Skip to content
PlanIndex Get alerts
Menu

Planning application

The Firs Cottage School Lane Childer Thornton Ellesmere Port CH66 5PJ

Awaiting decision Cheshire West and Chester 26/02523/PIP Other

Works: New dwelling Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Demolition of existing buildings at Firs Cottage and replacement with 3 new build dwellings

As published by the council, reference 26/02523/PIP

Application record

Reference
26/02523/PIP
Type
Other
Status
Awaiting decision
Received
10 Aug 2026
Validated
6 Oct 2026
Ward
Willaston And Thornton
Postcode
CH66 5PJ

Site history

Applications at this address on the Cheshire West and Chester register

This site has had 3 applications since 2020: 2 approved, 0 refused.

  • 20/02509/TPO Granted

    The Firs Cottage School Lane Childer Thornton Ellesmere Port CH66 5PJ

    Scots Pine (x 4) T1, T2, T3, T4 - all to be felled. Replacement trees can be planted if deemed necessary by the LATO Remove Ivy from woodland ground cover and tree trunks in parcel of woodland covered by TPO Remove smaller woody shrubs from parcel of woodland covered by TPO

    Decided 25 Aug 2020 Trees
  • 20/00952/FUL Granted

    The Firs Cottage School Lane Childer Thornton Ellesmere Port CH66 5PJ

    Change of Use from outbuilding to ancillary accommodation

    Decided 22 Apr 2021 Amendments

Timeline

Dates from the published record

  1. 10 Aug 2026

    Received by Cheshire West and Chester

  2. 6 Oct 2026

    Validated

    Checked as complete and ready for consideration.

  3. 12 Oct 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 1 December 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Cheshire West and Chester took a median of 56 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Cheshire West and Chester for determination, against a statutory target of eight weeks. Over the last year Cheshire West and Chester decided less common application types in a median of 25 days. More in our guide to how long planning decisions take.

About less common application types

This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Cheshire West and Chester

  • 26/02948/DEM Granted

    Boughton Water Treatment Works Bulkeley Street Chester

    Demolition of 5 interconnected brick storage sheds within the existing operational footprint.

    Received 16 Sep, published by the council 24 Sep 2026 Other
  • 26/03173/CAT Awaiting decision

    White Thorns Back Lane Whitley Warrington WA4 4QJ

    Oak (T4) - Remove over-extended 2nd order limb back to main stem union. Lime (T5) - Reduce crown at defective union, reduce central leader to 2m above the bifurcation, and to 0.3m above the adjacent minor branch.

    Received 5 Oct, published by the council 12 Oct 2026 Other
  • 26/03147/AGR Awaiting decision

    Land At Bates Lane Helsby Frodsham

    General purpose agricultural produce and machinery store

    Received 1 Oct, published by the council 12 Oct 2026 Other
  • 26/03120/AGR Awaiting decision

    Land At Marsh Lane Dutton Northwich

    Erection of general purpose agricultural produce and machinery store

    Received 30 Sep, published by the council 12 Oct 2026 Other
  • 26/03031/CAT Awaiting decision

    Little Roodee Car Park Castle Drive Chester CH1 1SL

    2x Ash to be crown raised to give 2m clearance off the cafe building. 1x Elder to be crown raised to give clearance off the cafe building. 2x dead stems to be removed (one on ground and one fallen onto building).

    Received 22 Sep, published by the council 24 Sep 2026 Other