Planning application
The Bridge House, 1b Knockans, Rathlin Island, Ballycastle
Works: Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Replacement of roof and wall cladding, new windows and external door and repair to chimney stack. Internal alteration to layout and installation of heating and insulation.
As published by the council, reference LA01/2026/0351/LBC
Application record
- Reference
- LA01/2026/0351/LBC
- Type
- Listed Building Consent
- Status
- Under Consideration
- Received
- 24 Mar 2026
- Validated
- 13 Apr 2026
- Ward
- Torr Head and Rathlin
Timeline
Dates from the published record
-
24 Mar 2026
Received by Causeway Coast and Glens
-
13 Apr 2026
Validated
Checked as complete and ready for consideration.
-
29 Jul 2026
Added to PlanIndex
-
7 Aug 2026
Status changed to Under Consideration
Previously Site Inspection Complete.
-
Decision
Awaiting decision
Decision expected by 8 June 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Causeway Coast and Glens took a median of 90 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Causeway Coast and Glens for determination, against a statutory target of eight weeks. Over the last year Causeway Coast and Glens decided heritage and listed building applications in a median of 133 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Other heritage and listed building applications
In Causeway Coast and Glens
-
LA01/2026/0404/LBC Granted
Roe Valley Resort, 10 Lisnakilly Road, Limavady
Internal alterations to five first floor bedrooms - four bedrooms will have new openings created and new additions; one bedroom will have new additions
-
LA01/2026/0887/LBC Awaiting decision
St Marys Chapel, 99 Grove Road, Swatragh, Maghera
Repairs carried out to flat roof on the tower and re point parts off the existing tower
-
LA01/2026/0868/LBC Awaiting decision
Rear of No. 14 Ann Street, Ballycastle
Proposed Change of Use from storage to two units of accommodation for short-term letting.
-
LA01/2026/0358/LBC Granted
Roe Valley Resort 10 Lisnakilly Road, Limavady
External alterations to include the installation of new hardwood external door with ironmongery, and erection of low-level curved walls and pillars to front entrance. Internal alterations to include the removal of stairwell, creation of two new openings to the left and right of entrance hall, reinstatement of fireplace and glazing to first floor balcony arches.
-
LA01/2026/0164/LBC Granted
140 Main Street, Garvagh
Proposed window and external door repair works and replacement.