Skip to content
PlanIndex Get alerts
Menu

Planning application

Former Walton Works and Boythorpe Works Factory Street Chesterfield Derbyshire

Awaiting decision Chesterfield CHE/26/00675/FUL Full applications

Works: New dwelling Major scheme

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Conversion of Walton Works mill to form 3 commercial units and 37 apartments, conversion of Walton Mill Terrace to provide 11 townhouses and construction of 204 dwellings, with associated works

As published by the council, reference CHE/26/00675/FUL

Application record

Reference
CHE/26/00675/FUL
Category
Full applications
Status
Awaiting decision
Received
5 Aug 2026
Validated
22 Sep 2026
Ward
Brampton East & Boythorpe

Site history

Applications at this address on the Chesterfield register

This site has had 2 applications since 2026.

  • CHE/26/00676/LBC Awaiting decision

    Former Walton Works and Boythorpe Works Factory Street Chesterfield Derbyshire

    Conversion of Walton Works mill to form 3 commercial units and 37 apartments and conversion of Walton Mill Terrace to provide 11 townhouses with associated works

    Submitted 5 Aug 2026 Heritage and listed buildings

Timeline

Dates from the published record

  1. 5 Aug 2026

    Received by Chesterfield

  2. 22 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  3. 29 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 17 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Chesterfield took a median of 64 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Application: CHE/26/00676/LBC (Registered)

Documents

Plans, drawings, consultee responses and the officer's report

136 documents on file for this application

  • SINGLE GARAGE Drawing · 22 Sep 2026
  • NOISE IMPACT ASSESSMENT REPORT Background Documents · 22 Sep 2026
  • PROPOSED FIRST FLOOR PLAN TERRACE Drawing · 22 Sep 2026
  • STAGE 02 DESIGN REPORT Background Documents · 22 Sep 2026
  • PROPOSED HARD AND SOFT LANDSCAPING PLAN - BOYTHORPE Drawing · 17 Sep 2026
  • PROPOSED SITE PLAN - WALTON Drawing · 17 Sep 2026
  • PROPOSED SITE PLAN - BOYTHORPE Drawing · 17 Sep 2026
  • PROPOSED SITE PLAN - HARD AND SOFT LANDSCAPING MASTERPLAN Drawing · 17 Sep 2026
  • PROPOSED HARD AND SOFT LANDSCAPING PLAN - WALTON Drawing · 17 Sep 2026
  • PROPOSED SITE PLAN - MASTERPLAN Drawing · 17 Sep 2026
  • WALTON SITE PLAN Drawing · 16 Sep 2026
  • BOYTHORPE SITE PLAN Drawing · 16 Sep 2026
  • WALTON MILL DEMOLITION PLAN Drawing · 16 Sep 2026
  • EXISTING THIRD FLOOR PLAN MILL Drawing · 16 Sep 2026
  • EXISTING ROOF PLAN MILL Drawing · 16 Sep 2026
  • EXISTING ELEVATIONS WALTON MILL 1-3 Drawing · 16 Sep 2026
  • EXISTING ELEVATIONS WALTON MILL 4-8 Drawing · 16 Sep 2026
  • EXISTING ELEVATIONS MILL TERRACES 7-14 Drawing · 16 Sep 2026
  • EXISTING ELEVATIONS WALTON MILL 15-16 Drawing · 16 Sep 2026
  • EXISTING ELEVATIONS MILL TERRACES 17-20 Drawing · 16 Sep 2026
  • EXISTING GROUND FLOOR & BASEMENT TERRACE Drawing · 16 Sep 2026
  • EXISTING FIRST FLOOR TERRACE Drawing · 16 Sep 2026
  • ROOF PLAN TERRACE Drawing · 16 Sep 2026
  • PROPOSED SECOND FLOOR PLAN MILL Drawing · 16 Sep 2026
  • PROPOSED THIRD FLOOR PLAN MILL Drawing · 16 Sep 2026
  • PROPOSED ROOF PLAN MILL Drawing · 16 Sep 2026
  • PROPOSED ELEVATIONS WALTON MILL 1-3 Drawing · 16 Sep 2026
  • PROPOSED ELEVATIONS WALTON MILL 4-6 Drawing · 16 Sep 2026
  • PROPOSED ELEVATIONS MILL TERRACES 7-14 Drawing · 16 Sep 2026
  • PROPOSED ELEVATIONS WALTON MILL 15-16 Drawing · 16 Sep 2026
  • PROPOSED ELEVATIONS MILL TERRACES 17-20 Drawing · 16 Sep 2026
  • PROPOSED SECTION AA THROUGH B9 Drawing · 16 Sep 2026
  • PROPOSED SECTION B-B B13 Drawing · 16 Sep 2026
  • PROPOSED SECTION C-C B12 Drawing · 16 Sep 2026
  • PROPOSED SECTION D-D B11 Drawing · 16 Sep 2026
  • PROPOSED SECTION E-E B9 Drawing · 16 Sep 2026
  • PROPOSED SECTION F-F B7 Drawing · 16 Sep 2026
  • PROPOSED SECTION G-G B1 Drawing · 16 Sep 2026
  • DEMOLITION & ALTERATIONS GROUND FLOOR PLAN TERRACE Drawing · 16 Sep 2026
  • DEMOLITION & ALTERATIONS FIRST FLOOR PLAN TERRACE Drawing · 16 Sep 2026
  • HERITAGE STATEMENT AND IMPACT STATEMENT Background Documents · 16 Sep 2026
  • WRITTEN SCHEME OF INVESTIGATION Background Documents · 16 Sep 2026
  • DOCUMENT ISSUE SHEET Background Documents · 16 Sep 2026
  • PROPOSED HOUSE TYPE 1A - FLOORPLANS Drawing · 16 Sep 2026
  • PROPOSED HOUSE TYPE 1A - ELEVATIONS Drawing · 16 Sep 2026
  • PROPOSED HOUSE TYPE 1B - FLOORPLANS Drawing · 16 Sep 2026
  • PROPOSED HOUSE TYPE 1B - ELEVATIONS Drawing · 16 Sep 2026
  • PROPOSED HOUSE TYPE 2A - FLOORPLANS Drawing · 16 Sep 2026
  • PROPOSED HOUSE TYPE 2A - ELEVATIONS Drawing · 16 Sep 2026
  • PROPOSED HOUSE TYPE 2B - FLOORPLANS Drawing · 16 Sep 2026
  • PROPOSED HOUSE TYPE 2B - ELEVATIONS Drawing · 16 Sep 2026
  • PROPOSED HOUSE TYPE 3 - FLOORPLANS Drawing · 16 Sep 2026
  • PROPOSED HOUSE TYPE 3 - ELEVATIONS Drawing · 16 Sep 2026
  • PROPOSED HOUSE TYPE 4 - FLOORPLANS Drawing · 16 Sep 2026
  • PROPOSED HOUSE TYPE 4 - ELEVATIONS Drawing · 16 Sep 2026
  • PROPOSED HOUSE TYPE 5 - FLOORPLANS Drawing · 16 Sep 2026
  • PROPOSED HOUSE TYPE 5 - ELEVATIONS Drawing · 16 Sep 2026
  • PROPOSED HOUSE TYPE 5 HANDED - FLOORPLANS Drawing · 16 Sep 2026
  • PROPOSED HOUSE TYPE 5 HANDED - ELEVATIONS Drawing · 16 Sep 2026
  • PROPOSED HOUSE TYPE 6 - FLOORPLANS Drawing · 16 Sep 2026
  • PROPOSED HOUSE TYPE 6 - ELEVATIONS Drawing · 16 Sep 2026
  • PROPOSED HOUSE TYPE 6 HANDED - FLOORPLANS Drawing · 16 Sep 2026
  • PROPOSED HOUSE TYPE 6 HANDED - ELEVATIONS Drawing · 16 Sep 2026
  • PROPOSED HOUSE TYPE 7 - FLOORPLANS Drawing · 16 Sep 2026
  • PROPOSED HOUSE TYPE 7 - ELEVATIONS Drawing · 16 Sep 2026
  • PROPOSED HOUSE TYPE 7 HANDED - FLOORPLANS Drawing · 16 Sep 2026
  • PROPOSED HOUSE TYPE 7 HANDED - ELEVATIONS Drawing · 16 Sep 2026
  • PROPOSED HOUSE TYPE 8 - FLOORPLANS Drawing · 16 Sep 2026
  • PROPOSED HOUSE TYPE 8 - ELEVATIONS Drawing · 16 Sep 2026
  • PROPOSED HOUSE TYPE 8 HANDED - FLOORPLANS Drawing · 16 Sep 2026
  • TRANSPORT ASSESSMENT Background Documents · 13 Aug 2026
  • HOUSE TYPE 10 Drawing · 11 Aug 2026
  • HOUSE TYPE 11 Drawing · 11 Aug 2026
  • HOUSE TYPE 12 Drawing · 11 Aug 2026
  • HOUSE TYPE 13 Drawing · 11 Aug 2026
  • HOUSE TYPE 14 Drawing · 11 Aug 2026
  • HOUSE TYPE 15 Drawing · 11 Aug 2026
  • HOUSE TYPE 16 Drawing · 11 Aug 2026
  • HOUSE TYPE 17 Drawing · 11 Aug 2026
  • DESIGN REPORT Background Documents · 07 Aug 2026
  • PROPOSED HOUSE TYPE 1A - SECTIONS Drawing · 07 Aug 2026
  • PROPOSED HOUSE TYPE 1B - SECTIONS Drawing · 07 Aug 2026
  • PROPOSED HOUSE TYPE 2A - SECTIONS Drawing · 07 Aug 2026
  • PROPOSED HOUSE TYPE 2B - SECTIONS Drawing · 07 Aug 2026
  • PROPOSED HOUSE TYPE 3 - SECTIONS Drawing · 07 Aug 2026
  • PROPOSED HOUSE TYPE 4 - SECTIONS Drawing · 07 Aug 2026
  • PROPOSED HOUSE TYPE 5 - SECTIONS Drawing · 07 Aug 2026
  • PROPOSED HOUSE TYPE 6 - SECTIONS Drawing · 07 Aug 2026
  • PROPOSED HOUSE TYPE 8 - SECTIONS Drawing · 07 Aug 2026
  • SITE INVESTIGATION REPORT Background Documents · 07 Aug 2026
  • FLOOD RISK ASSESSMENT Background Documents · 07 Aug 2026
  • PROPOSED HOUSE TYPE 7 - SECTIONS Drawing · 07 Aug 2026
  • APPLICATIONFORMREDACTED Application Form · 05 Aug 2026
  • PLANNING STATEMENT 1 Background Documents · 05 Aug 2026
  • DESIGN AND ACCESS STATEMENT Background Documents · 05 Aug 2026
  • MILL DESIGN RESPONSE Background Documents · 05 Aug 2026
  • PLANNING STATEMENT 2 Background Documents · 05 Aug 2026
  • SUSTAINABILITY STATEMENT Background Documents · 05 Aug 2026
  • EXISTING GROUND FLOOR PLAN MILL Drawing · 05 Aug 2026
  • EXISTING FIRST FLOOR PLAN MILL Drawing · 05 Aug 2026
  • EXISTING SECOND FLOOR PLAN MILL Drawing · 05 Aug 2026
  • PROPOSED GROUND FLOOR PLAN MILL Drawing · 05 Aug 2026
  • PROPOSED FIRST FLOOR PLAN MILL Drawing · 05 Aug 2026
  • PROPOSED GROUND FLOOR PLAN TERRACE Drawing · 05 Aug 2026
  • DEMOLITION & ALTERATIONS GROUND FLOOR PLAN MILL Drawing · 05 Aug 2026
  • DEMOLITION & ALTERATIONS FIRST FLOOR PLAN MILL Drawing · 05 Aug 2026
  • DEMOLITION & ALTERATIONS SECOND FLOOR PLAN MILL Drawing · 05 Aug 2026
  • DEMOLITION & ALTERATIONS THIRD FLOOR PLAN MILL Drawing · 05 Aug 2026
  • PHASE II ENVIRONMENTAL SITE ASSESSMENT Background Documents · 05 Aug 2026
  • PHASE 2 PRE-DEVELOPMENT ARBORICULTURAL REPORT AND METHOD STATEMENT Background Documents · 05 Aug 2026
  • SITE LOCATION PLAN Drawing · 05 Aug 2026
  • BNG FEASIBILITY REPORT Background Documents · 05 Aug 2026
  • HABITAT CONDITION ASSESSMENT SHEETS Background Documents · 05 Aug 2026
  • STATUTORY METRIC Background Documents · 05 Aug 2026
  • PRELIMINARY ECOLOGICAL APPRAISAL Background Documents · 05 Aug 2026
  • EXISTING ELEVATIONS WALTON MILL 1-3 WORKS SCHEDULE Drawing · 05 Aug 2026
  • EXISTING ELEVATIONS WALTON MILL 4-6 WORKS SCHEDULE Drawing · 05 Aug 2026
  • EXISTING ELEVATIONS MILL TERRACES 7-14 WORKS SCHEDULE Drawing · 05 Aug 2026
  • EXISTING ELEVATIONS WALTON MILL 15-16 WORKS SCHEDULE Drawing · 05 Aug 2026
  • EXISTING ELEVATIONS MILL TERRACES 17-20 WORKS SCHEDULE Drawing · 05 Aug 2026
  • PROPOSED ELEVATIONS WALTON MILL 1-3 WORKS SCHEDULE Drawing · 05 Aug 2026
  • PROPOSED ELEVATIONS WALTON MILL 4-7 WORKS SCHEDULE Drawing · 05 Aug 2026
  • PROPOSED ELEVATIONS MILL TERRACES 7-14 WORKS SCHEDULE Drawing · 05 Aug 2026
  • PROPOSED ELEVATIONS WALTON MILL 15-16 WORKS SCHEDULE Drawing · 05 Aug 2026
  • PROPOSED ELEVATIONS MILL TERRACE 17-20 WORKS SCHEDULE Drawing · 05 Aug 2026
  • FRAMEWORK TRAVEL PLAN Background Documents · 05 Aug 2026
  • CATCHMENT AREAS SHEET 1 Drawing · 05 Aug 2026
  • CATCHMENT AREAS SHEET 2 Drawing · 05 Aug 2026
  • DRAINAGE STRATEGY AND SUDS ASSESSMENT Background Documents · 05 Aug 2026
  • DRAINAGE STRATEGY SHEET 1 Drawing · 05 Aug 2026
  • DRAINAGE STRATEGY SHEET 2 Drawing · 05 Aug 2026
  • GREENFIELD RUNOFF RATE ESTIMATION Background Documents · 05 Aug 2026
  • SURFACE WATER NET 1-V1 Background Documents · 05 Aug 2026
  • SURFACE WATER NET 2-V1 Background Documents · 05 Aug 2026
  • SURFACE WATER NET 3-V1 Background Documents · 05 Aug 2026
  • COVER LETTER Correspondence · 05 Aug 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Chesterfield for determination, against a statutory target of eight weeks. Over the last year Chesterfield decided full applications in a median of 133 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Chesterfield

  • St Johns Farm Bridle Road Woodthorpe Chesterfield Derbyshire S43 3BY

    Change of use of barn to a dwelling with external alterations

    Received 26 May, published by the council 25 Jul 2026 Full applications
  • The Green 16 Campbell Drive Barrow Hill Chesterfield Derbyshire S43 2PN

    Change of use, extension and alteration of former chip shop to form annexe attached to existing dwelling

    Received 14 May, published by the council 22 Jul 2026 Full applications
  • CHE/26/00898/FUL Awaiting decision

    Lavant Court Lydden Close Brimington Chesterfield Derbyshire S43 1NA

    Full planning permission for the erection of a bin store and installation of a drop kerb

    Received 2 Oct, published by the council 9 Oct 2026 Full applications
  • CHE/26/00889/FUL Awaiting decision

    Sunrisers Lodge Ralph Road Staveley Chesterfield Derbyshire S43 3PY

    A retrospective planning application for a single park home, stoned yard and boundary walls/fences

    Received 30 Sep, published by the council 7 Oct 2026 Full applications
  • Units A & B Lordsmill Street Chesterfield Derbyshire S41 7RS

    Refurbishment of existing retail warehouse comprising externals alterations to facilitate amalgamation of Units A and B, sprinkler tank, pump house and associated means of enclosure, trolley coral, formation of external display area and associated works

    Received 8 Jun, published by the council 22 Jul 2026 Full applications