Land At Sutton New Hall Farm Ledsham Road Little Sutton Ellesmere Port

Granted Cheshire West and Chester 26/01143/DIS

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Discharge of condition 18 (landscaping) under 25/02453/NMA (Non Material Amendment to update drawings under condition 2 of reserved matters approval 23/02279/REM (Reserved Matters application for 627 dwellings forming part of Phases 6, 7, 8, 9, 10 & 11 of the development, alongside associated infrastructure and open space pursuant to outline planning permission 12/02091/OUT (for a total of up to 2000 dwellings and associated development)) (Plot substitutions to Phase 6 (plots 1028 to 1082))

As published by the council, reference 26/01143/DIS

Application record

Reference
26/01143/DIS
Status
Approved
Decision
Approved
Received
13 Apr 2026
Validated
13 Apr 2026
Decided
8 Sep 2026
Ward
Ledsham And Manor
Decision by
Delegated Decision

Site history

Applications at this address on the Cheshire West and Chester register

This site has had 14 applications since 2023: 3 approved, 0 refused.

  • 26/01288/DIS Awaiting decision

    Land At Sutton New Hall Farm Ledsham Road Little Sutton Ellesmere Port

    Discharge of condition 7 (school travel plan), 13 (compensatory flood storage), 14 (surface water drainage),15 (overland flow),17 (ground investigation), 31 (flooding resilience), 32 (noise scheme - internal levels), 33 (plant noise scheme) in connection with of reserved matters application pursuant to outline planning permission 12/02091/OUT, comprising details of a 1.5FE primary school (two phases) and associated works

    Submitted 28 Apr 2026 Conditions
  • 26/01142/NMA Granted

    Land At Sutton New Hall Farm Ledsham Road Little Sutton Ellesmere Port

    Non Material Amendment to 23/02279/REM (Reserved Matters application for 627 dwellings forming part of Phases 6, 7, 8, 9, 10 & 11 of the development, alongside associated infrastructure and open space pursuant to outline planning permission 12/02091/OUT (for a total of up to 2000 dwellings and associated development)) (Amendment to condition 2 relating to Phase 6 only including materials, plot amendments on 1041-1045), addition of air source heat pumps and omission of sub-station r/o plots 1050/1051)

    Submitted 13 Apr 2026 Amendments
  • 25/04018/DIS Awaiting decision

    Land At Sutton New Hall Farm Ledsham Road Little Sutton Ellesmere Port

    Discharge of condition 11 (Biodiversity Enhancement) under 23/02279/REM (Reserved Matters application for 627 dwellings forming part of Phases 6, 7, 8, 9, 10 & 11 of the development, alongside associated infrastructure and open space pursuant to outline planning permission 12/02091/OUT )

    Submitted 22 Dec 2025 Conditions
  • 25/03169/DIS Awaiting decision

    Land At Sutton New Hall Farm Ledsham Road Little Sutton Ellesmere Port

    Discharge of condition 3 (phasing), condition 4 (levels), condition 5 (street furniture), condition 6 (RPAs), condition 8 (RAMS), of planning application 23/02279/REM (Reserved Matters application for 627 dwellings forming part of Phases 6, 7, 8, 9, 10 & 11 of the development, alongside associated infrastructure and open space pursuant to outline planning permission 12/02091/OUT )

    Submitted 8 Oct 2025 Conditions
  • 25/03170/DIS Awaiting decision

    Land At Sutton New Hall Farm Ledsham Road Little Sutton Ellesmere Port

    To discharge conditions 13 (substation details), 14 (provision of parking and cycle facilities) and 15 (recreational open space provision) relating to planning permission 23/02279/REM.

    Submitted 8 Oct 2025 Conditions
  • 25/02097/DIS Awaiting decision

    Land At Sutton New Hall Farm Ledsham Road Little Sutton Ellesmere Port

    Discharge of condition 26 (construction environmental management plan) of 12/02091/OUT (for up to 2000 homes, up to 400 square metres of retail floor space for a local shop, a new primary school, a community building, a new linear Park, playing fields and other public open space, new allotments together with new accessed streets and other related infrastructure) (Details in connection with reserved matters details for local convenience store under 24/00936/REM)

    Submitted 9 Jul 2025 Conditions
  • 25/02106/DIS Awaiting decision

    Land At Sutton New Hall Farm Ledsham Road Little Sutton Ellesmere Port

    Discharge of condition 33 (plant noise) of 12/02091/OUT under planning permission 12/02091/OUT (for up to 2000 homes, up to 400 square metres of retail floor space for a local shop, a new primary school, a community building, a new linear Park, playing fields and other public open space, new allotments together with new accessed streets and other related infrastructure) (Details in connection with reserved matters details for local convenience store under 24/00936/REM)

    Submitted 9 Jul 2025 Conditions
  • 25/02098/DIS Awaiting decision

    Land At Sutton New Hall Farm Ledsham Road Little Sutton Ellesmere Port

    Discharge of condition 37 (Employment and Training Plan) of 12/02091/OUT under planning permission 12/02091/OUT (for up to 2000 homes, up to 400 square metres of retail floor space for a local shop, a new primary school, a community building, a new linear Park, playing fields and other public open space, new allotments together with new accessed streets and other related infrastructure) (Details in connection with reserved matters details for local convenience store under 24/00936/REM)

    Submitted 9 Jul 2025 Conditions
  • 25/02043/DIS Awaiting decision

    Land At Sutton New Hall Farm Ledsham Road Little Sutton Ellesmere Port

    Discharge of condition 17 (site investigation) under planning permission 12/02091/OUT (for up to 2000 homes, up to 400 square metres of retail floor space for a local shop, a new primary school, a community building, a new linear Park, playing fields and other public open space, new allotments together with new accessed streets and other related infrastructure) (Details in connection with reserved matters details for local convenience store under 24/00936/REM)

    Submitted 2 Jul 2025 Conditions
  • 25/01977/DIS Awaiting decision

    Land At Sutton New Hall Farm Ledsham Road Little Sutton Ellesmere Port

    Discharge of conditions 13 (Compensatory flood storage), 14 (Surface water), and 15 (Overland flow) of planning permission under 12/02091/OUT (for up to 2000 homes, up to 400 square metres of retail floor space for a local shop, a new primary school, a community building, a new linear Park, playing fields and other public open space, new allotments together with new accessed streets and other related infrastructure) (Details in connection with reserved matters details for local convenience store under 24/00936/REM)

    Submitted 26 Jun 2025 Conditions

Timeline

Dates from the published record

  1. 13 Apr 2026

    Received by Cheshire West and Chester

  2. 21 Jul 2026

    Added to PlanIndex

  3. 8 Sep 2026

    Decision issued: Approved

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Cheshire West and Chester granted permission on 8 September 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Cheshire West and Chester's portal will say. Our guide explains the common types.