Planning application
Hoyer Industrial Estate South Road Stanlow Ellesmere Port
Works: Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolition of existing unit and erection of industrial unit (workshop/storage unit) with associated parking
As published by the council, reference 18/03246/FUL
Application record
- Reference
- 18/03246/FUL
- Type
- Full Application
- Status
- Approved
- Decision
- Granted As published: Approval
- Received
- 17 Aug 2018
- Validated
- 6 Sep 2018
- Decided
- 13 Feb 2019
- Ward
- Ellesmere Port Town
- Decision by
- Delegated Decision
Site history
Applications at this address on the Cheshire West and Chester register
This site has had 2 applications since 2018: 1 approved, 0 refused.
-
19/02718/DIS Awaiting decision
Hoyer Industrial Estate South Road Stanlow Ellesmere Port
Discharge of Condition 3 (Contamination) of 18/03246/FUL
Timeline
Dates from the published record
-
17 Aug 2018
Received by Cheshire West and Chester
-
6 Sep 2018
Validated
Checked as complete and ready for consideration.
-
13 Feb 2019
Decision issued: Approval
-
4 Oct 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Cheshire West and Chester granted permission on 13 February 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Hoyer Industrial Estate South Road Stanlow Ellesmere Port
96% historically approved · decision due ~16 Sep
Discharge of Condition 3 (Contamination) of 18/03246/FUL
Awaiting decision Conditions 2 docs -
Prowell Ltd South Road Stanlow Ellesmere Port CH65 4LY
Discharge of Condition 10 (Drainage) of 19/01947/REM (Erection of 2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1 (Following 17/04443/S73))
Granted Conditions 15 docs -
Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD
Discharge of condition 3 for Phase 1 only (landscaping) on planning permission 19/01947/REM
Granted Conditions 11 docs -
Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD
85% historically approved · decision due ~1 Sep
Non Material Amendment to 19/01947/REM (Increase in lower section of building height by 500mm to 11.5m, adjustment to external landscaping layout near building to the north elevation, omission of substation, adjustment to location of smoking and cycle shelters, and timber fence enclosure added to north west of building and front of building)
Awaiting decision Amendments 5 docsSmall domestic -
Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD
Discharge of Condition 6 (Acoustic Report) of 19/01947/REM (Erection of 2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1)
Granted Conditions 8 docs -
Progroup Ltd South Road Stanlow Ellesmere Port CH65 4LD
Variation of conditions to the planning permission 17/04443/S73 (and the associated reserved matters approval 19/01947/REM) for the construction of a manufacturing facility (2 manufacturing buildings (phase 2) with production areas, offices, high bay warehouse, vehicle loading building with associated parking hardstanding, landscaping, vehicle link to Phase 1 and construction of Conveyor bridge link to phase 1) (variation of construction work start hours from 8:00am to 7:30am (Mondays to Saturdays))
Withdrawn Amendments 6 docs
Other full applications
In Cheshire West and Chester
-
25/01159/FUL Granted
Land At Canaan Farm Bell O The Hill Road Tushingham Cum Grindley Malpas SY13 4QR
Demolition of existing dwelling and the erection of a new dwelling
-
25/03900/FUL Granted
Garden Lane Medical Centre 17 and 19 Garden Lane Chester CH1 4EN
Side extension to No.19 and Removal of shared canopy. Alterations to windows and doors for both No 17 and 19, including replacement of all windows of No.19
-
26/01251/FUL Granted
Renescience Northwich Griffiths Road Lostock Gralam Northwich CW9 7NU
Extension of the Northwich Biogas Facility Anaerobic Digestion plant including new infrastructure for biogas conversion to biomethane for injection to the gas grid
-
26/02166/FUL Granted
85 Hoole Road Chester CH2 3NJ
Erection of outbuilding and garden wall with gate
-
26/00072/FUL Granted
Land At Sandiway Lane Antrobus Northwich
Side extension to existing agricultural barn/workshop.