Ward · Cheshire West and Chester
Planning applications in Winsford Swanlow And Dene
Page 2 of 2, newest first. Back to the Winsford Swanlow And Dene overview.
Applications in Winsford Swanlow And Dene
Newest first · page 2 of 2
-
18/01555/FUL Granted
29 Well Street Winsford Cheshire CW7 1HN
Demolition of part shed and construction of single storey rear extension with replacement part of existing roof
-
18/01509/DIS Granted
Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich
Discharge of condition 3 (phases of development) of planning permission 13/01134/FUL
-
18/01518/FUL Granted
69 Swanlow Lane Winsford Cheshire CW7 1JD
Single storey rear extension
-
18/01366/FUL Granted
17 Rosemary Crescent Winsford CW7 4EU
Single storey rear extension
-
18/01265/FUL Granted
2 Darnhall School Lane Winsford Cheshire CW7 1JR
Single storey rear extension with replacement balcony above
-
18/01323/DIS Granted
125A Swanlow Lane Winsford CW7 1JB
Discharge of condition 8 (contamination) of planning permission 16/03432/FUL
-
18/01120/OHL Decided
Overhead Lines Cheshire
Rebuild of the 11kv overhead line involving the excavation, recovery and renewal of poles and stays with some relatively minor deviations from the existing route in places to allow sections of the overhead and supporting poles to be moved to the edges of fields and away from built structures.
-
18/01087/DIS Granted
Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich
Discharge of Condition 27 on Planning Application 13/01134/FUL (Development of pipeline corridor of 3 pipes between the brinefield at Warmingham and the salt factory at Middlewich and 4 pipes and fibre optic cable link between the salt factory at Middlewich and the chemical works at Lostock, erection of buffer tank at Warmingham brine field, buffer tank pumping station and 4 settlement tanks used in the purification process at the salt factory, Middlewich, a pipe bridge crossing at the River Dane, pumping station at Blue Slates Farm, 2 buffer tanks and pumping station at the chemical factory, Lostock and other associated ancillary development)
-
18/01023/FUL Granted
Yachtshaven Ways Green Winsford CW7 4YH
Double garage
-
18/00910/FUL Granted
35 Swanlow Lane Winsford Cheshire CW7 1JD
Erection of detached annexe
-
18/00610/DIS Granted
Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich
Discharge of Condition 3 (phasing plan) on Planning Application 13/01134/FUL (Development of pipeline corridor of 3 pipes between the brinefield at Warmingham and the salt factory at Middlewich and 4 pipes and fibre optic cable link between the salt factory at Middlewich and the chemical works at Lostock, erection of buffer tank at Warmingham brine field, buffer tank pumping station and 4 settlement tanks used in the purification process at the salt factory, Middlewich, a pipe bridge crossing at the River Dane, pumping station at Blue Slates Farm, 2 buffer tanks and pumping station at the chemical factory, Lostock and other associated ancillary development)
-
18/00576/FUL Granted
Land Rear of 165 To 219 Townfields Road Winsford
Re-planning of Plots 60-69 and plots 115-122 from the previously approved reserved matters application.
-
18/00488/FUL Granted
217 Townfields Road Winsford Cheshire CW7 4AX
Single storey side and rear extension
-
18/00404/FUL Granted
10 St Georges Road Winsford Cheshire CW7 1DA
Demolition of WC and shed and erection of single storey rear extension
-
18/00312/FUL Granted
9 Plantagenet Close Winsford CW7 1PU
Single storey side extension
-
18/00251/LDC Refused
69 Swanlow Lane Winsford Cheshire CW7 1JD
Single storey rear extension including demolishing existing store
-
18/00229/NMA Granted
Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich
Amendment to conditions 7, 22, 15, 18, 19, 20, 28, 30, 31, 39, 41 of permission 13/01134/FUL (Development of pipeline corridor of 3 pipes between the brinefield at Warmingham and the salt factory at Middlewich and 4 pipes and fibre optic cable link between the salt factory at Middlewich and the chemical works at Lostock, erection of buffer tank at Warmingham brine field, buffer tank pumping station and 4 settlement tanks used in the purification process at the salt factory, Middlewich, a pipe bridge crossing at the River Dane, pumping station at Blue Slates Farm, 2 buffer tanks and pumping station at the chemical factory, Lostock and other associated ancillary development)
-
18/00255/OHL Granted
Land Adjacent Dorset Cottage Whitegate Lane Winsford
11kv overhead service line from which a second supply is to be taken - retrospective
-
18/00179/FUL Granted
9 Swallow Court Winsford Cheshire CW7 1SR
Garage conversion
-
18/00133/LDC Withdrawn
9 Swallow Court Winsford Cheshire CW7 1SR
Part garage conversion for disabled use.
-
17/05402/FUL Granted
87 Swanlow Lane Winsford Cheshire CW7 1JD
Single storey rear extension
-
17/05332/FUL Refused
Land Adjacent The Bungalow Weaver Hall Lane Darnhall Winsford
Erection and Use of Agricultural Barn (Retrospective )
-
17/05199/DIS Granted
Land At Corner of Welsh Lane Swanlow Lane Winsford Cheshire
Discharge of condition 6 (junction improvements) of planning permission 13/03459/OUT
-
12/03870/OHL Granted
Red Hill Farm, Moss Lane Tiverton CW6 9HE
Erection of an additional wooden pole to enable a new electricity supply to Red Hill Farm, Moss Lane Tiverton CW6 9HE