Planning application
Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Non Material Amendment to Planning application 13/01134/FUL to change the pipe diameters
As published by the council, reference 18/01646/NMA
Application record
- Reference
- 18/01646/NMA
- Type
- Non Material Amendment
- Status
- Approved
- Decision
- Granted As published: Approval
- Received
- 30 Apr 2018
- Validated
- 30 Apr 2018
- Decided
- 24 May 2018
- Ward
- Winsford Swanlow And Dene
- Parish
- Winsford Town Council
- Decision by
- Delegated Decision
Site history
Applications at this address on the Cheshire West and Chester register
This site has had 7 applications since 2018: 7 approved, 0 refused.
-
18/04333/DIS Granted
Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich
Discharge of Condition 27 (proposed route access) on planning permission 13/01134/FUL (Development of pipeline corridor of 3 pipes between the brinefield at Warmingham and the salt factory at Middlewich and 4 pipes and fibre optic cable link between the salt factory at Middlewich and the chemical works at Lostock, erection of buffer tank at Warmingham brine field, buffer tank pumping station and 4 settlement tanks used in the purification process at the salt factory, Middlewich, a pipe bridge crossing at the River Dane, pumping station at Blue Slates Farm, 2 buffer tanks and pumping station at the chemical factory, Lostock and other associated ancillary development) for Phase One Area
-
18/02814/DIS Granted
Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich
Discharge of conditions 8 (landscaping), 9 (nesting birds), 13 (wildlife protection plan), 14 (bat survey), 16 (walkover survey), 17 (large mammal survey), 19 (management/control of Japanese Knotweed and Himalayan Balsam), 20 (construction environmental plan), 21 (trees and hedgerows to be removed), 22 (arboricultural method statement), 23 (ecological mitigation measures), 25 (method statement), 28 (HGV routing list), 30 (programme of archaeological work), 31 (contamination of surface waters), 33 (lighting), 34 (noise and vibrations), 36 (remediation strategy), 41 (restoration works) and 42 (restoration aftercare) in relation to phase one.
-
18/01509/DIS Granted
Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich
Discharge of condition 3 (phases of development) of planning permission 13/01134/FUL
-
18/01087/DIS Granted
Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich
Discharge of Condition 27 on Planning Application 13/01134/FUL (Development of pipeline corridor of 3 pipes between the brinefield at Warmingham and the salt factory at Middlewich and 4 pipes and fibre optic cable link between the salt factory at Middlewich and the chemical works at Lostock, erection of buffer tank at Warmingham brine field, buffer tank pumping station and 4 settlement tanks used in the purification process at the salt factory, Middlewich, a pipe bridge crossing at the River Dane, pumping station at Blue Slates Farm, 2 buffer tanks and pumping station at the chemical factory, Lostock and other associated ancillary development)
-
18/00610/DIS Granted
Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich
Discharge of Condition 3 (phasing plan) on Planning Application 13/01134/FUL (Development of pipeline corridor of 3 pipes between the brinefield at Warmingham and the salt factory at Middlewich and 4 pipes and fibre optic cable link between the salt factory at Middlewich and the chemical works at Lostock, erection of buffer tank at Warmingham brine field, buffer tank pumping station and 4 settlement tanks used in the purification process at the salt factory, Middlewich, a pipe bridge crossing at the River Dane, pumping station at Blue Slates Farm, 2 buffer tanks and pumping station at the chemical factory, Lostock and other associated ancillary development)
-
18/00229/NMA Granted
Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich
Amendment to conditions 7, 22, 15, 18, 19, 20, 28, 30, 31, 39, 41 of permission 13/01134/FUL (Development of pipeline corridor of 3 pipes between the brinefield at Warmingham and the salt factory at Middlewich and 4 pipes and fibre optic cable link between the salt factory at Middlewich and the chemical works at Lostock, erection of buffer tank at Warmingham brine field, buffer tank pumping station and 4 settlement tanks used in the purification process at the salt factory, Middlewich, a pipe bridge crossing at the River Dane, pumping station at Blue Slates Farm, 2 buffer tanks and pumping station at the chemical factory, Lostock and other associated ancillary development)
Timeline
Dates from the published record
-
30 Apr 2018
Received by Cheshire West and Chester
-
24 May 2018
Decision issued: Approval
-
21 Nov 2026
Added to PlanIndex
Documents
8 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What this grant of permission means
Cheshire West and Chester granted permission on 24 May 2018, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich
Discharge of Condition 27 (proposed route access) on planning permission 13/01134/FUL (Development of pipeline corridor of 3 pipes between the brinefield at Warmingham and the salt factory at Middlewich and 4 pipes and fibre optic cable link between the salt factory at Middlewich and the chemical works at Lostock, erection of buffer tank at Warmingham brine field, buffer tank pumping station and 4 settlement tanks used in the purification process at the salt factory, Middlewich, a pipe bridge crossing at the River Dane, pumping station at Blue Slates Farm, 2 buffer tanks and pumping station at the chemical factory, Lostock and other associated ancillary development) for Phase One Area
Granted Conditions 11 docs -
Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich
Discharge of Condition 27 on Planning Application 13/01134/FUL (Development of pipeline corridor of 3 pipes between the brinefield at Warmingham and the salt factory at Middlewich and 4 pipes and fibre optic cable link between the salt factory at Middlewich and the chemical works at Lostock, erection of buffer tank at Warmingham brine field, buffer tank pumping station and 4 settlement tanks used in the purification process at the salt factory, Middlewich, a pipe bridge crossing at the River Dane, pumping station at Blue Slates Farm, 2 buffer tanks and pumping station at the chemical factory, Lostock and other associated ancillary development)
Granted Conditions 5 docs -
Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich
Discharge of Condition 3 (phasing plan) on Planning Application 13/01134/FUL (Development of pipeline corridor of 3 pipes between the brinefield at Warmingham and the salt factory at Middlewich and 4 pipes and fibre optic cable link between the salt factory at Middlewich and the chemical works at Lostock, erection of buffer tank at Warmingham brine field, buffer tank pumping station and 4 settlement tanks used in the purification process at the salt factory, Middlewich, a pipe bridge crossing at the River Dane, pumping station at Blue Slates Farm, 2 buffer tanks and pumping station at the chemical factory, Lostock and other associated ancillary development)
Granted Conditions 5 docs -
Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich
Amendment to conditions 7, 22, 15, 18, 19, 20, 28, 30, 31, 39, 41 of permission 13/01134/FUL (Development of pipeline corridor of 3 pipes between the brinefield at Warmingham and the salt factory at Middlewich and 4 pipes and fibre optic cable link between the salt factory at Middlewich and the chemical works at Lostock, erection of buffer tank at Warmingham brine field, buffer tank pumping station and 4 settlement tanks used in the purification process at the salt factory, Middlewich, a pipe bridge crossing at the River Dane, pumping station at Blue Slates Farm, 2 buffer tanks and pumping station at the chemical factory, Lostock and other associated ancillary development)
Granted Amendments 5 docs -
Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich
Discharge of condition 3 (phases of development) of planning permission 13/01134/FUL
Granted Conditions 7 docs -
Pipeline Between Warmingham Brinefield And Lostock Chemical Works Via Middlewich
Discharge of conditions 8 (landscaping), 9 (nesting birds), 13 (wildlife protection plan), 14 (bat survey), 16 (walkover survey), 17 (large mammal survey), 19 (management/control of Japanese Knotweed and Himalayan Balsam), 20 (construction environmental plan), 21 (trees and hedgerows to be removed), 22 (arboricultural method statement), 23 (ecological mitigation measures), 25 (method statement), 28 (HGV routing list), 30 (programme of archaeological work), 31 (contamination of surface waters), 33 (lighting), 34 (noise and vibrations), 36 (remediation strategy), 41 (restoration works) and 42 (restoration aftercare) in relation to phase one.
Granted Conditions Trees 38 docs
Other amendment applications
In Cheshire West and Chester
-
26/02302/LBC Granted
The Barn Smithy Lane Little Leigh Northwich CW8 4RA
Amendments to previously approved layout, to provide 3 no. letting rooms and 1 no. manager's suite, with revised external landscaping arrangements and boundary treatment details (part retrospective)
-
26/02301/FUL Granted
The Barn Smithy Lane Little Leigh Northwich CW8 4RA
Amendments to previously approved layout, to provide 5 no. letting rooms and 1 no. manager's suite, with revised external landscaping arrangements and boundary treatment details (part retrospective)
-
26/02933/NMA Withdrawn
Sycamore Cottage Back Lane Duddon Chester CW6 0EY
Non Material Amendment of 23/02269/FUL. (Amendments to previously approved doors and windows, cladding to single storey extension, and removal of Juliet balcony)
-
26/02870/FUL Granted
42 The Courtyard Bostock Hall Bostock Road Bostock Middlewich CW10 9JN
Retrospective application for the erection of a pergola within the rear garden
-
26/00633/LDC Granted
Lime Tree Farm Luddington Hill Utkinton Tarporley Cheshire CW6 9DW
This application seeks a Certificate of Lawful Existing Use under Section 191 of the Town and Country Planning Act 1990 to confirm that the existing garden and garage building are lawful.