Planning application
Handbridge Service Station Handbridge Chester CH4 7JF
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Discharge of condition 8 (contamination verification report) of planning permission 18/02145/FUL
As published by the council, reference 19/01925/DIS
Application record
- Reference
- 19/01925/DIS
- Type
- Discharge of Conditions
- Status
- Awaiting decision
- Received
- 20 May 2019
- Validated
- 20 May 2019
- Ward
- Handbridge Park
- Postcode
- CH4 7JF
Site history
Applications at this address on the Cheshire West and Chester register
This site has had 5 applications since 2019: 1 approved, 0 refused.
-
19/01650/S73 Awaiting decision
Handbridge Service Station Handbridge Chester CH4 7JF
Variation of Conditions 12 (Noise Levels) and 13 (Noise and Odour) of 18/02145/FUL
-
19/01479/ADV Granted
Handbridge Service Station Handbridge Chester CH4 7JF
Externally illuminated and Non Illuminated signage
-
19/01325/S73 Awaiting decision
Handbridge Service Station Handbridge Chester CH4 7JF
Variation of Condition 14 to planning permission 18/02145/FUL to allow for an amendment to the proposed opening hours of the petrol filling station to between 06:00 and 23:00 on Monday to Sunday and on public holidays
-
19/00312/DIS Awaiting decision
Handbridge Service Station Handbridge Chester CH4 7JF
Discharge of Conditions 9 (materials), 16 (external lighting) and 18 (cycle storage) to planning permission 18/02145/FUL
Timeline
Dates from the published record
-
20 May 2019
Received by Cheshire West and Chester
-
6 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 15 July 2019, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Cheshire West and Chester took a median of 56 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Cheshire West and Chester for determination, against a statutory target of eight weeks. Over the last year Cheshire West and Chester decided condition discharge and variation applications in a median of 95 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Handbridge Service Station Handbridge Chester CH4 7JF
96% historically approved · decision due ~25 Mar
Discharge of Conditions 9 (materials), 16 (external lighting) and 18 (cycle storage) to planning permission 18/02145/FUL
Awaiting decision Conditions 8 docs -
Handbridge Service Station Handbridge Chester CH4 7JF
96% historically approved · decision due ~30 May
Variation of Condition 14 to planning permission 18/02145/FUL to allow for an amendment to the proposed opening hours of the petrol filling station to between 06:00 and 23:00 on Monday to Sunday and on public holidays
Awaiting decision Conditions 5 docs -
Handbridge Service Station Handbridge Chester Cheshire CH4 7JF
Amendment to application 18/02145/FUL for amendment to footprint of building, rear wall now positioned 800mm away from boundary and floorspace reduced accordingly. Relocation of ATM and Goods entrance door.
Granted Amendments 4 docs -
Handbridge Service Station Handbridge Chester CH4 7JF
85% historically approved · decision due ~12 Jul
Variation of Conditions 12 (Noise Levels) and 13 (Noise and Odour) of 18/02145/FUL
Awaiting decision Amendments 10 docs -
Handbridge Service Station Handbridge Chester CH4 7JF
Externally illuminated and Non Illuminated signage
Granted Advertising 6 docs -
Handbridge Service Station Handbridge Chester Cheshire CH4 7JF
Discharge of conditions 3 (construction management plan), 4 (petrol storage risk assessment), 5 (storage tanks), 6 (foul/surface water disposal) and 7 (site remediation) of planning permission 18/00688/FUL
Granted Conditions 24 docs
Other condition discharge and variation applications
In Cheshire West and Chester
-
26/00741/DIS Granted
Black Greyhound Hall Lane Wincham Northwich CW9 6DG
To discharge condition 2 (material details) of planning permission 25/00457/FUL.
-
26/01891/BGP Granted
Meadow Farm Meadow Lane Huntington Chester CH3 6DQ
Application for approval of condition 8 (Biodiversity Gain Plan) and informative note 3 of planning permission 24/03229/FUL.
-
26/01173/S73 Granted
Barn At Low Farm Post Office Lane Norley Northwich
Conversion of agricultural building to two dwellings, addition of detached garage and new access on to School Lane. -Variation of condition 2 (approved plans) and 3 (materials) of 24/03166/S73
-
26/03138/NMA Awaiting decision
Land Off Rilshaw Lane Winsford
Non-material amendment to 17/04426/REM (residential development of up to 215 dwellings, public open space with recreational facilities, site access, associated highways and infrastructure works) (Further amendments to condition 2 (Plots 57 - 109 drainage / levels / sections details)
-
26/03146/DIS Awaiting decision
49 London Road Northwich Cheshire CW9 5HQ
Discharge of condition 3 of 26/01480/PMA (Flood Resistance and Resilience Measures and Flood Warning and Evacuation Plan)