  • 24/05708/CAT Withdrawn

    Ridgeway South Street Great Waltham Chelmsford Essex CM3 1DF

    Persian Ironwood - (Marked T1, at west side of house) - Reduce in height by approximately _m; Silver Birch (Marked T2 and T3, north boundary) - Reduce in height by approximately _m; Walnut - Marked T4 - Remove - Reason: self grown, leaning over adjacent car park on north boundary.

    Submitted 4 Nov 2024 Trees
  • 24/01176/FUL Granted

    Broomfield Hospital Hospital Approach Broomfield Chelmsford CM1 7ET

    Construction of single storey critical containerised datacenter situated within a secure compound area to provide acoustic screening and high level of security with associated parking and access.

    Submitted 1 Nov 2024 Full applications
  • 24/01507/SUPA Granted

    Aldi Parkway Chelmsford Essex CM2 7FS

    Prior Approval Application for the installation of solar PVs onto the roof of the existing ALDI Foodstore, Parkway, Chelmsford

    Submitted 1 Nov 2024
  • 24/01502/FUL Granted

    Edwins Hall Edwins Hall Road Woodham Ferrers Chelmsford CM3 8RX

    Proposed extension to existing ancillary building

    Submitted 1 Nov 2024 Full applications
  • 24/00456/NMAT/1 Granted

    12 St Johns Road Chelmsford Essex CM2 9PE

    Non-material amendment to planning permission - 24/00456/FUL (Proposed single storey rear extension. Loft conversion with rear dormer. Alterations to fenestration) Removal of front window at first floor

    Submitted 1 Nov 2024 Amendments
  • 24/00810/NMAT/1 Granted

    Land At Powers Farm Cranham Road Little Waltham Chelmsford Essex

    Non-material amendment to planning permission 24/00810/FUL (Detailed planning application for enabling works at Powers Farm, Chelmsford. The enabling works will include provision of permanent Construction access for the duration of the infrastructure works, compound, wheel wash, welfare, haul roads, surface water management during the construction phase utilising the permanent drainage and sustainable urban drainage systems (SUDs) throughout the development, with all associated engineering and infrastructure works. This includes the removal of topsoil for recycling off site, the stockpiling of topsoil on site and the strategic ground re-profiling, stockpiling, and below ground works for Zone 3 Chelmsford Garden Community, Chelmsford) for the rewording of Condition 6 regarding Archaeological Post Excavation Assessment

    Submitted 1 Nov 2024 Conditions

Other months in 2024