Planning application
Potton Quarry, Potton Road, Everton, Sandy, SG19 2JH
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Prior Approval of Mineral Planning Authority relating to the erection of a double-storey site office within the existing Potton Quarry site compound (Development Ancillary to Mining Operations).
As published by the council, reference CB/25/03135/MWPA
Application record
- Reference
- CB/25/03135/MWPA
- Type
- Minerals & Waste Prior Approval
- Status
- Registered
- Received
- 1 Oct 2025
- Validated
- 1 Oct 2025
- Parish
- Potton
- Postcode
- SG19 2JH
Timeline
Dates from the published record
-
1 Oct 2025
Received by Central Bedfordshire
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 26 November 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Central Bedfordshire took a median of 71 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Central Bedfordshire for determination, against a statutory target of eight weeks. Over the last year Central Bedfordshire's median decision took 71 days. More in our guide to how long planning decisions take.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
19 Everton Road Gamlingay SG19 2JJ
Submission of details required by condition 2 (Materials) of planning permission S/0845/07/F
Granted Conditions 7 docs -
21A Everton Road Gamlingay Cambridgeshire SG19 2JJ
Erection of machinery shed for the housing of garden and ancillary machinery for maintenance of owner's land and garden
Granted Full applications 13 docsSmall domestic
Other prior approval applications
In Central Bedfordshire
-
CB/26/02527/EPD Decided
Land at Oakwell Park, LU5 6GU
Electricity Works Permitted Development: To relocate an existing substation
-
CB/26/02449/EPD Decided
Biggleswade Eastern ELC Sub Station, Holme Crescent, Biggleswade, Bedfordshire. SG18 8DF
Electricity Works Permitted Development (Install a new 10kVA generator on new concrete foundation. Install power duct from source to genny. Install wide cable trunking on concrete base. Install AMF panel on a new pole fixed to concrete base. Retain the Eltek PSU cabinet)
-
CB/26/02429/EPD Withdrawn
Four Fields, Tebworth Road, Tebworth, Leighton Buzzard, LU7 9PZ
Electricity Works Permitted Development related to an overhead line.
-
CB/26/02317/EPD Awaiting decision
Four Fields, Tebworth Road, Tebworth, Leighton Buzzard, LU7 9PZ
Electricity Works Permitted Development, disconnection of existing O/H to U/G single phase service and connection of a new three phase O/H service with a new pole installation.
-
CB/26/01178/EPD Granted
7 Water End, Wrestlingworth, Sandy, SG19 2HA
Electricity Board Notification: To rectify an existing safety compliance issue with the current low voltage overhead service to the property No 7 Water End, SG19 2HA. The proposal is to install a new intermediate pole and install new underground cable. The existing low voltage overhead service will then be removed.