Planning application

Land At Lostock Works Griffiths Road Lostock Gralam Northwich

Awaiting decision Cheshire West and Chester 26/02637/DIS

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Discharge of conditions 17 (site layout), 18 (vehicles on site), 21 (landscape management plan), 23 (hard landscaping) and 24 (ecological mitigation and enhancement) of 12.04.09.04/35C (10/00691/DECC)

As published by the council, reference 26/02637/DIS

Application record

Reference
26/02637/DIS
Status
Awaiting decision
Received
20 Aug 2026
Validated
20 Aug 2026
Ward
Witton And Rudheath
Parish
Northwich Town Council

Site history

Applications at this address on the Cheshire West and Chester register

This site has had 8 applications since 2019: 5 approved, 0 refused.

  • 20/02814/DIS Withdrawn

    Land At Lostock Works Griffiths Road Lostock Gralam Northwich

    Discharge of Condition 12 (Construction Environmental Management Plan) of 18/04558/FUL ( Erection of Workshop and Amenity Building)

    Decided 14 Apr 2021 Conditions
  • 20/02367/DIS Withdrawn

    Land At Lostock Works Griffiths Road Lostock Gralam Northwich

    Discharge of condition 6 (drainage) of planning permission 18/04558/FUL

    Decided 20 Apr 2021 Conditions
  • 20/02109/FUL Granted

    Land At Lostock Works Griffiths Road Lostock Gralam Northwich

    Construction of a Distribution Network Operator (DNO) substation, Gas Insultated Substation (GIS) building, Waste To Energy (WTE) electrical room, 2no. switchgear, 5no. car parking spaces, generator kiosk, security fencing and associated hard-standing.

    Decided 6 Oct 2020 Full applications
  • 19/04426/DIS Granted

    Land At Lostock Works Griffiths Road Lostock Gralam Northwich

    Discharge of condition 10 (Foundation Works Risk Assessment) of planning permission 18/04558/FUL

    Decided 4 Mar 2020 Conditions
  • 19/04181/DIS Granted

    Land At Lostock Works Griffiths Road Lostock Gralam Northwich

    Discharge of Condition 3 (Materials) of 18/04558/FUL (Erection of Workshop and Amenity Building)

    Decided 3 Dec 2019 Conditions
  • 19/02682/FUL Granted

    Land At Lostock Works Griffiths Road Lostock Gralam Northwich

    Erection of Distribution Network Operator (DNO) substation, Waste To Energy (WTE) electrical room, 2no. switchgear, 6no. car parking spaces, security fencing and associated hardstanding

    Decided 9 Jan 2020 Full applications
  • 19/02672/FUL Granted

    Land At Lostock Works Griffiths Road Lostock Gralam Northwich

    Proposed development of a 'Tank Farm' for the relocated Water Purification Plant and associated infrastructure

    Decided 9 Jan 2020 Full applications

Timeline

Dates from the published record

  1. 20 Aug 2026

    Received by Cheshire West and Chester

  2. 3 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 15 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Cheshire West and Chester took a median of 58 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Application: 10/00691/DECC (Approved)

Documents

Plans, drawings, consultee responses and the officer's report

60 documents on file for this application

  • APPLICATION FORM - WITHOUT PERSONAL DATA Application Form · 20 Aug 2026
  • PROPOSED SITE PLAN Drawing · 20 Aug 2026
  • BUILDING LAYOUT PLAN Drawing · 20 Aug 2026
  • ELEVATIONS - SOUTH Drawing · 20 Aug 2026
  • ELEVATIONS - NORTH Drawing · 20 Aug 2026
  • PROPOSED ELEVATIONS - NORTH/SOUTH/EAST/WEST Drawing · 20 Aug 2026
  • PHASING PLAN Drawing · 20 Aug 2026
  • PHASING PLAN Drawing · 20 Aug 2026
  • SITE MOVEMENT PLAN Drawing · 20 Aug 2026
  • ELEVATION - WEST Drawing · 20 Aug 2026
  • ELEVATION - EAST Drawing · 20 Aug 2026
  • EXISTING AND PROPOSED ACCESS ROAD UPGRADE PLAN Drawing · 20 Aug 2026
  • APPENDIX A - DRAWING AND DOCUMENT LIST Document · 20 Aug 2026
  • COVERING LETTER Correspondence · 20 Aug 2026
  • ECOLOGICAL AND MITIGATION ENHANCEMENT SCHEME V4 Document · 20 Aug 2026
  • LANDSCAPE MANAGEMENT - V5PLAN Document · 20 Aug 2026
  • FIRE SUPPRESSION AND EMERGENCY MEASURES REV 5 Document · 20 Aug 2026
  • SUPPORTING STATEMENT Document · 20 Aug 2026
  • OVERVIEW OF MATERIALS Drawing · 20 Aug 2026
  • PROPOSED SITE PLAN Drawing · 20 Aug 2026
  • PROPOSED SITE PLAN - BUBBLED Drawing · 20 Aug 2026
  • MAIN BUILDING SITE PLAN Drawing · 20 Aug 2026
  • SITE PLAN - MAIN BUILDING - BUBBLED Drawing · 20 Aug 2026
  • PROPOSED SITE PLAN - MAIN BUILDING Drawing · 20 Aug 2026
  • PROPOSED SITE PLAN - MAIN BUILDING - BUBBLED Drawing · 20 Aug 2026
  • MAIN BUILDING SITE MOVEMENTS PLAN Drawing · 20 Aug 2026
  • WORKING AREAS PLAN Drawing · 20 Aug 2026
  • EXTENT OF HARDSTANDING PLAN Drawing · 20 Aug 2026
  • FENCING PLAN Drawing · 20 Aug 2026
  • FENCING DETAILS PLAN Drawing · 20 Aug 2026
  • FENCING DETAILS PLAN Drawing · 20 Aug 2026
  • LANDSCAPE PROPOSALS PLAN Drawing · 20 Aug 2026
  • LANDSCAPE PROPOSALS PLAN Drawing · 20 Aug 2026
  • LANDSCAPE PROPOSALS PLAN Drawing · 20 Aug 2026
  • ECOLOGICAL MITIGATION PLAN Drawing · 20 Aug 2026
  • ECOLOGICAL MITIGATION PLAN Drawing · 20 Aug 2026
  • SITE SECTIONS PLAN Drawing · 20 Aug 2026
  • ELEVATIONS - MAIN BUILDING - NORTH Drawing · 20 Aug 2026
  • ELEVATIONS - MAIN BUILDING - NORTH BUBBLED Drawing · 20 Aug 2026
  • ELEVATIONS - MAIN BUILDING - SOUTH Drawing · 20 Aug 2026
  • ELEVATIONS - MAIN BUILDING - SOUTH BUBBLED Drawing · 20 Aug 2026
  • ELEVATIONS - MAIN BUILDING - EAST Drawing · 20 Aug 2026
  • ELEVATIONS - MAIN BUILDING - EAST BUBBLED Drawing · 20 Aug 2026
  • ELEVATIONS - MAIN BUILDING - WEST Drawing · 20 Aug 2026
  • ELEVATIONS - MAIN BUILDING - WEST BUBBLED Drawing · 20 Aug 2026
  • ELEVATIONS - ACC Drawing · 20 Aug 2026
  • ELEVATIONS - ACC BUBBLED Drawing · 20 Aug 2026
  • PLANS AND ELEVATIONS - ACC PIPE GANTRY Drawing · 20 Aug 2026
  • PLANS AND ELEVATIONS - FIRE WATER TANK Drawing · 20 Aug 2026
  • PLANS - PUMP HOUSE Drawing · 20 Aug 2026
  • ELEVATIONS - PUMP HOUSE Drawing · 20 Aug 2026
  • PLANS AND ELEVATIONS - WASTE WATER TREATMENT Drawing · 20 Aug 2026
  • PLANS AND ELEVATIONS - WASTE WATER TREATMENT Drawing · 20 Aug 2026
  • PLAN AND ELEVATIONS - TRANSFORMER ENCLOSURE Drawing · 20 Aug 2026
  • PLAN AND ELEVATIONS - FUEL OIL TANK Drawing · 20 Aug 2026
  • PLAN AND ELEVATIONS - CONDENSATE TANK Drawing · 20 Aug 2026
  • PLAN AND ELEVATIONS - FUEL OIL TANK ENCLOSURE Drawing · 20 Aug 2026
  • WATER TREATMENT FACILITY PLAN Drawing · 20 Aug 2026
  • ELEVATIONS - SWITCH ROOM Drawing · 20 Aug 2026
  • SAMPLE BOARD V2 Drawing · 20 Aug 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Cheshire West and Chester for determination, against a statutory target of eight weeks. Over the last year Cheshire West and Chester's median decision took 58 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Cheshire West and Chester's portal will say. Our guide explains the common types.