Planning application
26/00865/FUL
146 Broomfield Road Chelmsford CM1 1RN
Proposal
Proposed demolition of existing single-storey extension, construction of single-storey extension to rear.
As published by the council, reference 26/00865/FUL
Timeline
Dates from the published record
-
26 Jun 2026
Received by Chelmsford
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Chelmsford for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
22/05202/TPO Granted
117 Chester Place Chelmsford Essex CM1 4NQ
T7 (Lime - marked T1) - Remove epicormic growth & Reduce overhang; T6 (Sycamore - marked T3) - Sever ivy & crown lift by 5m; T9 (Crab apple - marked T4) - Reduce northern and eastern lateral limbs up to 1 m to suitable growing points; T3 (Sycamore - marked G1) - Reduce northern limbs up to 1 m to suitable growing points. Reasons for all: Good arboricultural practice and to promote healthy growth (Have removed T11 Holly, T6 Acer, T9 and T10 Ash, G2 Maple and Willow, T14 Apple, T12, T5 and T2 Sycamore as not under TPO)
-
19/01658/FUL Withdrawn
152 Broomfield Road Chelmsford CM1 1RN
Front garden wall and new entrance gate
-
26/00563/FUL Granted
6 Second Avenue Chelmsford Essex CM1 4EU
Single storey rear extension and detached outbuilding
-
17/02086/NMAT/1 Granted
13 First Avenue Chelmsford Essex CM1 1RX
Non-material amendment to planning permission 17/02086/FUL - (Two storey side extension and first floor rear extension). To increase the size of the garage at the front.
-
26/05125/TPO Granted
119 Chester Place Chelmsford Essex CM1 4NQ
T1 - Horse Chestnut tree - Reduce crown by 1m. Reason: To clear away from Church building
-
19/01377/FUL Granted
132 Broomfield Road Chelmsford CM1 1RN
Two storey rear extension, hip-to-gable conversion and raised ridge height by 300mm and loft conversion. Two dormers to front elevation and four to rear elevation. Addition of windows to first floor. Juliette balconies to rear.
Other full applications applications
In Chelmsford
-
26/00587/FUL Granted
54 Allens Road Ramsden Heath Billericay CM11 1JA
Replacement of boundary fencing
-
26/00753/FUL Granted
52A Swiss Avenue Chelmsford Essex CM1 2AD
Ramped access
-
26/00746/FUL Granted
1 Russell Green Cottages Cranham Road Boreham Chelmsford Essex CM3 3BB
Installation of a close boarded fence along the property boundary.
-
26/00026/HHPA Awaiting decision
4 Birds Close Ramsden Heath Billericay CM11 1JB
Proposal for the removal of the existing rear conservatory to be replaced with a single story, timber frame, flat roof extension to increase thermal efficiency and provide living space. The proposed extension will feature external cladding to the full rear of the house, bifold doors to the garden and a flat roof. Proposed works match the existing footprint of the conservatory.
-
26/00644/FUL Granted
4 Oaklea Avenue Chelmsford Essex CM2 6BY
Replacement of two existing wooden sheds with a single timber framed shed with a brick built chimney on the NE gable end and a barbecue.