Skip to content
PlanIndex Get alerts
Menu

Planning application

Ballycastle Shared Education Campus compising lands at 33 Rathlin Road, Ballycastle and Cross & Passion College 10 Moyle Road, Ballycastle

Awaiting decision Causeway Coast and Glens LA01/2026/0904/A Advertisement

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of 60x School signage consisting of 31x Road Signage, 14x Directional, 2x Aluminium Entrance Totems (illuminated), 9x Stainless Steel Lettering and 4x Aluminium Composite.

As published by the council, reference LA01/2026/0904/A

Application record

Reference
LA01/2026/0904/A
Type
Advertisement
Status
Consultation Open
Received
13 Aug 2026
Validated
28 Aug 2026
Ward
Ballycastle

Comment by 23 September 2026

The council is taking comments on this application until then. Comments go to Causeway Coast and Glens through their own planning portal.

Timeline

Dates from the published record

  1. 13 Aug 2026

    Received by Causeway Coast and Glens

  2. 28 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 2 Sep 2026

    Added to PlanIndex

  4. 8 Sep 2026

    Status changed to Consultation Open

    Previously Valid.

  5. Decision

    Awaiting decision

    Decision expected by 23 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Causeway Coast and Glens took a median of 86 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

23 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Causeway Coast and Glens for determination, against a statutory target of eight weeks. Over the last year Causeway Coast and Glens decided advertisement consent applications in a median of 123 days. More in our guide to how long planning decisions take.

About advertisement consent applications

Advertisement consent is judged on two things only: amenity and public safety, not competition or other planning considerations. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Causeway Coast and Glens

  • 1 Main Street, Garvagh

    Erection of 7 x commerical signs consisting of 2 x Shop Signs (illuminated), 1 x Projecting sign, 1 x illuminated Building sign, 1 x Banner sign, 1 x Wall Mounted sign and 1 x non illuminated building sign (Retrospective)

    12 May 2026 Advertising
  • Stone building located approx. 145m South East of 208 Ballybogy Road, Portrush

    1 x non-illuminated shop sign

    3 Aug 2026 Advertising
  • Outside the old Head Post Office Building at 101-101A Main Street, Limavady.

    Proposed 2no. digital 75-inch LCD display screens on each side of Digital Street Hub (illuminated)

    23 Jan 2026 Advertising
  • Entrance to North West Hotel and Spa Complex, Lands Immediately West of 120 Ballyreagh Road, Portstewart

    The erection of temporary hoarding with vinyl advertising graphics promoting branding and amenities of hotel development.

    16 Jul 2026 Advertising
  • 2 Riverside Park North, Coleraine

    Erection of 13 x Retail signage (internally illuminated)

    11 May 2026 Advertising