Planning application
Swan House New Cheshire Business Park Wincham Lane Wincham Northwich CW9 6GG
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
The installation of a steel chimney with associated base detail between two existing buildings
As published by the council, reference 26/01921/FUL
Application record
- Reference
- 26/01921/FUL
- Category
- Full applications
- Status
- Awaiting decision
- Received
- 25 Jun 2026
- Validated
- 11 Aug 2026
- Ward
- Marbury
- Parish
- Wincham
- Postcode
- CW9 6GG
Timeline
Dates from the published record
-
25 Jun 2026
Received by Cheshire West and Chester
-
11 Aug 2026
Validated
Checked as complete and ready for consideration.
-
25 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 6 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Cheshire West and Chester took a median of 58 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Cheshire West and Chester for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Swan House New Cheshire Business Park Wincham Lane Wincham Northwich CW9 6GG
92% historically approved · decision due ~9 Feb
The addition of 3No. windows at first floor and a fire exit door to the ground floor to the elevation facing Wincham Lane to suit internal alterations
Decided Full applications Windows or glazing -
5 New Cheshire Business Park Wincham Lane Wincham Northwich CW9 6GG
Internal refurbishment for use as ancillary offices, addition of 3 new windows and new loading bay to match existing.
Granted Full applications Windows or glazing 9 docs -
Land Within and Adj. New Cheshire Business Park Wincham Lane Wincham Northwich
92% historically approved · decision due ~1 Oct
The formation of a new priority-controlled junction bellmouth access on the northern side of Wincham Lane to serve the south-western corner of the New Cheshire Business Park.
Awaiting decision Full applications 7 docs -
Land Opposite 19 Wincham Lane Wincham Northwich
Discharge of condition 14 (contamination) on planning permission 19/02748/FUL
Granted Conditions 6 docs -
Land Opposite 19 Wincham Lane Wincham Northwich
Erection of storage building, re-siting of storage containers and alterations to boundary fencing (associated with the approved use of the land for equipment storage and parking of plant/vehicles).
Granted Full applications 13 docs -
Land Rear 5 New Cheshire Business Park Wincham Lane Wincham Northwich
Change of use to inert and excavation waste recycling facility, erection of a 2-storey modular building for office use and the erection of a workshop canopy building (partly in retrospect)
Granted Other 48 docs
Other full applications applications
In Cheshire West and Chester
-
26/02799/FUL Awaiting decision
Urenco UK Ltd Capenhurst Lane Capenhurst Chester CH1 6ER
Drilling of boreholes and installation of covers for groundwater monitoring purposes.
-
26/01813/FUL Granted
25 Dublin Croft Great Sutton Ellesmere Port CH66 2TD
Two storey side extension with single storey front porch extension
-
26/01781/FUL Granted
Barnholt Norley Hall Farm Town Farm Lane Norley Northwich WA6 8NH
Single-storey front porch extension and installation of photovoltaic panels to the rear south-facing roof elevation.
-
26/01635/FUL Granted
26 Arrowcroft Road Guilden Sutton Chester CH3 7ES
Single storey rear/side extension
-
26/01833/FUL Granted
6 Oaklands Crescent Tattenhall Chester CH3 9QT
Two storey side extensions above existing garage and single storey rear extension and render to all walls.