Skip to content
PlanIndex Get alerts
Menu

Planning application

Blessed George Napier Roman Catholic School Addison Road Banbury OX16 9DG

Awaiting decision Cherwell 26/01843/F Full Development

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of approximately 280m of 2.4m high fencing.

As published by the council, reference 26/01843/F

Application record

Reference
26/01843/F
Type
Full Development
Status
Case Officer Assigned
Received
17 Jul 2026
Validated
4 Sep 2026
Ward
Banbury Calthorpe And Easington
Parish
Banbury
Decision by
Delegated
Postcode
OX16 9DG

Site history

Applications at this address on the Cherwell register

This site has had 4 applications since 2024: 3 approved, 0 refused.

  • 26/00353/F Granted

    Blessed George Napier Roman Catholic School Addison Road Banbury OX16 9DG

    Variation of Condition 10 (SUDS surface water sustainable drainage) of 22/01956/F - limited photographic evidence of the installation of the site SUDS, all evidence available submitted as part of the application

    Decided 12 May 2026 Full applications
  • 26/00339/DISC Granted

    Blessed George Napier Roman Catholic School Addison Road Banbury OX16 9DG

    Discharge of Condition 14 (sports pitch community use agreement) of 20/02745/F

    Decided 30 Jul 2026 Conditions
  • 24/00439/DISC Granted

    Blessed George Napier Roman Catholic School Addison Road Banbury OX16 9DG

    Discharge of Conditions 3 (Travel Plan) and 4 (School Bus Management Plan) of 22/01956/F

    Decided 20 Nov 2024 Conditions

Timeline

Dates from the published record

  1. 17 Jul 2026

    Received by Cherwell

  2. 4 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  3. 11 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 30 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Cherwell took a median of 57 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Cherwell for determination, against a statutory target of eight weeks. Over the last year Cherwell decided full applications in a median of 74 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Cherwell

  • 26/00019/F Refused

    Manor Court North Side Steeple Aston Oxfordshire OX25 4SE

    Two storey rear extension to replace existing single storey extension; window replacement; associated internal refurbishment

    6 Jan 2026 Full applications
  • 26/01852/F Granted

    4 Caldwell Road Banbury OX16 9FB

    Installation of air source heat pump to side elevation of dwelling

    21 Jul 2026 Full applications
  • 26/01627/F Granted

    14 Cherry Road Banbury OX16 0RL

    RETROSPECTIVE Double storey side and part single part double rear extension and widening of access and formation of associated dropped kerb (revised scheme of application 26/00663/F to include an additional single storey rear element)

    23 Jun 2026 Full applications
  • 26/00008/F Granted

    Bin Bay Flats 62 To 104 Mullein Road Bicester OX26 3WX

    Replacement bin bay involving demolition of existing re-constituted stone block bin bay and erection of new timber bin bay

    5 Jan 2026 Full applications
  • 26/01177/F Refused

    Eazylay Concrete Ltd Sugarswell Lane Shenington OX15 6HW

    RETROSPECTIVE - Change of Use of land from agriculture to a concrete batching facility and associated hardstanding, silos, aggregate bins, aggregate storage bays, water tanks and other associated development

    8 May 2026 Full applications