Planning application
Land Located South Of Bank Bridge Tarleton
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Construction of power generation facilities comprising a single wind turbine (4.2MW), solar photovoltaic array (12MW), and battery energy storage system (BESS) (5MWH) providing a combined renewable energy resource of 21.2 MW, with associated transmission Infrastructure including energy supply / cable routes to Bretherton village and Plocks Farm and erection of a battery storage building in Bretherton village
As published by the council, reference 25/01256/FULMAJ
Application record
- Reference
- 25/01256/FULMAJ
- Type
- Major Full Planning
- Status
- Awaiting decision
- Received
- 24 Dec 2025
- Validated
- 14 Jan 2026
- Ward
- Croston, Mawdesley And Euxton South
- Parish
- Bretherton
Timeline
Dates from the published record
-
24 Dec 2025
Received by Chorley
-
14 Jan 2026
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 15 April 2026, 13 weeks from validation under the statutory target. Extensions of time are common and are agreed case by case.
Chorley took a median of 62 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
- Application: 25/00372/SCE (Other decision)
Who's behind it
Company information only, from the register and Companies House
BCA Landscape Agent, registered in Liverpool
Active · incorporated 2017 · Liverpool
7 applications on PlanIndex · across 2 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
200 documents on file for this application
- CONSULTATION LETTER
- 25_01256_FULMAJ HIGHWAYS_TN03 (RESPONSE TO LCC HIGHWAYS) 2026.09.03 ISSUE
- 25_01256_FULMAJ HIGHWAYS_TN02 ASLAND WALKS (RESPONSE TO BANK BRIDGE) ISSUE
- GCN EDNA SURVEY LETTER REPORT_ISSUE
- ASLAND WALKS GCN EDNA SURVEY LETTER REPORT_ISSUE.PDF
- 2026.07.24 A.WALKS APPLIC BDY (AMND TO INCL CONSTRUCTION ACCESS).
- S IRWIN- MERSEYSIDE & WEST LANCASHIRE BAT GROUP
- CONSULTATION LETTER
- ASLAND WALKS RESPONSE TO MEAS
- ASLAND WALKS RESPONSE TO MWLBG
- ASLAND WALKS UPDATED REPORT TO INFORM HRA_V2
- ASLAND WALKS ENERGY PARK TECHNICAL NOTE_ISSUE
- 13712A - SOLAR PHOTOVOLTAIC GLINT AND GLARE STUDY V3.PDF
- ONLINE COMMENT
- MEAS- CH25-002_RESPAPP
- UNITED UTILITIES
- 13712D - SHADOW FLICKER TECHNICAL NOTE
- 13712D - SHADOW FLICKER TECHNICAL NOTE
- MOD_RESPONSE
- NATS RESPONSE 17.04.26
- TRANSPORT-ROUTE SURVEY REPORT 784-B069995 NOV 2025
- ONLINE COMMENT
- GROWTH LANCS
- ONLINE COMMENT
- PARISH COUNCIL
- LHA RESPONSE
- ANNEX 1_MORPH RIVER TYPE PRO MAP DATA
- ONLINE COMMENT
- ONLINE COMMENT
- ONLINE COMMENT
- ONLINE COMMENT
- ONLINE COMMENT
- 13712D1 V1 - TERRESTRIAL TELEVISION AND RADIO BASELINE RECEPTION SURVEY
- ENVIRONMENT AGENCY
- ONLINE COMMENT
- ONLINE COMMENT
- ONLINE COMMENT
- HERITAGE - HISTORIC ENVIRONMENT TECHNICAL NOTE V1.0 25_01256_FULMAJ_ ASLAND ENER
- HERITAGE - HISTORIC ENVIRONMENT TECHNICAL NOTE V1.0
- NATURAL ENGLAND
- ONLINE COMMENT
- PLOCKS FARM GREEN ENERGY SITE A - WINTERING BIRD STUDY 2020-2021
- PLOCKS FARM GREEN ENERGY SITE A - PRELIMINARY ECOLOGICAL APPRAISAL 09.2021
- ECOLOGY-APP4 BIODIVERSITY METRIC ISSUE
- ONLINE COMMENT
- ONLINE COMMENT
- ONLINE COMMENT
- ONLINE COMMENT
- LFRS RESPONSE TO CONSULTATION 25_01256_FULMAJ.
- ONLINE COMMENT
- ONLINE COMMENT
- ONLINE COMMENT
- CIL OFFICERS
- CONSULTATION LETTER
- ONLINE COMMENT
- LIVERPOOL JOHN LENNON AIRPORT RESPONSE
- 2022-143-019 - PLANS AND SECTIONS SHOWING ARRANGEMENTS ALONG RIVER DOUGLAS AND S
- ONLINE COMMENT
- CONSULTATION LETTER
- CONSULTATION LETTER
- RESPONSE TO ENERGY PARK APPLICATION SJM - PARISH COUNCIL
- ONLINE COMMENT
- ONLINE COMMENT
- ONLINE COMMENT
- PAUL FOSTER MP
- ONLINE COMMENT
- LLFA RESPONSE.PDF
- ONLINE COMMENT
- SHADOW FLICKER IMPACT ASSESSMENT V2 (PAGER POWER APRIL 2025).PDF
- ENVIRONMENT AGENCY RESPONSE
- ONLINE COMMENT
- ONLINE COMMENT
- ONLINE COMMENT
- ONLINE COMMENT
- ONLINE COMMENT
- ONLINE COMMENT
- ONLINE COMMENT
- ONLINE COMMENT
- ONLINE COMMENT
- ONLINE COMMENT
- ONLINE COMMENT
- ONLINE COMMENT
- CANAL & RIVER TRUST
- ONLINE COMMENT
- ONLINE COMMENT
- ONLINE COMMENT
- ONLINE COMMENT
- ONLINE COMMENT
- ONLINE COMMENT
- ONLINE COMMENT
- NATIONAL AIR TRAFFIC SERVICES RESPONSE
- ONLINE COMMENT
- 2022-143-015 - PROPOSED ELEVATIONS TO ELECTRICAL COMPOUND
- 2022-143-013F - GENERAL ARRANGEMENT AND DETAILS TO ELECTRICAL COMPOUND
- CANAL & RIVER TRUST
- LCC HISTORIC ENVIRONMENT RESPONSE
- ARQIVA RESPONSE
- NEIGHBOUR LETTER - INITIAL CONSULTATION
- SITE NOTICE - PLANNING APPLICATIONS
- CONSULTATION LETTER
- CONSULTATION LETTER
- CONSULTATION LETTER
- CONSULTATION LETTER
- CONSULTATION LETTER
- CONSULTATION LETTER
- CONSULTATION LETTER
- CONSULTATION LETTER
- CONSULTATION LETTER
- CONSULTATION LETTER
- CONSULTATION LETTER
- CONSULTATION LETTER
- CONSULTATION LETTER
- CONSULTATION LETTER
- CONSULTATION LETTER
- CONSULTATION LETTER
- CONSULTATION LETTER
- CONSULTATION LETTER
- CONSULTATION LETTER
- NEIGHBOUR LETTER - INITIAL CONSULTATION
- CIL OFFICERS
- ACKNOWLEDGEMENT LETTER
- ECOL APP2 ORNITHOLOGY FIG 2.13-2.18
- ECOL APP2 ORNITHOLOGY FIG 2.1-2.12
- ECOL APP2 ORNITHOLOGY FIG 2.25-2.28
- ECOL APP2 ORNITHOLOGY FIG 2.19-2.24
- 2026.01.14 (AMND) A.WALKS GREEN ENERGY PARK ? APPLIC BDY
- WIND TURBINE ELEVATION DETAILS
- PROPOSED BRETHERTON BATTERY BUILDING
- PROPOSED BRETHERTON BATTERY BUILDING LANDSCAPING PLAN
- 2022_143_013E GA AND DETAILS ELECTRICAL COMPOUND
- APPLICATIONFORMREDACTED
- 2022_143_002H FULL PROPOSED SITE LAYOUT
- 2022_143_011J GENERAL ARRANGEMENT TO SOLAR FARM
- 2022_143_012B TEMPORARY WORK ARRANGEMENTS
- 2022_143_013E GA AND DETAILS ELECTRICAL COMPOUND
- 2022_143_018A EXISTING CONTOUR PLAN
- 2022_143_020D HV CABLE ROUTE TO BRETHERTON
- 2022_143_021 GA AND DETAILS HV CABLE ROUTE RIVER AND ROAD
- 2022_143_022A PLAN ON HV ROUTE TO PLOCKS FARM.
- 2022_143_023A GA_DETAILS OF HV CABLE ROUTE BRETHERTON
- 22.522_BCAL_101_3 SOLAR_WIND TURBINE CONTEXT
- 22.522_BCAL_102_3 SOLAR_LANDSCAPE STRUCTURE.
- 22.522_BCAL_103_3 SOLAR_ALC
- 22.522_BCAL_105_3 SOLAR_SOLAR-WIND TURBINE DETAIL.
- AGRICULTURE-AGRICULTURAL LAND CLASSIFICATION (ADAS JULY 2020)
- ARBORICULTURAL IMPACT ASSESSMENT ASCERTA NOV 2025
- ARCHAEOLOGY YA_10577 REPORT_V2_PART1
- ARCHAEOLOGY YA_10577 REPORT_V2_PART2
- AVIATION-IFP SAFEGUARDING BLACKPOOL AIRPORT (CYRRUS DEC 2023
- AVIATION-RPT 72037-001 ADDENDUM WARTON ISSUE 2.1 (OSPREY MARCH 2025)
- AVIATION-RPT 72037-001 WARTON ISSUE 2.1 (OSPREY SEPT 2024)
- AVIATION-TECHNICAL_OPERATIONAL ASSESSMENT (NATS JAN 2022)
- AVIATION-WARTON AERODROME CNS SAFEGUARDING (OSPREY JAN 2025)
- AVIATION-WARTON AERODROME CNS SAFEGUARDING ADDENDUM (SARGENTIA MARCH 2025)
- COLLABORATION_ELECTRICITY AGREEMENT GA-BEC (AUG 2025)
- COMMUNITY RESEARCH - FINAL REPORT V2 UCLAN MARCH 2025.
- CONSTRUCTION-CEMP NTS-TETRA TECH DECEMBER 2025.
- DAS APP ONE - TECHNICAL NOTES TN1-TN5 PL. ISSUE V1 2025.12.15
- DAS PLANNING ISSUE V1 2025.12.17.
- DRAINAGE STRATEGY P02 PART 1
- DRAINAGE STRATEGY P02 PART 2
- DRAINAGE STRATEGY P02 PART 3
- ECOLOGY-APP1 EXTENDED HABITATS SURVEY REPORT V3(AVIAN DEC 2025).
- ECOLOGY-APP2 ORNITHOLOGY BASELINE REPORT V3 (AVIAN NOV 2025)
- ECOLOGY-APP3 BAT ACTIVITY BASELINE REPORT V2 (AVIAN NOV 2025)
- ECOLOGY-APP4 BIODIVERSITY METRIC ISSUE.
- ECOLOGY-APP5 BIODIVERSITY NET GAIN REPORT V2 (AVIAN DEC 2025)
- ECOLOGY-APP6 COLLISION RISK MODEL CALCS_V2 (AVIAN)
- ECOLOGY-APP7 REPORT TO INFORM A HRA V1 (AVIAN NOVEMBER 2025)
- ECOLOGY-ECOLOGY ASSESSMENT REPORT V2 (AVIAN DEC 2025)
- FIRE MANAGEMENT SYSTEM (BESS) (GA DECEMBER 2025)
- FLOOD RISK ASSESSMENT P04 (TETRATECH JUNE 2025)
- GLINT AND GLARE STUDY - SOLAR VOLTAICS (PAGER POWER OCT 2024)
- GROUND INVESTIGATION REPORT SUB SURFACE AUGUST 2025.
- HERITAGE STATEMENT - PT1 REPORT (LANPRO NOV 2025)
- HERITAGE STATEMENT - PT2 APPENDIX (LANPRO NOV 2025)
- HERITAGE STATEMENT - PT3 APPENDIX (LANPRO NOV 2025)
- LANDSCAPE_VISUAL ASSESSMENT (LVA)REPORT V1.3 (LANPRO NOV 2025).
- LVA-APPENDIX 1A FIGURES 1 TO 9 (LANPRO NOV 2025).
- LVA-APPENDIX 1B FIGURES 10 TO19 (LANPRO NOV 2025)
- LVA-APPENDIX 2A PHOTOGRAPHY VPS 1 TO 10
- LVA-APPENDIX 2B PHOTOGRAPHY VPS 11 TO 23 (LANPRO NOV 2025)
- LVA-APPENDIX 3 ILLUSTRATIVE PHOTOMONTAGES
- NOISE IMPACT ASSESSMENT REV 2 (SPECTRUM DEC 2025)
- NOISE-NTS SPECTRUM ACOUSTICS CJA-495423314 REV 1 DECEMBER 2025
- PLANNING STATEMENT R001V5 (PEGASUS DECEMBER 2025)
- SOCIO-ECONOMIC REPORT V5.0 (BROOKDALE SEPT 2025)
- SOCIO-ECONOMIC STATEMENT (NTS) (BROOKDALE SEPT 2025).
- SOLAR DESIGN -PRE-FEASIBILITY REPORT V4 (SSW AUG 2022).
- SOLAR_BESS NTS-(STANTEC HYDROCK LIMITED NOV 2025)
- THERMAL ELECTRIFICATION-NTS V1 (COTOPAXI_SPIRAX SARCO DEC 2025
- THERMAL ELECTRIFICATION-REPORT V1.2 COTOPAXI_SPIRAX SARCO (DECEMBER 2024)
- TRANSPORT-HIGHWAYS PRIMARY ACCESS APPRAISAL NTS (TETRA TECH DECEMBER 2025).
- TRANSPORT-HIGHWAYS PRIMARY ROUTE APPRAISAL NTS - TETRA TECH DECEMBER 2025.
- TRANSPORT-HIGHWAYS TRANSPORT ASSESSMENT V0003 (TETRA TECH NOVEMBER 2025)
- TURBINE (LOCATION)-JRC CONSULTATION RESPONSE
- TURBINE - FOUNDATION DESIGN STATEMENT 2022-143 B (GSA NOV 2025)
- TURBINE-RISK STATEMENT REV3.
- WIND FEASIBILITY STUDY (NTS) (RENEWABLES FIRST NOV 2025)
- WIND-SOLAR-CARBON REDUCTION STRATEGY 1.0 (LOCOGEN APRIL 2021)
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Chorley for determination, against a statutory target of thirteen weeks. Over the last year Chorley decided full applications in a median of 87 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land South East Of Bank Bridge Tarleton Lancashire
86% historically approved · decision due ~18 May
Cross Boundary application with Chorley ref 25/01256/FULMAJ. Construction of power generation facilities comprising a single wind turbine (4.2MW), solar photovoltaic array (12MW), and battery energy storage system (BESS) (5MWH) providing a combined renewable energy resource of 21.2 MW, with associated transmission Infrastructure including energy supply / cable routes to Bretherton village and Plocks Farm and erection of a battery storage building in Bretherton village.
Awaiting decision Full applications 143 docs -
Land South East Of Bank Bridge Tarleton Lancashire
86% historically approved · decision due ~18 May
Cross Boundary application with Chorley ref 25/01256/FULMAJ. Construction of power generation facilities comprising a single wind turbine (4.2MW), solar photovoltaic array (12MW), and battery energy storage system (BESS) (5MWH) providing a combined renewable energy resource of 21.2 MW, with associated transmission Infrastructure including energy supply / cable routes to Bretherton village and Plocks Farm and erection of a battery storage building in Bretherton village.
Awaiting decision Full applications 145 docs
Other full applications
In Chorley
-
26/00824/FUL Awaiting decision
Plot 2 Old Withnell Stables Trigg Lane Heapey Chorley PR6 9BZ
Application for technical details consent for the erection of 1no. self build dwelling pursuant to permission in principle 25/00224/PIP
-
26/00813/FUL Awaiting decision
The Bungalow Ridley Lane Mawdesley Ormskirk L40 2RE
Conversion of existing garage to create 1no. residential dwelling including roof alterations involving the raising of the ridge and eaves height to create a first floor, two storey side extension, new access, off road car parking, and associated landscape works
-
26/00809/FUL Awaiting decision
Scrap Yard Town Lane Charnock Richard Chorley PR7 5HQ
Installation of water tank (retrospective)
-
26/00811/FUL Awaiting decision
Hearts And Minds Childcare Billinge House Euxton Lane Euxton Chorley PR7 6DL
New external fire escape staircase to rear
-
26/00798/FUL Awaiting decision
Land Next To Rose Cottage Sandy Lane Mawdesley Chorley L40 2QB
Creation of a wildlife pond