Skip to content
PlanIndex Get alerts
Menu

Planning application

Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich

Granted Cheshire West and Chester 18/01087/DIS Discharge of Conditions

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Discharge of Condition 27 on Planning Application 13/01134/FUL (Development of pipeline corridor of 3 pipes between the brinefield at Warmingham and the salt factory at Middlewich and 4 pipes and fibre optic cable link between the salt factory at Middlewich and the chemical works at Lostock, erection of buffer tank at Warmingham brine field, buffer tank pumping station and 4 settlement tanks used in the purification process at the salt factory, Middlewich, a pipe bridge crossing at the River Dane, pumping station at Blue Slates Farm, 2 buffer tanks and pumping station at the chemical factory, Lostock and other associated ancillary development)

As published by the council, reference 18/01087/DIS

Application record

Reference
18/01087/DIS
Type
Discharge of Conditions
Status
Approved
Decision
Granted As published: Approval
Received
20 Mar 2018
Validated
20 Mar 2018
Decided
21 Mar 2018
Ward
Winsford Swanlow And Dene
Parish
Winsford Town Council
Decision by
Delegated Decision

Site history

Applications at this address on the Cheshire West and Chester register

This site has had 7 applications since 2018: 7 approved, 0 refused.

  • 18/04333/DIS Granted

    Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich

    Discharge of Condition 27 (proposed route access) on planning permission 13/01134/FUL (Development of pipeline corridor of 3 pipes between the brinefield at Warmingham and the salt factory at Middlewich and 4 pipes and fibre optic cable link between the salt factory at Middlewich and the chemical works at Lostock, erection of buffer tank at Warmingham brine field, buffer tank pumping station and 4 settlement tanks used in the purification process at the salt factory, Middlewich, a pipe bridge crossing at the River Dane, pumping station at Blue Slates Farm, 2 buffer tanks and pumping station at the chemical factory, Lostock and other associated ancillary development) for Phase One Area

    Decided 6 Dec 2018 Conditions
  • 18/02814/DIS Granted

    Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich

    Discharge of conditions 8 (landscaping), 9 (nesting birds), 13 (wildlife protection plan), 14 (bat survey), 16 (walkover survey), 17 (large mammal survey), 19 (management/control of Japanese Knotweed and Himalayan Balsam), 20 (construction environmental plan), 21 (trees and hedgerows to be removed), 22 (arboricultural method statement), 23 (ecological mitigation measures), 25 (method statement), 28 (HGV routing list), 30 (programme of archaeological work), 31 (contamination of surface waters), 33 (lighting), 34 (noise and vibrations), 36 (remediation strategy), 41 (restoration works) and 42 (restoration aftercare) in relation to phase one.

    Decided 1 Oct 2018 Conditions
  • 18/01646/NMA Granted

    Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich

    Non Material Amendment to Planning application 13/01134/FUL to change the pipe diameters

    Decided 24 May 2018 Amendments
  • 18/01509/DIS Granted

    Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich

    Discharge of condition 3 (phases of development) of planning permission 13/01134/FUL

    Decided 13 Jun 2018 Conditions
  • 18/00610/DIS Granted

    Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich

    Discharge of Condition 3 (phasing plan) on Planning Application 13/01134/FUL (Development of pipeline corridor of 3 pipes between the brinefield at Warmingham and the salt factory at Middlewich and 4 pipes and fibre optic cable link between the salt factory at Middlewich and the chemical works at Lostock, erection of buffer tank at Warmingham brine field, buffer tank pumping station and 4 settlement tanks used in the purification process at the salt factory, Middlewich, a pipe bridge crossing at the River Dane, pumping station at Blue Slates Farm, 2 buffer tanks and pumping station at the chemical factory, Lostock and other associated ancillary development)

    Decided 13 Mar 2018 Conditions
  • 18/00229/NMA Granted

    Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich

    Amendment to conditions 7, 22, 15, 18, 19, 20, 28, 30, 31, 39, 41 of permission 13/01134/FUL (Development of pipeline corridor of 3 pipes between the brinefield at Warmingham and the salt factory at Middlewich and 4 pipes and fibre optic cable link between the salt factory at Middlewich and the chemical works at Lostock, erection of buffer tank at Warmingham brine field, buffer tank pumping station and 4 settlement tanks used in the purification process at the salt factory, Middlewich, a pipe bridge crossing at the River Dane, pumping station at Blue Slates Farm, 2 buffer tanks and pumping station at the chemical factory, Lostock and other associated ancillary development)

    Decided 15 Feb 2018 Amendments

Timeline

Dates from the published record

  1. 20 Mar 2018

    Received by Cheshire West and Chester

  2. 21 Mar 2018

    Decision issued: Approval

  3. 21 Nov 2026

    Added to PlanIndex

Documents

5 documents on file for this application

A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

Working a patch? Trade sends you every new job in your area each morning. 14 days free.

What this grant of permission means

Cheshire West and Chester granted permission on 21 March 2018, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich

    18/04333/DIS Submitted 8 Nov 2018 50 yards away

    Discharge of Condition 27 (proposed route access) on planning permission 13/01134/FUL (Development of pipeline corridor of 3 pipes between the brinefield at Warmingham and the salt factory at Middlewich and 4 pipes and fibre optic cable link between the salt factory at Middlewich and the chemical works at Lostock, erection of buffer tank at Warmingham brine field, buffer tank pumping station and 4 settlement tanks used in the purification process at the salt factory, Middlewich, a pipe bridge crossing at the River Dane, pumping station at Blue Slates Farm, 2 buffer tanks and pumping station at the chemical factory, Lostock and other associated ancillary development) for Phase One Area

    Granted Conditions 11 docs
  • Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich

    18/00610/DIS Submitted 15 Feb 2018 50 yards away

    Discharge of Condition 3 (phasing plan) on Planning Application 13/01134/FUL (Development of pipeline corridor of 3 pipes between the brinefield at Warmingham and the salt factory at Middlewich and 4 pipes and fibre optic cable link between the salt factory at Middlewich and the chemical works at Lostock, erection of buffer tank at Warmingham brine field, buffer tank pumping station and 4 settlement tanks used in the purification process at the salt factory, Middlewich, a pipe bridge crossing at the River Dane, pumping station at Blue Slates Farm, 2 buffer tanks and pumping station at the chemical factory, Lostock and other associated ancillary development)

    Granted Conditions 5 docs
  • Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich

    18/01646/NMA Submitted 30 Apr 2018 50 yards away

    Non Material Amendment to Planning application 13/01134/FUL to change the pipe diameters

    Granted Amendments 8 docs
  • Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich

    18/00229/NMA Submitted 19 Jan 2018 50 yards away

    Amendment to conditions 7, 22, 15, 18, 19, 20, 28, 30, 31, 39, 41 of permission 13/01134/FUL (Development of pipeline corridor of 3 pipes between the brinefield at Warmingham and the salt factory at Middlewich and 4 pipes and fibre optic cable link between the salt factory at Middlewich and the chemical works at Lostock, erection of buffer tank at Warmingham brine field, buffer tank pumping station and 4 settlement tanks used in the purification process at the salt factory, Middlewich, a pipe bridge crossing at the River Dane, pumping station at Blue Slates Farm, 2 buffer tanks and pumping station at the chemical factory, Lostock and other associated ancillary development)

    Granted Amendments 5 docs
  • Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich

    18/01509/DIS Submitted 18 Apr 2018 50 yards away

    Discharge of condition 3 (phases of development) of planning permission 13/01134/FUL

    Granted Conditions 7 docs
  • Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich

    18/02814/DIS Submitted 19 Jul 2018 50 yards away

    Discharge of conditions 8 (landscaping), 9 (nesting birds), 13 (wildlife protection plan), 14 (bat survey), 16 (walkover survey), 17 (large mammal survey), 19 (management/control of Japanese Knotweed and Himalayan Balsam), 20 (construction environmental plan), 21 (trees and hedgerows to be removed), 22 (arboricultural method statement), 23 (ecological mitigation measures), 25 (method statement), 28 (HGV routing list), 30 (programme of archaeological work), 31 (contamination of surface waters), 33 (lighting), 34 (noise and vibrations), 36 (remediation strategy), 41 (restoration works) and 42 (restoration aftercare) in relation to phase one.

    Granted Conditions Trees 38 docs

In Cheshire West and Chester

  • 26/00696/DIS Granted

    Birchdale Farm Waterloo Lane Kingsley Frodsham WA6 6JH

    To discharge of conditions 3 (materials), 5 (bird and bat boxes) and 8 (visibility splays) of planning permission 22/03184/FUL

    Received 4 Mar, published by the council 21 Jul 2026 Conditions
  • 25/02152/DIS Granted

    Land At Cable Drive Helsby Frodsham

    Discharge of condition 13 (remediation verification) of planning application 20/00324/FUL

    Received 14 Jul, published by the council 21 Jul 2026 Conditions
  • 26/02626/BGP Granted

    The Old Vicarage Worthenbury Road Church Shocklach Malpas SY14 7BN

    Discharge of Note 4 (BGP) of planning permission 25/03198/FUL

    Received 23 Jul, published by the council 23 Aug 2026 Conditions
  • 26/01472/LDC Granted

    Meadow View Oldfield Farm Road Pulford Chester CH4 9DG

    Application for a Certificate of Lawfulness in respect of the occupation of the dwelling at Meadow View, in breach of the agricultural occupancy condition attached to planning permission ref. 2/3/S.4346 having continued in excess of 10 years.

    Received 13 May, published by the council 21 Jul 2026 Conditions
  • 26/02881/DIS Granted

    32A High Street Northwich CW9 5BJ

    Discharge of conditions 4 (Noise Impact Report) and 5 (Kitchen oudour assessment) of planning permission 25/03660/FUL

    Received 10 Sep, published by the council 24 Sep 2026 Conditions