02 ASLAND WALKS (RESPONSE TO BANK BRIDGE) ISSUE Report · 03 Sep 2026
  • GCN EDNA SURVEY LETTER REPORT_ISSUE Planning Application (inc initial correspondence) · 11 Aug 2026
  • ASLAND WALKS GCN EDNA SURVEY LETTER REPORT_ISSUE.PDF Planning Application (inc initial correspondence) · 11 Aug 2026
  • 2026.07.24 A.WALKS APPLIC BDY (AMND TO INCL CONSTRUCTION ACCESS). Site Location Plan · 27 Jul 2026
  • S IRWIN- MERSEYSIDE & WEST LANCASHIRE BAT GROUP Objection Comment · 22 Jul 2026
  • CONSULTATION LETTER Correspondence · 17 Jul 2026
  • ASLAND WALKS RESPONSE TO MEAS Report · 24 Jun 2026
  • ASLAND WALKS RESPONSE TO MWLBG Report · 24 Jun 2026
  • ASLAND WALKS UPDATED REPORT TO INFORM HRA_V2 Report · 24 Jun 2026
  • ASLAND WALKS ENERGY PARK TECHNICAL NOTE_ISSUE Report · 24 Jun 2026
  • 13712A - SOLAR PHOTOVOLTAIC GLINT AND GLARE STUDY V3.PDF Planning Application (inc initial correspondence) · 15 Jun 2026
  • ONLINE COMMENT Public Comment · 09 May 2026
  • MEAS- CH25-002_RESPAPP Consultee Response · 07 May 2026
  • UNITED UTILITIES Consultee Response · 29 Apr 2026
  • 13712D - SHADOW FLICKER TECHNICAL NOTE Planning Application (inc initial correspondence) · 23 Apr 2026
  • 13712D - SHADOW FLICKER TECHNICAL NOTE Report · 23 Apr 2026
  • MOD_RESPONSE Consultee Response · 22 Apr 2026
  • NATS RESPONSE 17.04.26 Consultee Response · 17 Apr 2026
  • TRANSPORT-ROUTE SURVEY REPORT 784-B069995 NOV 2025 Report · 13 Apr 2026
  • ONLINE COMMENT Public Comment · 10 Apr 2026
  • GROWTH LANCS Consultee Comment · 08 Apr 2026
  • ONLINE COMMENT Public Comment · 07 Apr 2026
  • PARISH COUNCIL Consultee Response · 04 Apr 2026
  • LHA RESPONSE Consultee Response · 30 Mar 2026
  • ANNEX 1_MORPH RIVER TYPE PRO MAP DATA Planning Application (inc initial correspondence) · 27 Mar 2026
  • ONLINE COMMENT Public Comment · 16 Mar 2026
  • ONLINE COMMENT Public Comment · 15 Mar 2026
  • ONLINE COMMENT Public Comment · 14 Mar 2026
  • ONLINE COMMENT Public Comment · 13 Mar 2026
  • ONLINE COMMENT Public Comment · 13 Mar 2026
  • 13712D1 V1 - TERRESTRIAL TELEVISION AND RADIO BASELINE RECEPTION SURVEY Planning Application (inc initial correspondence) · 11 Mar 2026
  • ENVIRONMENT AGENCY Consultee Response · 10 Mar 2026
  • ONLINE COMMENT Public Comment · 10 Mar 2026
  • ONLINE COMMENT Public Comment · 08 Mar 2026
  • ONLINE COMMENT Public Comment · 06 Mar 2026
  • HERITAGE - HISTORIC ENVIRONMENT TECHNICAL NOTE V1.0 25_01256_FULMAJ_ ASLAND ENER Report · 04 Mar 2026
  • HERITAGE - HISTORIC ENVIRONMENT TECHNICAL NOTE V1.0 Planning Application (inc initial correspondence) · 04 Mar 2026
  • NATURAL ENGLAND Consultee Comment · 04 Mar 2026
  • ONLINE COMMENT Public Comment · 03 Mar 2026
  • PLOCKS FARM GREEN ENERGY SITE A - WINTERING BIRD STUDY 2020-2021 Planning Application (inc initial correspondence) · 03 Mar 2026
  • PLOCKS FARM GREEN ENERGY SITE A - PRELIMINARY ECOLOGICAL APPRAISAL 09.2021 Planning Application (inc initial correspondence) · 03 Mar 2026
  • ECOLOGY-APP4 BIODIVERSITY METRIC ISSUE Planning Application (inc initial correspondence) · 03 Mar 2026
  • ONLINE COMMENT Public Comment · 02 Mar 2026
  • ONLINE COMMENT Public Comment · 02 Mar 2026
  • ONLINE COMMENT Public Comment · 02 Mar 2026
  • ONLINE COMMENT Public Comment · 02 Mar 2026
  • LFRS RESPONSE TO CONSULTATION 25_01256_FULMAJ. Consultee Response · 27 Feb 2026
  • ONLINE COMMENT Public Comment · 27 Feb 2026
  • ONLINE COMMENT Public Comment · 27 Feb 2026
  • ONLINE COMMENT Public Comment · 26 Feb 2026
  • CIL OFFICERS Consultee Response · 23 Feb 2026
  • CONSULTATION LETTER Correspondence · 23 Feb 2026
  • ONLINE COMMENT Public Comment · 21 Feb 2026
  • LIVERPOOL JOHN LENNON AIRPORT RESPONSE Consultee Response · 20 Feb 2026
  • 2022-143-019 - PLANS AND SECTIONS SHOWING ARRANGEMENTS ALONG RIVER DOUGLAS AND S Site Elevations, Building Plans etc. · 18 Feb 2026
  • ONLINE COMMENT Public Comment · 16 Feb 2026
  • CONSULTATION LETTER Correspondence · 13 Feb 2026
  • CONSULTATION LETTER Correspondence · 13 Feb 2026
  • RESPONSE TO ENERGY PARK APPLICATION SJM - PARISH COUNCIL Consultee Response · 12 Feb 2026
  • ONLINE COMMENT Public Comment · 11 Feb 2026
  • ONLINE COMMENT Public Comment · 11 Feb 2026
  • ONLINE COMMENT Public Comment · 11 Feb 2026
  • PAUL FOSTER MP Support Comment · 11 Feb 2026
  • ONLINE COMMENT Public Comment · 10 Feb 2026
  • LLFA RESPONSE.PDF Consultee Response · 09 Feb 2026
  • ONLINE COMMENT Public Comment · 09 Feb 2026
  • SHADOW FLICKER IMPACT ASSESSMENT V2 (PAGER POWER APRIL 2025).PDF Planning Application (inc initial correspondence) · 09 Feb 2026
  • ENVIRONMENT AGENCY RESPONSE Consultee Response · 09 Feb 2026
  • ONLINE COMMENT Public Comment · 09 Feb 2026
  • ONLINE COMMENT Public Comment · 09 Feb 2026
  • ONLINE COMMENT Public Comment · 08 Feb 2026
  • ONLINE COMMENT Public Comment · 07 Feb 2026
  • ONLINE COMMENT Public Comment · 06 Feb 2026
  • ONLINE COMMENT Public Comment · 06 Feb 2026
  • ONLINE COMMENT Public Comment · 06 Feb 2026
  • ONLINE COMMENT Public Comment · 06 Feb 2026
  • ONLINE COMMENT Public Comment · 06 Feb 2026
  • ONLINE COMMENT Public Comment · 06 Feb 2026
  • ONLINE COMMENT Public Comment · 06 Feb 2026
  • ONLINE COMMENT Public Comment · 05 Feb 2026
  • CANAL & RIVER TRUST Consultee Comment · 05 Feb 2026
  • ONLINE COMMENT Public Comment · 04 Feb 2026
  • ONLINE COMMENT Public Comment · 03 Feb 2026
  • ONLINE COMMENT Public Comment · 02 Feb 2026
  • ONLINE COMMENT Public Comment · 31 Jan 2026
  • ONLINE COMMENT Public Comment · 31 Jan 2026
  • ONLINE COMMENT Public Comment · 31 Jan 2026
  • ONLINE COMMENT Public Comment · 31 Jan 2026
  • NATIONAL AIR TRAFFIC SERVICES RESPONSE Consultee Response · 30 Jan 2026
  • ONLINE COMMENT Public Comment · 30 Jan 2026
  • 2022-143-015 - PROPOSED ELEVATIONS TO ELECTRICAL COMPOUND Site Elevations, Building Plans etc. · 29 Jan 2026
  • 2022-143-013F - GENERAL ARRANGEMENT AND DETAILS TO ELECTRICAL COMPOUND Site Elevations, Building Plans etc. · 29 Jan 2026
  • CANAL & RIVER TRUST Consultee Response · 28 Jan 2026
  • LCC HISTORIC ENVIRONMENT RESPONSE Consultee Response · 26 Jan 2026
  • ARQIVA RESPONSE Consultee Response · 22 Jan 2026
  • NEIGHBOUR LETTER - INITIAL CONSULTATION Correspondence · 21 Jan 2026
  • SITE NOTICE - PLANNING APPLICATIONS Correspondence · 21 Jan 2026
  • CONSULTATION LETTER Correspondence · 20 Jan 2026
  • CONSULTATION LETTER Correspondence · 20 Jan 2026
  • CONSULTATION LETTER Correspondence · 20 Jan 2026
  • CONSULTATION LETTER Correspondence · 20 Jan 2026
  • CONSULTATION LETTER Correspondence · 20 Jan 2026
  • CONSULTATION LETTER Correspondence · 20 Jan 2026
  • CONSULTATION LETTER Correspondence · 20 Jan 2026
  • CONSULTATION LETTER Correspondence · 20 Jan 2026
  • CONSULTATION LETTER Correspondence · 20 Jan 2026
  • CONSULTATION LETTER Correspondence · 20 Jan 2026
  • CONSULTATION LETTER Correspondence · 20 Jan 2026
  • CONSULTATION LETTER Correspondence · 20 Jan 2026
  • CONSULTATION LETTER Correspondence · 20 Jan 2026
  • CONSULTATION LETTER Correspondence · 20 Jan 2026
  • CONSULTATION LETTER Correspondence · 20 Jan 2026
  • CONSULTATION LETTER Correspondence · 20 Jan 2026
  • CONSULTATION LETTER Correspondence · 20 Jan 2026
  • CONSULTATION LETTER Correspondence · 20 Jan 2026
  • CONSULTATION LETTER Correspondence · 20 Jan 2026
  • NEIGHBOUR LETTER - INITIAL CONSULTATION Correspondence · 20 Jan 2026
  • CIL OFFICERS Consultee Response · 20 Jan 2026
  • ACKNOWLEDGEMENT LETTER Correspondence · 16 Jan 2026
  • ECOL APP2 ORNITHOLOGY FIG 2.13-2.18 Planning Application (inc initial correspondence) · 14 Jan 2026
  • ECOL APP2 ORNITHOLOGY FIG 2.1-2.12 Planning Application (inc initial correspondence) · 14 Jan 2026
  • ECOL APP2 ORNITHOLOGY FIG 2.25-2.28 Planning Application (inc initial correspondence) · 14 Jan 2026
  • ECOL APP2 ORNITHOLOGY FIG 2.19-2.24 Planning Application (inc initial correspondence) · 14 Jan 2026
  • 2026.01.14 (AMND) A.WALKS GREEN ENERGY PARK ? APPLIC BDY Site Location Plan · 14 Jan 2026
  • WIND TURBINE ELEVATION DETAILS Site Elevations, Building Plans etc. · 05 Jan 2026
  • PROPOSED BRETHERTON BATTERY BUILDING Site Elevations, Building Plans etc. · 05 Jan 2026
  • PROPOSED BRETHERTON BATTERY BUILDING LANDSCAPING PLAN Site Elevations, Building Plans etc. · 05 Jan 2026
  • 2022_143_013E GA AND DETAILS ELECTRICAL COMPOUND Site Elevations, Building Plans etc. · 05 Jan 2026
  • APPLICATIONFORMREDACTED Planning Application (inc initial correspondence) · 24 Dec 2025
  • 2022_143_002H FULL PROPOSED SITE LAYOUT Site Location Plan · 24 Dec 2025
  • 2022_143_011J GENERAL ARRANGEMENT TO SOLAR FARM Site Elevations, Building Plans etc. · 24 Dec 2025
  • 2022_143_012B TEMPORARY WORK ARRANGEMENTS Site Elevations, Building Plans etc. · 24 Dec 2025
  • 2022_143_013E GA AND DETAILS ELECTRICAL COMPOUND Site Elevations, Building Plans etc. · 24 Dec 2025
  • 2022_143_018A EXISTING CONTOUR PLAN Site Elevations, Building Plans etc. · 24 Dec 2025
  • 2022_143_020D HV CABLE ROUTE TO BRETHERTON Site Elevations, Building Plans etc. · 24 Dec 2025
  • 2022_143_021 GA AND DETAILS HV CABLE ROUTE RIVER AND ROAD Site Elevations, Building Plans etc. · 24 Dec 2025
  • 2022_143_022A PLAN ON HV ROUTE TO PLOCKS FARM. Site Elevations, Building Plans etc. · 24 Dec 2025
  • 2022_143_023A GA_DETAILS OF HV CABLE ROUTE BRETHERTON Site Elevations, Building Plans etc. · 24 Dec 2025
  • 22.522_BCAL_101_3 SOLAR_WIND TURBINE CONTEXT Site Elevations, Building Plans etc. · 24 Dec 2025
  • 22.522_BCAL_102_3 SOLAR_LANDSCAPE STRUCTURE. Site Elevations, Building Plans etc. · 24 Dec 2025
  • 22.522_BCAL_103_3 SOLAR_ALC Site Elevations, Building Plans etc. · 24 Dec 2025
  • 22.522_BCAL_105_3 SOLAR_SOLAR-WIND TURBINE DETAIL. Site Elevations, Building Plans etc. · 24 Dec 2025
  • AGRICULTURE-AGRICULTURAL LAND CLASSIFICATION (ADAS JULY 2020) Site Elevations, Building Plans etc. · 24 Dec 2025
  • ARBORICULTURAL IMPACT ASSESSMENT ASCERTA NOV 2025 Report · 24 Dec 2025
  • ARCHAEOLOGY YA_10577 REPORT_V2_PART1 Report · 24 Dec 2025
  • ARCHAEOLOGY YA_10577 REPORT_V2_PART2 Report · 24 Dec 2025
  • AVIATION-IFP SAFEGUARDING BLACKPOOL AIRPORT (CYRRUS DEC 2023 Report · 24 Dec 2025
  • AVIATION-RPT 72037-001 ADDENDUM WARTON ISSUE 2.1 (OSPREY MARCH 2025) Report · 24 Dec 2025
  • AVIATION-RPT 72037-001 WARTON ISSUE 2.1 (OSPREY SEPT 2024) Report · 24 Dec 2025
  • AVIATION-TECHNICAL_OPERATIONAL ASSESSMENT (NATS JAN 2022) Report · 24 Dec 2025
  • AVIATION-WARTON AERODROME CNS SAFEGUARDING (OSPREY JAN 2025) Report · 24 Dec 2025
  • AVIATION-WARTON AERODROME CNS SAFEGUARDING ADDENDUM (SARGENTIA MARCH 2025) Report · 24 Dec 2025
  • COLLABORATION_ELECTRICITY AGREEMENT GA-BEC (AUG 2025) Report · 24 Dec 2025
  • COMMUNITY RESEARCH - FINAL REPORT V2 UCLAN MARCH 2025. Report · 24 Dec 2025
  • CONSTRUCTION-CEMP NTS-TETRA TECH DECEMBER 2025. Report · 24 Dec 2025
  • DAS APP ONE - TECHNICAL NOTES TN1-TN5 PL. ISSUE V1 2025.12.15 Report · 24 Dec 2025
  • DAS PLANNING ISSUE V1 2025.12.17. Report · 24 Dec 2025
  • DRAINAGE STRATEGY P02 PART 1 Report · 24 Dec 2025
  • DRAINAGE STRATEGY P02 PART 2 Report · 24 Dec 2025
  • DRAINAGE STRATEGY P02 PART 3 Report · 24 Dec 2025
  • ECOLOGY-APP1 EXTENDED HABITATS SURVEY REPORT V3(AVIAN DEC 2025). Report · 24 Dec 2025
  • ECOLOGY-APP2 ORNITHOLOGY BASELINE REPORT V3 (AVIAN NOV 2025) Report · 24 Dec 2025
  • ECOLOGY-APP3 BAT ACTIVITY BASELINE REPORT V2 (AVIAN NOV 2025) Report · 24 Dec 2025
  • ECOLOGY-APP4 BIODIVERSITY METRIC ISSUE. Report · 24 Dec 2025
  • ECOLOGY-APP5 BIODIVERSITY NET GAIN REPORT V2 (AVIAN DEC 2025) Report · 24 Dec 2025
  • ECOLOGY-APP6 COLLISION RISK MODEL CALCS_V2 (AVIAN) Report · 24 Dec 2025
  • ECOLOGY-APP7 REPORT TO INFORM A HRA V1 (AVIAN NOVEMBER 2025) Report · 24 Dec 2025
  • ECOLOGY-ECOLOGY ASSESSMENT REPORT V2 (AVIAN DEC 2025) Report · 24 Dec 2025
  • FIRE MANAGEMENT SYSTEM (BESS) (GA DECEMBER 2025) Report · 24 Dec 2025
  • FLOOD RISK ASSESSMENT P04 (TETRATECH JUNE 2025) Report · 24 Dec 2025
  • GLINT AND GLARE STUDY - SOLAR VOLTAICS (PAGER POWER OCT 2024) Report · 24 Dec 2025
  • GROUND INVESTIGATION REPORT SUB SURFACE AUGUST 2025. Report · 24 Dec 2025
  • HERITAGE STATEMENT - PT1 REPORT (LANPRO NOV 2025) Report · 24 Dec 2025
  • HERITAGE STATEMENT - PT2 APPENDIX (LANPRO NOV 2025) Report · 24 Dec 2025
  • HERITAGE STATEMENT - PT3 APPENDIX (LANPRO NOV 2025) Report · 24 Dec 2025
  • LANDSCAPE_VISUAL ASSESSMENT (LVA)REPORT V1.3 (LANPRO NOV 2025). Report · 24 Dec 2025
  • LVA-APPENDIX 1A FIGURES 1 TO 9 (LANPRO NOV 2025). Report · 24 Dec 2025
  • LVA-APPENDIX 1B FIGURES 10 TO19 (LANPRO NOV 2025) Report · 24 Dec 2025
  • LVA-APPENDIX 2A PHOTOGRAPHY VPS 1 TO 10 Report · 24 Dec 2025
  • LVA-APPENDIX 2B PHOTOGRAPHY VPS 11 TO 23 (LANPRO NOV 2025) Report · 24 Dec 2025
  • LVA-APPENDIX 3 ILLUSTRATIVE PHOTOMONTAGES Report · 24 Dec 2025
  • NOISE IMPACT ASSESSMENT REV 2 (SPECTRUM DEC 2025) Report · 24 Dec 2025
  • NOISE-NTS SPECTRUM ACOUSTICS CJA-495423314 REV 1 DECEMBER 2025 Report · 24 Dec 2025
  • PLANNING STATEMENT R001V5 (PEGASUS DECEMBER 2025) Report · 24 Dec 2025
  • SOCIO-ECONOMIC REPORT V5.0 (BROOKDALE SEPT 2025) Report · 24 Dec 2025
  • SOCIO-ECONOMIC STATEMENT (NTS) (BROOKDALE SEPT 2025). Report · 24 Dec 2025
  • SOLAR DESIGN -PRE-FEASIBILITY REPORT V4 (SSW AUG 2022). Report · 24 Dec 2025
  • SOLAR_BESS NTS-(STANTEC HYDROCK LIMITED NOV 2025) Report · 24 Dec 2025
  • THERMAL ELECTRIFICATION-NTS V1 (COTOPAXI_SPIRAX SARCO DEC 2025 Report · 24 Dec 2025
  • THERMAL ELECTRIFICATION-REPORT V1.2 COTOPAXI_SPIRAX SARCO (DECEMBER 2024) Report · 24 Dec 2025
  • TRANSPORT-HIGHWAYS PRIMARY ACCESS APPRAISAL NTS (TETRA TECH DECEMBER 2025). Report · 24 Dec 2025
  • TRANSPORT-HIGHWAYS PRIMARY ROUTE APPRAISAL NTS - TETRA TECH DECEMBER 2025. Report · 24 Dec 2025
  • TRANSPORT-HIGHWAYS TRANSPORT ASSESSMENT V0003 (TETRA TECH NOVEMBER 2025) Report · 24 Dec 2025
  • TURBINE (LOCATION)-JRC CONSULTATION RESPONSE Report · 24 Dec 2025
  • TURBINE - FOUNDATION DESIGN STATEMENT 2022-143 B (GSA NOV 2025) Report · 24 Dec 2025
  • TURBINE-RISK STATEMENT REV3. Report · 24 Dec 2025
  • WIND FEASIBILITY STUDY (NTS) (RENEWABLES FIRST NOV 2025) Report · 24 Dec 2025
  • WIND-SOLAR-CARBON REDUCTION STRATEGY 1.0 (LOCOGEN APRIL 2021) Report · 24 Dec 2025

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Chorley for determination, against a statutory target of thirteen weeks. Over the last year Chorley decided full applications in a median of 87 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Land South East Of Bank Bridge Tarleton Lancashire

    2026/0234/FUL Submitted 23 Mar 2026 42m away

    86% historically approved · decision due ~18 May

    Cross Boundary application with Chorley ref 25/01256/FULMAJ. Construction of power generation facilities comprising a single wind turbine (4.2MW), solar photovoltaic array (12MW), and battery energy storage system (BESS) (5MWH) providing a combined renewable energy resource of 21.2 MW, with associated transmission Infrastructure including energy supply / cable routes to Bretherton village and Plocks Farm and erection of a battery storage building in Bretherton village.

    Awaiting decision Full applications 143 docs
  • Land South East Of Bank Bridge Tarleton Lancashire

    2026/0234/FUL Submitted 23 Mar 2026 42m away

    86% historically approved · decision due ~18 May

    Cross Boundary application with Chorley ref 25/01256/FULMAJ. Construction of power generation facilities comprising a single wind turbine (4.2MW), solar photovoltaic array (12MW), and battery energy storage system (BESS) (5MWH) providing a combined renewable energy resource of 21.2 MW, with associated transmission Infrastructure including energy supply / cable routes to Bretherton village and Plocks Farm and erection of a battery storage building in Bretherton village.

    Awaiting decision Full applications 145 docs

In Chorley

  • 26/00824/FUL Awaiting decision

    Plot 2 Old Withnell Stables Trigg Lane Heapey Chorley PR6 9BZ

    Application for technical details consent for the erection of 1no. self build dwelling pursuant to permission in principle 25/00224/PIP

    14 Sep 2026 Full applications
  • 26/00813/FUL Awaiting decision

    The Bungalow Ridley Lane Mawdesley Ormskirk L40 2RE

    Conversion of existing garage to create 1no. residential dwelling including roof alterations involving the raising of the ridge and eaves height to create a first floor, two storey side extension, new access, off road car parking, and associated landscape works

    10 Sep 2026 Full applications
  • 26/00809/FUL Awaiting decision

    Scrap Yard Town Lane Charnock Richard Chorley PR7 5HQ

    Installation of water tank (retrospective)

    9 Sep 2026 Full applications
  • 26/00811/FUL Awaiting decision

    Hearts And Minds Childcare Billinge House Euxton Lane Euxton Chorley PR7 6DL

    New external fire escape staircase to rear

    9 Sep 2026 Full applications
  • 26/00798/FUL Awaiting decision

    Land Next To Rose Cottage Sandy Lane Mawdesley Chorley L40 2QB

    Creation of a wildlife pond

    8 Sep 2026 Full applications