Planning application
24/00810/NMAT/1
Land At Powers Farm Cranham Road Little Waltham Chelmsford Essex
Proposal
Non-material amendment to planning permission 24/00810/FUL (Detailed planning application for enabling works at Powers Farm, Chelmsford. The enabling works will include provision of permanent Construction access for the duration of the infrastructure works, compound, wheel wash, welfare, haul roads, surface water management during the construction phase utilising the permanent drainage and sustainable urban drainage systems (SUDs) throughout the development, with all associated engineering and infrastructure works. This includes the removal of topsoil for recycling off site, the stockpiling of topsoil on site and the strategic ground re-profiling, stockpiling, and below ground works for Zone 3 Chelmsford Garden Community, Chelmsford) for the rewording of Condition 6 regarding Archaeological Post Excavation Assessment
As published by the council, reference 24/00810/NMAT/1
Timeline
Dates from the published record
-
1 Nov 2024
Received by Chelmsford
-
19 Nov 2024
Decision issued: Permitted
-
31 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
23/00114/FUL Granted
Radial Distributor Route 2, South Of Wheelers Hill Little Waltham Chelmsford Essex
Detailed planning application to provide Northern Radial Distributor Road (NRDR) from Wheelers Hill to the North East Chelmsford Bypass, respectively west to east, as part of the Chelmsford Garden Community. Development, which will include carriageways, footways, cycleways, crossings and the diversion of Wheelers Hill Road. Landscaping and drainage for NRDR with all associated engineering works including strategic ground re-profiling.
-
23/00124/FUL Awaiting decision
Zone 3 Chelmsford Garden Community Beaulieu Parkway Chelmsford
Application for Hybrid planning permission at Powers Farm, Chelmsford; Outline Planning Permission with all matters reserved except means of accesses from/to the proposed Northern Radial Distributor Road (NRDR). Residential development of up to 1250 units, which comprises market/affordable and single family rental (SFR) / Build to Rent (BTR). Provision of Discovery Park North which will include open space, landscaping, formal sports pitches, pavilion and associated car parking. Internal vehicular carriageways, footways, cycleways and all pedestrian routes with associated landscaping and green infrastructure. Phased development (each and every phase (and/or sub-phase) being a separate and severable part of the development. Detailed planning permission for two spine roads north/south carriageway(s), cycleway(s) and footway(s) from/to the proposed Northern Radial Distributor Road North (NRDR) and one east/west spine road to Great Belsteads Village. Drainage and sustainable urban drainage systems (SUDs) throughout the development with all associated engineering and infrastructure works including strategic ground re-profiling, stockpiling, and below ground works
-
23/00124/OUT Awaiting decision
Zone 3 Chelmsford Garden Community Beaulieu Parkway Chelmsford
Application for Hybrid planning permission at Powers Farm, Chelmsford; Outline Planning Permission with all matters reserved except means of accesses from/to the proposed Northern Radial Distributor Road (NRDR). Residential development of up to 1250 units, which comprises market/affordable and single family rental (SFR) / Build to Rent (BTR). Provision of Discovery Park North which will include open space, landscaping, formal sports pitches, pavilion and associated car parking. Internal vehicular carriageways, footways, cycleways and all pedestrian routes with associated landscaping and green infrastructure. Phased development (each and every phase (and/or sub-phase) being a separate and severable part of the development. Detailed planning permission for two spine roads north/south carriageway(s), cycleway(s) and footway(s) from/to the proposed Northern Radial Distributor Road North (NRDR) and one east/west spine road to Great Belsteads Village. Drainage and sustainable urban drainage systems (SUDs) throughout the development with all associated engineering works including strategic ground re-profiling, stockpiling, and below ground works
Other conditions applications
In Chelmsford
-
24/01348/DOC/2 Awaiting decision
Whitegates Woodham Road Rettendon Wickford Essex SS11 7QW
Condition 3 - Biodiversity Net Gain Plan (The BNG Plan) Conditon 4 - Habitat Management and Monitoring Plan (HMMP) Condition 5 - Materials
-
25/01229/DOC/2 Awaiting decision
5 Glebe View Chelmsford CM2 8PZ
Condition 5 - Boundary treatments, Condition 6 - Storage of refuse and recyclable materials, Condition 9 - Secure and covered bicycle parking, Condition 10 - Hard and Soft landscaping
-
25/01456/DOC/1 Awaiting decision
58 Writtle Road Chelmsford CM1 3BU
Condition 3 - Materials, Condition 5 - Contamination & Condition 11 - Construction Management Plan
-
26/00467/DOC/1 Awaiting decision
The Millstone Main Road Little Waltham Chelmsford Essex CM3 3PF
Condition 4 - Written Scheme of Investigation
-
21/00555/DOC/9 Awaiting decision
Hanningfield Ltd Southend Road East Hanningfield Chelmsford Essex CM2 7FU
Condition 4 - Details of the final location, design, materials and acoustic attenuation - panel arrays, transformers, inverters, control room, substations, power conversion system, HVAC unit, all auxiliary buildings