Planning application
26/01531/FUL
Cross Lanes Farm Cross Lanes Oscroft Tarvin Chester CH3 8HR
Proposal
Single storey extension
As published by the council, reference 26/01531/FUL
Timeline
Dates from the published record
-
20 May 2026
Received by Cheshire West and Chester
-
21 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Cheshire West and Chester for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
24/02750/CAT Decided
1 The Sheaf Broomheath Lane Hockenhull Chester CH3 8HF
T1 Silver Birch 20% Crown Reduction (Continued Management prune back to previous cuts) T2 Silver Birch 20% Crown Reduction (Continued Management prune back to previous cuts) T3 Silver Birch 20% Crown Reduction (Continued Management prune back to previous cuts) T4 Ash 20% Crown Reduction (Continued Management prune back to previous cuts) T5 Spruce 50% Crown Reduction (Too tall possibility of being blown over in strong winds)
-
21/04095/CWO Decided
Granary Steps 2 Sheaf Farm Court Platts Lane Hockenhull Chester CH3 8HG
Compliance with conditions for all financial obligations under the S106 agreement under planning application 01/01209/FUL dated 12th July 2002
-
20/03846/FUL Granted
S P and G Blything Cross Lanes Oscroft Tarvin Chester CH3 8HS
Outdoor wood burning biomass boiler and flue that will protrude above roof by 1.2m, sited adjacent to existing steel portal building
-
26/02281/AGR Awaiting decision
Land At Cross Lanes Oscroft Tarvin Chester
General purpose agricultural building.
-
26/01316/LDC Awaiting decision
The Gables Cross Lanes Oscroft Tarvin Chester CH3 8HS
Outbuilding to provide gym, WC and study
-
26/01319/LDC Awaiting decision
The Gables Cross Lanes Oscroft Tarvin Chester CH3 8HS
Outbuilding to provide garage, garden store, workshop, plant room, home office and games room.
Other full applications applications
In Cheshire West and Chester
-
26/02343/TPO Awaiting decision
Lostock Tiny Tots Pre-School The Vicarage Station Road Lostock Gralam Northwich CW9 7PS
Horse Chestnut (T1) - Reduce longer, heavier branches by 1m to 3m as appropriate to reduce the risk of major failures
-
26/01554/FUL Granted
4 West Vale Neston CH64 9SF
Erection of a rear and side two-storey extension
-
26/00316/FUL Withdrawn
Land At Tilston Road Malpas Cheshire
Erection of 2no. detached dwellinghouses and associated access road, landscaping and boundary treatments.
-
26/00572/FUL Granted
Motte Manor Chorlton Lane Chorlton Malpas SY14 7EN
Replace front and side boundary fence with a brick wall and retaining timber panels to the remaining side and rear boundaries.
-
26/02299/FUL Awaiting decision
Forum Building Princess Street Chester
Removal of existing artwork through overpainting with white masonry paint and installation of a replacement UV-printed PVC banner fixed directly to the Forum building wall overlooking Exchange Square by Chester Market.