Skip to content
PlanIndex Get alerts
Menu

Planning application

26/02091/LBC

Chapel Mostyn House Grenfell Park Parkgate Neston

Awaiting decision Cheshire West and Chester Heritage and listed buildings

Proposal

Refurbishment works to the existing stained glass windows, installation of internal secondary glazing and external storm glazing to 15 windows.

As published by the council, reference 26/02091/LBC

Timeline

Dates from the published record

  1. 7 Jul 2026

    Received by Cheshire West and Chester

  2. 21 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Cheshire West and Chester for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About heritage and listed buildings applications

How this application type works

Heritage applications concern listed buildings and conservation areas. Listed building consent is needed for works, inside or out, that affect the special interest of a listed building, and carrying out such works without consent is a criminal offence. The council weighs harm to the heritage asset against any public benefit of the proposal.

More on heritage and listed buildings applications in our guide

Nearby applications

Within 500 metres

  • 26/02090/FUL Awaiting decision

    Chapel Mostyn House Grenfell Park Parkgate Neston

    Refurbishment works to the existing stained glass windows, installation of internal secondary glazing and external storm glazing to 15 windows.

    7 Jul 2026 0m away Full applications
  • 26/02125/NMA Awaiting decision

    Bracton Little Lane Parkgate Neston Cheshire West And Chester CH64 6SD

    Non Material Amendment to 23/01106/FUL (re-siting of part of garden facing garage wall 600mm)

    9 Jul 2026 120m away Amendments
  • 26/01403/LDC Granted

    6 Holywell Close Parkgate Neston CH64 6SH

    Siting of a mobile home for ancillary use to the main dwellinghouse.

    8 May 2026 182m away Lawful development
  • 25/02885/FUL Awaiting decision

    4 Grenfell Close Parkgate Neston CH64 6TU

    Demolition of existing conservatory to north elevation to be replaced with orangery.

    12 Sep 2025 226m away Full applications
  • 20/03295/FUL Refused

    Madriguera Station Road Parkgate Neston CH64 6QJ

    Remove existing hedge and erection of boundary wall

    9 Sep 2020 233m away Trees
  • 26/01428/TPO Granted

    6 Grenfell Close Parkgate Neston CH64 6TU

    2x Sycamores (T1 and T2) - Reduce crown by 3m to point of previous pollards.

    11 May 2026 253m away Trees

In Cheshire West and Chester

  • 26/01617/LBC Granted

    Overleigh Lodge Dukes Drive Chester CH4 7QP

    Internal alterations

    22 May 2026 Heritage and listed buildings
  • 26/01334/LBC Granted

    11 - 13 Watergate Street Chester CH1 2LB

    Internal Alterations and Refurbishment works

    1 May 2026 Heritage and listed buildings
  • 25/01452/LBC Granted

    Beech Lane Farm Beech Lane Rushton Tarporley CW6 9AQ

    Refurbishment of existing farmhouse and conversion of existing stables to one dwelling including single storey extension.

    9 May 2025 Heritage and listed buildings
  • 26/00451/LBC Withdrawn

    Lion Salt Works Ollershaw Lane Marston Northwich CW9 6ES

    Replacement of three external staircases

    11 Feb 2026 Heritage and listed buildings
  • 26/00820/LBC Granted

    St Oswalds Churchyard Church Street Malpas SY14 8NU

    Installation of six brass commemorative plaques to the existing Malpas War Memorial, along with remedial works to the surrounding platform including re-levelling, replacement of defective flagstones, and replacement and infilling of mortar joints between flagstones

    13 Mar 2026 Heritage and listed buildings