Skip to content
PlanIndex Get alerts
Menu

Planning application

Tramways Crewe Street Chester CH1 3DA

Awaiting decision Cheshire West and Chester 26/02504/FUL Full applications

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of external secure cycle store to facilitate conversion of existing internal cycle stores into shared dining & media room and dance/fitness suite; landscaping proposals to form external amenity area; conversion of roof space void to form 1no. cluster bedroom (Block AF), corresponding changes to relevant elevations

As published by the council, reference 26/02504/FUL

Application record

Reference
26/02504/FUL
Category
Full applications
Status
Awaiting decision
Received
7 Aug 2026
Validated
7 Aug 2026
Ward
Chester City and The Garden Quarter
Postcode
CH1 3DA

Comment by 18 September 2026

The council is taking comments on this application until then. Have your say on Cheshire West and Chester's portal.

Timeline

Dates from the published record

  1. 7 Aug 2026

    Received by Cheshire West and Chester

  2. 6 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 2 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Cheshire West and Chester took a median of 58 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Applicant on file, registered in St Helier

2 applications on PlanIndex · across 2 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

31 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Cheshire West and Chester for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Tramways Crewe Street Chester CH1 3DA

    26/00371/P14 Submitted 4 Feb 2026 45m away

    92% historically approved · decision due ~1 Apr

    Installation of 352 new solar PV Panels to be fixed on the pitched roofs spread over 5 separate buildings

    Decided
  • Anfields DIY Station Road Chester CH1 3PA

    20/00146/FUL Submitted 15 Jan 2020 79m away

    Change of use to rental facility and associated facilities

    Granted Full applications 8 docs
  • 4 Chapel Lodge Sibell Street Chester CH1 3BU

    26/01799/CAT Submitted 12 Jun 2026 89m away

    Sycamore - Prune away from roof and both properties to achieve 2m clearance

    Decided Trees 3 docs
  • Homer House Station Road Chester CH1 3DU

    20/01038/FUL Submitted 16 Mar 2020 99m away

    Demolition of Homer House and the construction of 17 apartments

    Refused Full applications New dwelling Demolition 39 docs
    Major scheme
  • 124 and 126 Brook Street Chester CH1 3DU

    26/00579/LDC Submitted 23 Feb 2026 106m away

    83% historically approved · decision due ~18 Jun

    Existing Lawful Development Certificate for more than ten years continuous use as guesthouse in conjunction with main part of guest house at 126 adjacent

    Awaiting decision Amendments 23 docs
  • The Town Crier 65 City Road Chester Cheshire CH1 3AE

    19/04523/LBC Submitted 19 Dec 2019 109m away

    Internal alterations/refurbishment works associated with enlargement of existing kitchen, creation of new first floor toilets and mounting of external television.

    Granted Heritage and listed buildings 16 docs

In Cheshire West and Chester

  • 26/02799/FUL Awaiting decision

    Urenco UK Ltd Capenhurst Lane Capenhurst Chester CH1 6ER

    Drilling of boreholes and installation of covers for groundwater monitoring purposes.

    3 Sep 2026 Full applications
  • 26/01813/FUL Granted

    25 Dublin Croft Great Sutton Ellesmere Port CH66 2TD

    Two storey side extension with single storey front porch extension

    15 Jun 2026 Full applications
  • 26/01781/FUL Granted

    Barnholt Norley Hall Farm Town Farm Lane Norley Northwich WA6 8NH

    Single-storey front porch extension and installation of photovoltaic panels to the rear south-facing roof elevation.

    11 Jun 2026 Full applications
  • 26/01635/FUL Granted

    26 Arrowcroft Road Guilden Sutton Chester CH3 7ES

    Single storey rear/side extension

    28 May 2026 Full applications
  • 26/01833/FUL Granted

    6 Oaklands Crescent Tattenhall Chester CH3 9QT

    Two storey side extensions above existing garage and single storey rear extension and render to all walls.

    16 Jun 2026 Full applications