Skip to content
PlanIndex Get alerts
Menu

Planning application

Rear of No. 14 Ann Street, Ballycastle

Awaiting decision Causeway Coast and Glens LA01/2026/0777/F Full

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposed Change of Use from storage to two units of accommodation for short-term letting

As published by the council, reference LA01/2026/0777/F

Application record

Reference
LA01/2026/0777/F
Type
Full
Status
Under Consideration
Received
6 Jul 2026
Validated
27 Jul 2026
Ward
Ballycastle

Timeline

Dates from the published record

  1. 6 Jul 2026

    Received by Causeway Coast and Glens

  2. 27 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 7 Aug 2026

    Added to PlanIndex

  4. 14 Aug 2026

    Status changed to Consultation Open

    Previously Valid.

  5. 2 Sep 2026

    Status changed to Under Consideration

    Previously Consultation Open.

  6. Decision

    Awaiting decision

    Decision expected by 21 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Causeway Coast and Glens took a median of 86 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Causeway Coast and Glens for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Rear of No. 14 Ann Street, Ballycastle

    LA01/2026/0868/LBC Submitted 19 Aug 2026 0m away

    97% historically approved · decision due ~14 Oct

    Proposed Change of Use from storage to two units of accommodation for short-term letting.

    Awaiting decision Heritage and listed buildings 12 docs
    Several homes
  • 20 Ann Street, Ballycastle

    LA01/2024/0847/LBC Submitted 26 Jul 2024 28m away

    Proposed internal alterations to non-original counters, furniture and internal finishes front and back of house

    Granted Heritage and listed buildings 16 docs
  • 2b Ann Street, Ballycastle

    LA01/2026/0443/F Submitted 28 Apr 2026 44m away

    Retrospective Change of Use from First floor storage to residential use

    Granted Full applications 27 docs
  • YARN, 24-26 Ann Street, Ballycastle

    LA01/2026/0124/F Submitted 27 Jan 2026 61m away

    Retention Of Unauthorised Canopy, Wooden Fence, Sliding Gate And Steel Supports

    Granted Full applications 27 docs
    Small domestic
  • Boyd Arms, 4 The Diamond, Ballycastle

    LA01/2026/0419/F Submitted 24 Apr 2026 85m away

    98% historically approved · decision due ~24 Jun

    Conversion of basement storage areas to tourism rental accommodation including removal of 2no. internal walls. Use of open basement area as smoking are and beer garden. Construction of new stair to connect basement to ground floor.

    Awaiting decision Full applications 17 docs
  • Boyd Arms, 4 The Diamond, Ballycastle

    LA01/2026/0420/LBC Submitted 24 Apr 2026 85m away

    97% historically approved · decision due ~24 Jun

    Conversion of basement storage areas to tourism rental accommodation including removal of 2no. internal walls. Use of open basement area as smoking are and beer garden. Construction of new stair to connect basement to ground floor.

    Awaiting decision Heritage and listed buildings 12 docs

In Causeway Coast and Glens

  • Directly adjacent to the North of 24 Atlantic Road, Coleraine.

    Proposed Dwelling and Domestic Garage.

    9 Jun 2026 Full applications
  • 263 Corkey Road, Cloughmills, Ballymena

    Internal alterations, new patio door at ground floor and extension at first floor to create additional bedroom suite.

    21 May 2026 Full applications
  • Lands immediately NW of 2 Princess Gardens, Cloughmills

    Proposed new dwelling (Amended Plans and 3D Montage)

    8 Apr 2026 Full applications
  • 37 Parklands, Ballymoney

    Proposed rear and side extension to existing dwelling and alterations to side elevation to add new ground floor window

    31 Mar 2026 Full applications
  • 2 The Hawthorns, Ballysally, Coleraine

    Proposed single-storey rear extension, internal alterations to existing dwelling and conversion of garage to provide additional space for the dwelling.

    18 Jun 2026 Full applications